Looking at the predicted service patterns.
https://www.gov.uk/government/uploa...on_of_the_service_patterns__January_2013_.pdf
I have concerns about the number of terminal stations on HS2 (Euston, Curzon St, Picadilly, Leeds) and the limitations this places on through services.
At a time when DB are spending quite a bit of money to make their stations through running (new Berlin Hbf, remodelling Stuttgart Hbf) it looks a bit shortsighted.
I know that in each case the cost of tunneling HS lines through cities would be high. But I wonder if at the very least for some of these stations, there shouldn't be passive provision to extend lines beyond termini at a later date. For example by building subterranean platforms with a void beyond the end, used for something which could be moved later on. (shopping/parking/catering depot/etc). This void could then be used to launch TBMs at a later date if need be. But I suppose BCRs and value engineering prevent spending anything significant on future proofing...
Also notable is that possible HS2-Kent/beyond services are omitted.