Amy Worrall
Member
- Joined
- 18 Dec 2012
- Messages
- 143
I've just become aware of the High Speed UK project, which is a suggestion of an alternative to HS2. They claim that it will both be cheaper an also connect more cities.
Map of the route:
http://www.highspeeduk.co.uk/routediagrams.html
Their claimed advantages over HS2:
http://www.highspeeduk.co.uk/hsukbenefits.html
Can anyone tell me what the catch is?
Amy
Map of the route:
http://www.highspeeduk.co.uk/routediagrams.html
Their claimed advantages over HS2:
http://www.highspeeduk.co.uk/hsukbenefits.html
We believe that the UK should have the best possible transport system, with new high speed railways at its core. High Speed UK offers the following benefits:
- All 9 primary cities of the Midlands, the North and Scotland directly interconnected by high speed trains running at hourly (or better) frequency.
- Direct hourly high speed services to Heathrow from all 9 primary cities of the Midlands, the North and Scotland.
- Many other regional cities (Bristol, Southampton, Reading, Oxford, Milton Keynes, Northampton, Leicester, Derby, Doncaster, York, Darlington, Warrington) directly connected to all 9 primary cities.
- Intercity journey times reduced by average 40% across entire intercity network of the Midlands, the North and Scotland (whereas HS2 might manage 5%).
- Journey times to London equivalent to those of HS2.
- Step-change capacity enhancement on all main line corridors (except Great Western).
- 4 new tracks on critical London-Leicester section.
- Full interconnectivity between local and national high speed network.
- Easy access to HS1, achieved at minimal cost.
- High speed services accessing all existing intercity hubs no new termini or parkway stations.
- Major regional growth generated through improved regional connectivity.
- Environmental damage minimised through following existing transport corridors.
- Step-change road-to-rail modal shift enabling potential 600Mt reduced CO2 emissions over 40 years, in broad compliance with targets of 2008 Climate Change Act (whereas HS2 will be no better than carbon neutral).
- Capital cost circa 25% less than HS2.
- As for profitability of the new High Speed UK network... not easy to estimate, but our fully integrated system beats both the existing railway and HS2 for operational efficiency, by an order of magnitude. This can only indicate more economic and profitable operation.
Can anyone tell me what the catch is?
Amy
