WESSEX158
Member
- Joined
- 7 Aug 2010
- Messages
- 35
Does anyone else think the "preffered" route for high speed two is wrong?:roll:
Both realy. I think a route near the M1/45 would be better with some sort of P&R station near the M25 and a stop near Milton Keynes. The South Midlands is the largest growth area in the UK

Read the report!
The answers are all there, including why this route was chosen and why following motorways was investigated and found not be practical or desirable for a variety of reasons. In an ideal world you'd build the whole thing in a dead straight tunnel, but in the real world you have to compromise - this route is just that, a compromise.
Chris
Since the current Government seem to have committed to HS2, it will be interesting given the recent review of HS2 by Lord Mawhinney, whether any of the suggestions are taken on board. Also given the difference in what the Labour plan was compared to the current Governments suggested plans, it will be interesting to see proper plans rather than just talk.
WESSEX158, have you been reading my old posts? (Just kidding) I agree with your revival of the GCR London Extension, especially considering the old trackbed is almost unobstructed for most of the route. The sections in Rugby, Leicester and Nottingham would need lots of diversions (or tunnels) to avoid major demolition work. Nottingham Victoria may be recoverable, but only if you want another New Street under the shopping centre.
The HS1 link is essential if we want the line to become part of a wider European network rather than an extra main line to London (this was the original plan for the GCR in the 1890s). I also agree about expanding St Pancras if we can move Midland Road over a bit. Unfortunately, the British Library is currently on top of the prime site, but I'm sure that a free 'people-mover'-type shuttle could operate between King's Cross/St Pancras and Euston at Circle Line level without too much difficulty.
frankly a west coast HS2 would only provide a marginal time saving south of Preston, a matter of minutes to Manchester.
If we chose 186mph (300km/h) that would be an increased top speed by 49%, plus the better track profiles should see arrival and departure to the stations as much quicker. However, without looking at a map it's hard to pick out specific places, but I'm very concious of how slow XC trains seems to be when you get around Sheffield and north thereof.
Any idea of using the GCR was put to rest a long time ago - every cutting would need substantial widening, every embankment would need rebuilding (as well as widening) to a known standard as would every bridge and culvert, every tunnel would need to be re-bored, a vast number of small diversions due to the higher linespeed, plus the need for much larger diversions at the places you mention.
It's a nice idea, but its hard to justify the much greater expense with a lot more demolition of people's houses, and this is reflected by how little the GCR features in the HS2 planned route.
...plus it would be a shame to lose the old trackbed!
Chris
From Brackley to Leicester, they would carry freight between Didcot Yard and the MML
From Brackley to Leicester and Nottingham to Sheffield, they would carry cross-country's Reading-Leeds services and the transferred XC Norwich-Liverpool/Glasgow services
The idea is to produce a mixed-traffic railway as relief for the MML and to run high-speed services to the Continent from Manchester, Leeds and Scotland while taking the preserved GCR into account. Ambitious, but possible.
How is freight getting from Didcot to Brackley ?? You'd need a new chord at Claydon that never used to exist or try and re-open Banbury-Woodford branch. The majority of future freight on that axis will come from Southampton and unless it was bound for the North West where it would likely take advantage of E-W and up the WCML from Bletchley, the rest is still likely to end up going through the West Mids.
It was suggested that Reading - Leeds would miss New St ?? bonkers.
Get the MML up to 125 where it can (which is going to happen), electrify it (possible), and then sort out the rubbish signalling (years away) and the MML wouldnt need relief.