In my opinion:
1) The now "locked in" route is poorly chosen, it has been set to obtain the fastest end to end journey time between London and Birmingham without consideration that the line is, allegedly atleast, about "capacity" rather than outright speed and should therefore take in intermediate towns to allow more traffic to be transferred to it. The Japanese experience shows that, especially with moving block signalling, a mix of "stopping" and "express" traffic is feasible and the provision of stopping services would not prejudice the express service journey times significantly.
2) The choice of rolling stock that the government is apparently leaning towards making is wrong, with the line being about capacity on the London Birmingham axis the emphasis should be on ensuring that each trainset has the largest possible number of seats, we should therefore be favouring double decker trainsets.
3) I don't think any serious studies have been done on the financial viability of maintaining current service levels on the classic WCML after the construction of the line, especially with regards to ensuring "secondary" stations are not badly damaged in terms of long distance destinations.
Once end-to-end traffic has been abstracted they could require drastically increased subsidy payments.
1) The now "locked in" route is poorly chosen, it has been set to obtain the fastest end to end journey time between London and Birmingham without consideration that the line is, allegedly atleast, about "capacity" rather than outright speed and should therefore take in intermediate towns to allow more traffic to be transferred to it. The Japanese experience shows that, especially with moving block signalling, a mix of "stopping" and "express" traffic is feasible and the provision of stopping services would not prejudice the express service journey times significantly.
2) The choice of rolling stock that the government is apparently leaning towards making is wrong, with the line being about capacity on the London Birmingham axis the emphasis should be on ensuring that each trainset has the largest possible number of seats, we should therefore be favouring double decker trainsets.
3) I don't think any serious studies have been done on the financial viability of maintaining current service levels on the classic WCML after the construction of the line, especially with regards to ensuring "secondary" stations are not badly damaged in terms of long distance destinations.
Once end-to-end traffic has been abstracted they could require drastically increased subsidy payments.