And we're always going to have the Classic Compatible stock to run round the place. Is going to have a lifespan of about 40 years, and there isn't really anywhere to displace it to. From a Day 1 working timetable only continuing through Rugley at Stage 1, I work it out at about...
8 units per hourly 400m service (2hr per diagram, 2 units, 2 directions)
With the 400m services being formed of:
3tph Manchester
1tph Liverpool & Chester / Holyhead (Hauled from Crewe)
1tph Liverpool & Preston / Blackpool
1tph Liverpool & Glasgow (Glasgow addition requiring 4 more units)
So in total I get that we'll be needing (without any HS services from Manchester to Birmingham at Stage 1) 52 200m long Classic Compatable sets available for use, so thats a fleet of about 60 odd.
With the initial captive network needing 22 - 26 units for Birmingham - Euston (At 400m long) with these units being formed of 2x200m Captive units.
When Manchester - Euston and Leeds - Euston gets included, working on 2hr including turnarounds thats an additional (assuming again, maximum units on routes) that is 24 for Manchester and 16 for Leeds, plus maintenance spares so lets say an additional 50 captive units, brining the captive fleet up to about 80 units, plus any international, Birmingham - Leeds / Manchester and Heathrow units brings the fleet up to about 100 as a rough guess.
Classic Compatable wise, we'd have 24 units kicking about spare from Stage 2, these again, would be able to work 3tph doubled up on 2hr routes, however, if we make it 2tph, all splitting at Doncaster, York or East Midlands Parkway, where one unit will continue to an 'off route' destination, such as Lincoln, Hull, Harrogate, Scarbrough etc.
If we send the front of 1tph to Edinbrugh and the other to terminate at Newcastle and call at some intermediates, with others only calling York.
Working off single unit diagrams for modelling purposes, although units will run double to Doncaster or York, York being via Leeds or Doncaster, whatever is quicker.
1tph to Edinburgh can be modelled as an 8hr end to end including turnarounds, end to end, so thats 8 units, Newcastle is lets say 6 hours, so 6 units.
Hull / Lincoln would run at a 5hr route and Harrogate / Scarborough would be about the same, so avaraging it out, you get 10 units used up by the 'splitting bits' of services to off route destinations.
Damn, that appears to conveniently have all the Classic Compatible stock from the now Captive Manchester route used up... How convenient...
--- old post above --- --- new post below ---
The loss of time from routing London trains to Glasgow via Leeds and Edinburgh is minimal considering the service speeds we are talking about.
So the Moors and Dales of North Yorkshire isn't a national park any more?
Yeah, you moaning NIMBY's of the Chilterns, National Park, not just an AONB...