YorkshireBear
Established Member
- Joined
- 23 Jul 2010
- Messages
- 9,664
I thought some of the HS2 platforms were going to be able to be used by WCML too.
I thought some of the HS2 platforms were going to be able to be used by WCML too.
Please do enlighten us as to what replacement you're cooking up. What improvements will it make over the adhesion railway for the vital business of transporting 92% of the land freight across the Nullabor Plain? How will it enable us to reduce the amount of fossil fuel needed to get a 1.8km train of double-stacked containers across a continent?
MagLev has some possibilities for short shuttles like the Shanghai Airport, but not for the core business of the railway which is transporting great masses of freight and people across great distances.
I believe the intention is to increase frequency at the stations already served by some WCML Intercity services (and those served by the LM services), increase regional journey opportunities from a number of stations along the WCML to other WCML stations and to provide more capacity for these sorts of journeys.Thanks.
Will this not limit the capacity of the WCML to serve towns not currently served (eg Telford etc). I thought that this was one of the selling points of HS2: that it would release capacity on the WCML for direct services to places not currently served.
I believe the intention is to increase frequency at the stations already served by some WCML Intercity services (and those served by the LM services), increase regional journey opportunities from a number of stations along the WCML to other WCML stations and to provide more capacity for these sorts of journeys.
Rather than adding a whole series of trains serving new destinations to the WCML, extending the remaining WCML services to other destinations is being considered. For example, Aberystwyth and Wrexham, via Shrewsbury and Telford, have been suggested as possible extensions of the intended half hourly Birmingham WCML service.
It's clearly unrealistic to assume that every railway in the world would suddenly convert to new technology, there are already plenty of non-compatible systems working perfectly well around the world. 4'8".5 isn't the only gauge. Monorail/maglev have their place alongside these systems, not necessarily as a replacement. Improved transport systems shouldn't be dismissed simply because they're different, there's plenty of variety already. There isn't a world transport authority forcing everybody to use the same gauge or system, now that would be silly.
Greengauge 21 suggest using 221s "or other suitable 200 km/h trains", as the lower capacity of the 221s won't represent such a problem for West Coast services. I'm not sure of their logic there if the idea of HS2 is to increase the capacity available on the WCML by allowing additional journeys between WCML stations through the introduction of extra stops on the remaining long distance services, especially given that the frequency of long distance services will be reduced.That would make sense, assuming that the number of units needed isn't too many more than we've currently got.
Actually, that would either need electrification west of Wolverhampton, Locomotive power being provided for that section, or running diesel units (Voyagers?) over the whole trip. I doubt this is included for in the original price of HS2.
Finally, some sensible comment on Delor's other bampot EU plan behind HS2!
The continent is the final destination for HS2
There is a tantalising mystery at the heart of the immense row over the Governments proposed new HS2 railway line. Every conceivable argument commercial, economic and environmental seems to be against what has been called the worst waste of public money for generations. The scheme makes no practical sense at all. And yet our Government seems determined to railroad it through regardless.
Why does the driving force behind this insane project have to be a state secret?
To me it looks looks rather angular and 'industrial' also the current Curzon Street station building is rather lost. Obviously it's got to be functional but there's no reason it can't be made attractive too. I hope they could do something more along the lines of Waterloo International rather than St P domestic.
Ditto The Guardian, which is now stating that a Government report confirms HS2 is a waste of money and the WCML could be fixed by merely extending trains to 12-cars and getting rid of first class..........
Finally, some sensible comment on Delor's other bampot EU plan behind HS2!
There is a tantalising mystery at the heart of the immense row over the Governments proposed new HS2 railway line
a state secret?
The hidden story
But why cant they just tell us this? Why does the driving force behind this insane project have to be a state secret?
routinely deceitful about almost everything they do
No doubt, since one can fly from Birmingham to Paris in under an hour, such trains will prove as financially disastrous as their Dutch equivalent
So in respect to HS2, why would a different gauge/system be warranted given the requirement for classic compatible stock to use it and also to be able to provide cities north of London with the potential to link to Europe via HS1?
Out of interest does the Guardian give a reference for this "Government" report. It would be interesting to se it
Who would expect a monorail/maglev system to be compatible? Not even politicians.
Even more importantly, it adds capacity for freight on the WCML and night freight on HS2 for intermodal services to/from Europe. When only about 7% of surface freight transport in Britain goes by rail, increasing the amount carried by rail should be a national priority.But the HS2 trains won't just run to Birmingham, Manchester and Leeds. They'll provide faster journey times to other destinations, such as Liverpool and Glasgow, as well. And HS2 will also, hopefully, provide additional capacity between intermediate stations on the WCML. If HS2 gets to Leeds it should make a pretty big difference to the Crosscountry network as well, although not as big a difference as it would have made ten years ago, now that Leeds is 2 hours and Newcastle is 3 hours from Birmingham.
So please tell us why in your opinion HS2 should be considered for a completely different system?
I think one of the major problems we have with combining all HS2 discussion into a single thread is the fact we're discussing things that will happen, things some of us want to happen and things that definitely are never going to happen all at once.
.
Could we give some contribtors their own thread please
Every journey starts with a single step.
Every network has to start (and end) somewhere.
The journey that started with two steel rails will not go on forever.
Every journey starts with a single step.
Every network has to start (and end) somewhere.
The journey that started with two steel rails will not go on forever.
It's clearly unrealistic to assume that every railway in the world would suddenly convert to new technology, there are already plenty of non-compatible systems working perfectly well around the world. 4'8".5 isn't the only gauge. Monorail/maglev have their place alongside these systems, not necessarily as a replacement. Improved transport systems shouldn't be dismissed simply because they're different, there's plenty of variety already. There isn't a world transport authority forcing everybody to use the same gauge or system, now that would be silly.
The anti-HS2 people can have a voice, but need to concentrate on genuine reasons for why HS2 may not be a good idea, or their concerns for the route, what trains will run, how long it will take. Nobody is probably of the opinion that everything planned is exactly right.
What annoys me is that you have people in towns along the route who come up with nonsense just because they simply don't want it there. They claim it's not needed, but then say you should upgrade the WCML to meet demand (so, thus, they are actually admitting we need new infrastructure). I bet if the route was totally changed, they'd change their mind and a new group would appear elsewhere.
Let's all be HONEST about why we want (or don't) want HS2, rather than being so desperate to find other reasons to get it shelved. What next, claims that the noise from HS2 will cause cancer? That children trespassing on the line will stand no chance with trains going so fast..? If they thought these things would work, they'd try them!
I think the pro-HS2 people are probably more critical of some of the finer details than the others. Given it's almost certainly going to happen, perhaps they should now contribute to ensuring it's a success.