As said countless times, there is opposition to just about everything. We have a company wanting to put in a solar panel 'farm' and someone is objecting. To what? It's a field that is shielded from view, so only visible from the air!!
As said countless times, there is opposition to just about everything. We have a company wanting to put in a solar panel 'farm' and someone is objecting. To what? It's a field that is shielded from view, so only visible from the air!!
There would be enough space to allow a mowing machine between each row, but the applicant said there would be “sufficient [space] to allow sheep to pass between enabling grazing between and beneath the solar panels... thus retaining agricultural use of the site and also generating additional income for the farmer”.
YouGov has asked about HS2 - a majority are against it (see http://twitpic.com/dchsot)
What if someone from an anti HS2 group posted the link to the poll, as I'm sure they did?
Personally, I'm more interested in the way they phrased the question. It's that old adage: "There's lies, damn lies, and statistics." (See also: that excellent Yes Prime Minister clip, linked above by The Ham.)
It was invitation only to YouGov members. No public link to pass around.
It was invitation only to YouGov members. No public link to pass around.
The question was phrased in exactly the way that you see it on the link. It was also out of the blue, no build up just click the next button and there was the question.
I'm aware of YouGov polls, now although they are by invite only they do tend to be funded by someone. As such it is possible for the funder to put in a fairly bland question which could make a number of people vote one way.

The question was phrased in exactly the way that you see it on the link. It was also out of the blue, no build up just click the next button and there was the question.
Look at how against the London Olympics people were a few years beforehand, when they expected it to fail.
Quite, the lack of any real noise from HS2 Ltd is probably the single most dangerous thing to HS2's future...
It is time this countries leaders grew a set and said HS2 is needed, and is going to be built on the most efficient line and level, and that the NIMBY's can get stuffed. With the money saved by avoiding wasteful legal bullS**t and tunnels to placate those who shout the loudest, being spent on fair compensation for the deserving.
The Department for Transport has yet to present a convincing strategic case for High Speed 2.
It has not yet demonstrated that this is the best way to spend £50 billion on rail investment in these constrained times, and that the improved connectivity will promote growth in the regions rather than sucking even more activity into London.
The pattern so far has been for costs to spiral - from more than £16 billion to £21 billion plus for phase one and the estimated benefits to dwindle.
The Department has been making huge spending decisions on the basis of fragile numbers, out-of-data data and assumptions which do not reflect real life, such as assuming business travellers do not work on trains using modern technology.
As usual with NAO reports, the Department had agreed the facts in the report as accurate before publication. However, as soon as the report was published, the media reported unnamed departmental sources as claiming that it contained errors and was based on out-of date analysis. These claims were quite unfounded.
The Department has ambitious and, in our view, unrealistic, plans for passing the Bill for High Speed 2. The timetable is much tighter than for either High Speed 1 or Crossrail, despite the fact High Speed 2 is a much larger programme.
In my Committees experience, not allowing enough time for preparation undermines projects from the start. A rushed approach contributed to the failure of the InterCity West Coast franchise award.
The Department has increased its High Speed rail team, but getting the right mix of skills is challenging and the Department lacks the commercial skills necessary to protect taxpayers interest on a programme of this size.
Well exactly. And while we're at it let's get rid of democracy; the cause of all this country's problems :roll:
If Patrick is right, then why is the project called "High Speed", and if it's all about capacity, why are there no intermediate stations?
PR1Berske said:Could you address the issues in this post - http://www.highspeedrailuk.blogspot....th-divide.html - that uses a HS2 document to prove that direct services to London will be reduced or even scrapped as a result of the project?
HS2 under the spotlight said:It is odd that, despite the loss of traditional intercity services being concentrated largely in the north, the Government still suggests that HS2 will help close the north-south divide!
This is precisely what I mean by people basing their opinion on negative press - if you looked into this whole issue you would quickly see that a) their 'original projections' simply uses the standard analysis that any such project does for calculating the value of saving time and b) it was never actually suggested that people don't work on trains.
The MPs' report said: "The department has yet to demonstrate that this is the best way to spend £50bn on rail investment in these constrained times."
They said out-of-date assumptions included not taking into account that people could work on trains using laptops and other mobile devices.
Committee chairwoman Margaret Hodge said: "The pattern so far has been for costs to spiral - from more than £16bn to £21bn plus for phase one - and the estimated benefits to dwindle."
It wasn't just a few years beforehand.. it was a few DAYS. In fact, probably even a few hours.
A lot of people seemed to want the Olympics to fail and the media wrote many stories that had us all thinking it would be a disaster, from the G4S fiasco to the fact that our transport network would never cope and the volunteers would be rude and useless.
If Patrick is right, then why is the project called "High Speed", and if it's all about capacity, why are there no intermediate stations?
The Department for Transport has yet to present a convincing strategic case for High Speed 2."
The pattern so far has been for costs to spiral
The Department has been making huge spending decisions on the basis of fragile numbers, out-of-data data and assumptions which do not reflect real life, such as assuming business travellers do not work on trains using modern technology.
In my Committees experience, not allowing enough time for preparation undermines projects from the start. A rushed approach contributed to the failure of the InterCity West Coast franchise award
The Olympic timescale was realistic enough for most folk to get their head round ie bid won in2005 and games seven years later ,however in these times of austerity it will be a monumental pr task of the highest order convincing the public to spent billions on projects which will not be up and running till 2026 and 2033
That's a big fat straw man and you know it! Governments make lots of decisions based on information that the general public isn't always privy to, sometimes these decisions are opposed by a majority of the public. This doesn't mean that democracy has failed.
Personally I put the blame for any cost increases on building HS2 down to the nimbies.
A good number of the people campaigning against HS2 will be dead and burried on in a care home by the time HS2 is fully up and running and we start to see the benefits. Just another case of the oldies spoiling things for the younger genertaions (Little wonder why there is resentment towards oap's etc?)