The point is it only takes a couple of minutes to type correctly and if an individual can't be bothered to do that on a forum, who's to say that they will up their act in another setting? Posters cannot hope to be taken seriously if they use poor grammar / spelling.
So sarcastic and obvious that you had to explain it's meaning to everyone else.
Just watched BBC Look East and the Taxpayers Alliance is claiming the WCML has plenty of capacity and we don't need a new line at all.
Are they serious?!
Just watched BBC Look East and the Taxpayers Alliance is claiming the WCML has plenty of capacity and we don't need a new line at all.
Are they serious?!
They are also claiming that the competition between HS2 and the existing railway will lower ticket revenue by £10bn and that people having cheaper rail travel is a bad thing, so go figure.
:roll:
They are also claiming that the competition between HS2 and the existing railway will lower ticket revenue by £10bn and that people having cheaper rail travel is a bad thing, so go figure.
Competition with the existing network
The business case ignores the potential impact to the revenue of HS2 services as a result of competition from operators on the existing network. But this is already happening today – there are three operators between Birmingham and London, offering eight trains an hour between them. Virgin is fastest but the other two (Chiltern and London Midland) offer much cheaper fares and are capturing an increasing share of the market. This is good news for passengers, but bad news for Virgin, which is losing passengers and having to keep its fares lower. The same will happen with HS2, though of course it will not be apparent until it opens.
We estimate a reduction in revenues of at least £10 billion over the life of the project.
Philip Elliott said:You're not even remotely close. 'Supply and demand economics' is primary school stuff and only applies in certain situations (such as music concerts). Before any notion of 'supply and demand' can exist, a company must be able to cover it costs. In many niche industries, prices are high because demand is low - the very opposite of the standard supply and demand model.
The railway doesn't cover it's cost and it is government policy to reduce the subsidy therefore the TOCs are obligated to extract as much revenue as they can. Prices have risen on all routes including those cart fresh air around all the time so the notion that pricing is linked to lack of capacity. In fact, most TOCs offer cheap advance tickets owing to plenty of spare capacity and on VT, the average fare paid has gone down despite all the walk up fares going up.
Well the budget is £42.6 bn including a large contingency fund, so I'm not sure why you think it'll be at least £50 bn - some evidence would be useful.
We'll, the budget for the line is £42.5bn, and the trains somehow will cost £7.5bn (an absurd figure, how the hell is this so high???)
This equals £50bn for HS2 in most people's books.
People just assume that because of many high profile disasters (usually IT related, rather than the physical construction of something) you just can't trust a government on coming up with figures.
No, they're not serious, they're the Taxpayers Alliance....!
Taxpayers Alliance is a right wing pressure group (they don't produce enough rigorous work to be called a ThinkTank) whose default position is trenchant opposition to government spending (unless they approve of it). The notion that there is plenty of capacity where (southern WCML) and when (peaks) it counts has been repeatedly debunked by NR.
The 51m £2bn proposals aren't silly- we should do them too. But they're unlikely to be enough - which is why you build HS2.
Tobbes
I just cannot understand why anybody takes any notice of anything that the tax payers alliance says or publishes
Something I've been wondering about recently is the possibility of high speed freight.
My first thoughts about HS2 carrying freight were that it would be a very bad idea, as the slower nature of it would chew up paths and hugely reduce capacity, but perhaps there are other possibilities:
1. Is it even theoretically possible to haul a freight train at high speed? I assume not, but it's worth confirming. Relatedly, this letter from Philip Hammond suggests that there may at least be scope for "Airmail-type" packages to go via high speed lines.
2. What about the off-periods? We may want to run a passenger-intensive service during the daytime, but what about late evening, or even possibly overnight?
3. If HS2-speed freight isn't possible, is it realistic that we may be able to haul freight services at 110mph on the existing WCML? I can well see that capacity management on the existing railway would be a great deal easier if all commuter, regional and freight services could all be pathed for 110mph operation.
We'll, the budget for the line is £42.5bn, and the trains somehow will cost £7.5bn (an absurd figure, how the hell is this so high???)
This equals £50bn for HS2 in most people's books.
I'd like to see provision for one or two trains during the night, to reduce the wait from say 10 or 11pm until 5-6am. I know some routes have some trains in between, but for Intercity routes they don't.
I'd hope that the line would be set up to allow single track working for engineering work, thus allowing for freight and the odd passenger service.
While a fairly long wait might seem to counter the high-speed argument, it would be useful for people who might need to be somewhere very early in the morning (say for a flight) and can now travel in the small hours and quickly.
Even if people argue there would be little demand, surely the line needs to be available for as much as possible for freight in the years to come.
I know a lot of freight will use the classic lines when they become less congested, but surely there are plans for freight along HS2 as well?
Currently HS2 say they won't be running trains between midnight and I think five am.
That is indeed a forward-looking statement to make when the operational time for HS2 is so very many years into the future. Does this commitment not to runs night trains in the times that you state form a part of the current HS2 policy ?