If we stopped letting people have a say and do what the French do it would be built to Aberdeen by now.
Yes i exaggerated for effect....
Yes i exaggerated for effect....
I've seen nothing in the business case for hs2 that mentions the value of the capacity on the WCML that will be freed up (quite important considering it'll be full in ten years). The optimism bias on 60% is pretty hefty but we shall see. In the end the country needs hs2
It has also been commented that the Jubilee Line extension had a BCR of only 0.4 - yet Crossrail had a BCR of 2 (DfT) or 2.8 (TfL with London weighting). I find this quite surprising - sure, XR will use full sized trains, but it is a substantially wider bore at 6m diameter instead of the tube's 3.6.
Except that the anti-HS2 lot dont offer criticism. They just offer blind faith based hate with manipulative and selective information usage to put across a message theyd decided long before they looked at the economic case, which they probably havent.
As you may all be aware. Sheffield City Council broadly support HS2, but would prefer Sheffield to have a city centre connection and propose the site of the old Sheffield Victoria station. With regard to this. A 'Sheffield Loop' is proposed as an alternative. On a rail map it would appear a similar sort of feature to the Northampton Loop on the WCML. Odds of it happening don't look good owing to the high watering cost of £1 billion plus. Mainly due to much of it running through a tunnel north-east of the city centre. And, the possible demolition of the Royal Victoria Hotel will ignite Nimby-ness.
However, another story emerging in Sheffield is that Sheffield station may need an extra two platforms to cope with feeder services, should HS2 go as currently planned with a Sheffield/Rotherham terminal at Meadowhall. To do this the area of banking above platform 8, that Supertram run on top of, would be excavated to provide two platforms. With Supertram possibly being moved. Pardon me but, how much would this cost? A significant percentage of the £1 billion cost of the Sheffield Loop I suspect.
Thus, I suspect the idea of a Sheffield Loop may not be so dead in the water. Furthermore, what if that north easterly tunnel were bored with twin double track tunnels while they are doing it? This way the existing Supertram system could expand along it?
My only other guesses as to two extra platforms at Sheffield, or capacity of. Divert local stopping trains away, tram-trains. Or locate two new platforms on Sheaf Street, and divert the road onto a flyover.
That proposal will be far cheaper than 1 billion I assure you!
And it sets a very dangerous precedent, since I think with the best part of a billion pounds to work with you could come up with a city centre station for Nottingham, so why shouldn't that be funded?
Sure - now serving city centres, that's a really DANGEROUS idea!
No, just a very very very expensive idea.
Our Continental Brethren have the advantage that GC gauge will actually fit into existing stations without ridiculous amounts of work.
Try running a TGV Duplex into Nottingham station from the western approach and watch what happens.
That is an extreme example but still, many stations would need near total reconstruction to accept high speed rail trains that comply with standards.
Even a new Sheffield station will add billions to the project and deliver almost no real benefits, and will create hard to resist demands for similar loops for Derby and Nottingham and probably other places which together would push the project cost so high as to drag it under.
The options for these places is a parkway station or no station, it is as simple as that.
The real dangerous precedent we are creating is divide between those cities which are directly on it and those which are only partially on it (Nottingham, Derby, Sheffield etc), or not on it at all (Coventry, Wakefield etc)
As you may all be aware. Sheffield City Council broadly support HS2, but would prefer Sheffield to have a city centre connection and propose the site of the old Sheffield Victoria station. With regard to this. A 'Sheffield Loop' is proposed as an alternative. On a rail map it would appear a similar sort of feature to the Northampton Loop on the WCML. Odds of it happening don't look good owing to the eye watering cost of £1 billion plus. Mainly due to much of it running through a tunnel north-east of the city centre. Furtermore, the possible demolition of the Royal Victoria Hotel will ignite Nimby-ness.
However, another story emerging in Sheffield is that Sheffield station may need an extra two platforms to cope with feeder services, should HS2 go as currently planned with a Sheffield/Rotherham terminal at Meadowhall. To do this the area of banking above platform 8, that Supertram run on top of, would be excavated to provide two platforms. With Supertram possibly being moved. Pardon me but, how much would this cost? A significant percentage of the £1 billion cost of the Sheffield Loop I suspect.
Thus, I suspect the idea of a Sheffield Loop may not be so dead in the water. Furthermore, what if that north easterly tunnel were bored with twin double track tunnels while they are doing it? This way the existing Supertram system could expand along it?
My only other guesses as to two extra platforms at Sheffield, or capacity of. Divert local stopping trains away, tram-trains. Or locate two new platforms on Sheaf Street, and divert the road onto a flyover.
A billion pounds would probably buy Sheffield a significant portion of a true heavy rail metro line, underground and all.

Speaking of wcml capacity issues, have Chiltern Mainline services not taken some of the footfall away from Virgin?
I mean it is an alternative of sorts and certainly very suitable for the working traveller.
Yes, but the capacity of the Chiltern route is frankly a rounding error compared to the procession of 9 and 11 coach Pendolinos going to Birmingham.
To say nothing of the trains to Manchester and Leeds.
A 9-car Pendolino carries 439 passengers. (11-car carries 589.)What would the price of an anytime standard return to Birmingham on HS2 in todays prices. Far more I expect that most people can afford.
The London Midland trains from Euston to Birmingham are fully loaded peak time as Virgin is so expensive. After Milton Keynes the Virgin Birmingham trains I have been on are half empty.
Spend the money on the existing railways and make marginal improvements.
What would the price of an anytime standard return to Birmingham on HS2 in todays prices. Far more I expect that most people can afford.
A 9-car Pendolino carries 439 passengers. (11-car carries 589.)
A double TGV Duplex carries 1016 passengers. (That's 400m long, so possibly what HS2 captive sets will be like.)
More passengers per service should equal a lower average fare paid.
An interesting theory, however, the upgrade of the West Coast Main line increased its capacity and frequency and should then have lowered fares. The opposite has happend with train ticket inflation pushing the tickets higher and higher.
Doubt there will be any difference with HS2, the building cost alone will make sure that the peak times trains costs will be above the pricing of Virgin's now which are beyond normal peoples budgets.
An interesting theory, however, the upgrade of the West Coast Main line increased its capacity and frequency and should then have lowered fares. The opposite has happend with train ticket inflation pushing the tickets higher and higher.
Doubt there will be any difference with HS2, the building cost alone will make sure that the peak times trains costs will be above the pricing of Virgin's now which are beyond normal peoples budgets.
I can see there being cheap advance fares and high-priced turn-up-and-go first class fares just as there are now.
But if the trains have excess capacity, chances are there will be more cheap tickets at certain times than there are now for obvious reasons; empty seats aren't making money.
Only the most hardcore anti-HS2 campaigner could think that someone would just decide to charge ten times as much for a ticket and expect to make loads of profit. Businesses are there to make money, and the successful ones don't just bump up prices unless they've got a very captive market. HS2 will have to compete with other lines, albeit slower ones, so won't be able to get away with murder.