Mmm, apparently the inflated £80bn even includes the full cost of Crossrail 2 added to the HS2 tally.
:roll: Words fail me.
Mmm, apparently the inflated £80bn even includes the full cost of Crossrail 2 added to the HS2 tally.
Mmm, apparently the inflated £80bn even includes the full cost of Crossrail 2 added to the HS2 tally.
Mmm, apparently the inflated £80bn even includes the full cost of Crossrail 2 added to the HS2 tally.
Mmm, apparently the inflated £80bn even includes the full cost of Crossrail 2 added to the HS2 tally.
“HS2 Ltd is still developing transport routes for the construction of the line; accordingly it is not possible to definitively say
how the road network will be used. The information supplied to the CPRE is based on the most accurate assessment given
the progress of the line’s design at the time. The routes highlighted in the information provided to CPRE show all roads that
might be used for the construction of HS2 including those travelled by people working on the line and therefore driving by car.
HS2 Ltd is working to ensure that over 95% of excavated material is beneficially reused for the construction of the railway,
including noise and visual screening, therefore reducing the need for long distance transportation.”
“The IEA report is extremely speculative and completely lacking in concrete facts. The headline £80bn figure appears
to have been arrived at by lumping together transport schemes that are not part of HS2 and in some cases are many
miles from the line. The report claims a theoretical and unsourced cost of £30bn for these projects, although elsewhere
admits many will never be built. The IEA also fails to show how a myriad of piecemeal incremental transport schemes
would address the capacity and connectivity issues that we face or how they would even come close to providing the
opportunities that HS2 as an Engine for Growth will bring to the national economy. The fact is HS2 is absolutely vital for this country. Without it the key rail routes
connecting London, the Midlands and the North will be overwhelmed. This report does nothing to challenge these undeniable facts.”
But the way in which the £80 billion figure has been arrived at can be summarised very easily: the cost of the HS2 “Y Network” is increased to £50 billion (no citation is given), and then has, for starters, the whole cost of Crossrail 2 added to it. The only difference between the TPA and IEA is that the latter have taken the TPA number (£10 billion) and doubled it, to make it twice as scary.
That is plainly fraudulent, and twice over, but, as the man said, there’s more. A spur from HS2 to Liverpool is added in (not part of the project) because it is held that more of those vested interests will successfully lobby for it. That the city will see journey times to London cut to little over one and a half hours under the current proposals is not mentioned.
More transport schemes are added to get to the £80 billion figure: as I expected, all the cost of extending the Nottingham tram system to Toton figures, as does a tram extension west to Derby, the business case of which would stand on its own, thanks. Railway electrification in West Yorkshire – already planned – is similarly held to be part of the HS2 cost. And the benefits are talked down to a mere £30 billion.
Sadly a lot of this is too late. The release was very cleverly timed so as not to allow a near instant response - and now it's old news.
I am presuming the report wasn't issued in advance under embargo, in case it gave a chance to a detailed response to be formulated and to undermine the impact.
I've checked the BBC website and it hasn't updated its story. Have any of the papers? If not, it just shows the damage is done.
However, on the plus side, when it does go ahead then HS2 can show itself to have been built WAAAAY under the budget people have now got in their heads.
And, just like the Olympics, once it's built and open all the moaning will be forgotten about.
A few days before the one-year-on Olympic event in London, I was reading some articles posted just 24 hours before the opening ceremony at the Olympics, and besides the cost and the G4S 'scandal', one particular journalist was attacking the transport network and saying how impossible it would be to get around and the games were doomed because nobody would get to the stadium or other games locations.
Of course, within about 24-48 hours the opinions of the media did an almighty U-turn. Almost as quick as everyone in the media suddenly deciding they loved Princess Diana...
Having a discussion with a work colleague tonight about this, his first comment was simply "well why can't they just run more trains".
People genuinely don't understand the reason for building HS2, and that's why they cannot get their head round the cost - they think that the govt is spending 40 million or however much they've decided it will cost this week on cutting journey times by 20 minutes. If it was explained to people that in 10-15 years time, people could literally be turned away from boarding trains at a terminus because it's too busy, I think they'd be a lot more forgiving.
Remember a lot of the antis are convincing the public that the WCML can be upgraded to provide the same level of capacity that is required. What they aren't saying is it would cost just as much provide very little extra capacity and would cause mass disruption while it took place. But of course they wouldn't tell anyone that would they.
That would then mean enough money for HS3!
Then again why are we all surprised? The antis have already spent a hell of a lot of public council money on high court battles. Buckinghamshire council recently admitted they knew they wouldn't win but they were determined to continue with the court battles using public money.
Having a discussion with a work colleague tonight about this, his first comment was simply "well why can't they just run more trains".
People genuinely don't understand the reason for building HS2, and that's why they cannot get their head round the cost - they think that the govt is spending 40 million or however much they've decided it will cost this week on cutting journey times by 20 minutes. If it was explained to people that in 10-15 years time, people could literally be turned away from boarding trains at a terminus because it's too busy, I think they'd be a lot more forgiving.
At least in UK politics there is accountability, in so much as we can vote out a party we don't like. In the mean time, the likes of Murdoch continue to rake in the dosh year after year, practically unanswerable to anyone.
The report also lists a set of proposed additional infrastructure that will be needed to make HS2 link in better with the current system. It then presents them as if having an integrated transport system is a bad thing! The objection to this appears to be that it will cost public money to create these links. It seems that the £80 billion figure isn't actually for HS2 itself, but the perceived extra costs that will be incurred as a result of the project. All in all it's very gloom and doom, and very much a worst case scenario rather than a fair assessment.
for people living to the south of Thames who seldom travels north it's to understand how HS2 represents value for money
What, in a nutshell, would you change in the 'design' as you put it?
Leave the London terminus /OOC/ two lords route, etc issue aside please.
In all fairness Rupert Murdoch only makes money because we read his newspapers and subscribe to Sky.
He actually has control of important infrastructure and intellectual property relating to satellite broadcasting.
It is one of the reasons the BBC has to pay money to Sky over Freesat.
As I've said before on this thread, there's got to be a worry about long term infrastructure/ planning in the UK if HS2 doesn't get built - if a small committed "anti" mob can stop something getting built then we may never see another airport runway/ motorway/ nuclear facility etc built.
The point is though living in a democracy the majority vote will always prevail. You and I know that Heathrow will get a 3rd runway, Trident will be replaced, more nuclear power stations will be built and HS2 will get built!
I don't know.
The majority of people who have a view on Trident seem to be very against it.
It looks like the same is true of HS2 - since nobody is championing it in the media (other than politicians) I'd imagine that most people who have an opinion are against it.
Do we let the angry/ organised minority to rule? You could argue that in a lot of areas, we do (given how some interests are well represented in the corridors of power).
Having a discussion with a work colleague tonight about this, his first comment was simply "well why can't they just run more trains".
People genuinely don't understand the reason for building HS2, and that's why they cannot get their head round the cost - they think that the govt is spending 40 million or however much they've decided it will cost this week on cutting journey times by 20 minutes. If it was explained to people that in 10-15 years time, people could literally be turned away from boarding trains at a terminus because it's too busy, I think they'd be a lot more forgiving.
I can sort of get why people may not want the line in their back yard, especially if they don't have a station nearby.
I can also understand why some would claim to be against it (those with nice big houses and lots of land) to simply secure more compensation, as they're effectively bribed into dropping their objections.
What I can't understand is why other people are now against improving our railway network, when I am sure I remember reading articles that spoke of how pathetic our railway network is, how slow our trains are - and how we're a laughing stock compared to high speed rail networks around the world.
Anyone would think it has just become fashionable to be against it, and that the press are just going with what they believe is the popular opinion. Sadly, in many cases they're steering popular opinion.
But only because our Government sold it to him! The basic point is that without the British public buying his products he wouldn't be here!
--- old post above --- --- new post below ---
The point is though living in a democracy the majority vote will always prevail. You and I know that Heathrow will get a 3rd runway, Trident will be replaced, more nuclear power stations will be built and HS2 will get built!