Hey everyone, it seems to the court of appeal has rejected the challenge to HS2, so one step closer to actually happening.
Source: http://www.bbc.co.uk/news/uk-23433902
So you complain that its upteen billion to save a few mins then complain that it isn't quick enough?
I wonder how many people decide not to travel between Sheffield and London by train because of the current journey time? One suspects that very few people are put off by the two hour train ride as there isn't a quicker alternative. Which makes me wonder how much extra business HS2 is likely to win between South Yorkshire and London
The difference is such that its a common thing for Sheffield - London passengers to travel via Doncaster on split tickets (hence Sheffield - London tickets being marked "route Chesterfield" to discourage this).
And note that if you had no concern for environmental impacts you could build HS2 for a rather small percentage of its current cost, as there would be no need to use a single tunnel outside of an urban area.
You could cross the Chilterns on a series of large embankments, cuttings and long cheap concrete viaducts.
Could you comment on the need to route trains via Derby, instead of taking a faster route through Toton? I get the obvious advantage of picking up more pax there, but has there ever been a plan to perhaps run the fast service this way and the slower one via Derby, or even to upgrade to 3 tph?
My other concern is that you are effectively creating two main stations, one of which is at a vast sprawling shopping mall, and the other is in the city centre.
It is better than our lot in Coventry, where they are desperately trying to call the B'ham M42 station "West Midlands Parkway", but it is still not Sheffield city centre.
I know, we'll be told the cost of a spur going right in was just too expensive, but what about a classic compatible link that at least gave some services into the centre, and perhaps the hinterland beyond?
For further helpful analysis of todays' Judicial Review descision, the Cabinet Office have published this table, showing each ground of Appeal and the individual Appellants :
http://rnn.cabinetoffice.gov.uk/imagelibrary/downloadmedia.ashx?MediaDetailsID=6742&SizeId=-1
Notwithstanding these statements, it remains an option for the objectors to launch a further Appeal against today's decision in the Supreme Court; an option which comes with considerable expense.
My complaint always has been that this line is extortionately expensive for relatively few gains, compared with European equivalents. That was largely based from reading HS2 Ltd's own reports.
So yes, the gains in journey time are relatively modest when compared with something like the AVE between BCN & MAD - and that is because the WCML is already starting from a fast baseline, if not technically "high speed", for the sake of 1mph worth of definition.
I don't think the Penzance comparison is relevant, because volumes and yields are much lower beyond Plymouth. Also, if you are trying to load in some green credentials, you need to provide an alternative to air routes, and even Newquay is barely a handful of flights each day.
So yes, HS2 - in its current form, ie the proposal that is on the table, not future potential, is not quick enough to capture the lion's share of the market to Scotland. Nor would making it a 250 or 300mph service make much difference, because the problem is that it then goes back to the classic lines to head north.
So as it stands, post 2033, you will attract leisure passengers away from flying to Scotland, but 3h40 will have little appeal to the day trip business user, and they are the ones who spend the most money.
Far from being "bowled over", I remain of the view that the case for HS2 is yet to be proven.
After all, the vast majority of CT payers live nowhere close to the line and may never even become aware of its existence.
Coventry has decided to leave the 51M group and start supporting HS2 now. Couple of other tory councils have changed their position from opposition to getting the largest compensation deal possible.
Won't Totton have a connection to the Erewash line?
Therefore couldn't Classic Compatible trains leave HS2 there, and run to Chesterfield and Sheffield proper?
Won't Totton have a connection to the Erewash line?
Won't Totton have a connection to the Erewash line?
Therefore couldn't Classic Compatible trains leave HS2 there, and run to Chesterfield and Sheffield proper?
yes, what we need it's lost more railway lines to the north as upgrading existing lines is too expensive and doesn't work. Surely one line is better than 4?
upgrading existing lines is too expensive and doesn't work.
I assume you are opposing the £5bn cost for the GWML upgrade on that basis then
Getting the sort of capacity and speed gains that would be delivered by HS2 is "too expensive and doesn't work" IMO. The aims of the GWML upgrade are not primarily about speed or capacity.
"Faster, more reliable services, more seats,
better stations and more freight trains
will not only improve the experience of
rail users but also stimulate economic
growth across the region and beyond."
"The transformational 10-year
programme that Network Rail is leading
will do more than help to meet projected
demand for increased passenger and
freight journeys; it will deliver a longterm boost to the economies of Wales
and the South West."
I can't see why they just don't look at four tracking Rugby - Birmingham as an alternative.
There's also a positive financial case for the electrification of the GWML (as well as the MML and the Newbury-Cogload Junction infill scheme once Bristol-Plymouth is wired). Reliability improvements, journey time improvements and capacity improvements are all necessary and welcome but nothing gets ministers and civil servants salivating quite like a scheme that genuinely pays for itself through reduced running costs and therefore higher franchise premiums.I think capacity and speed are both covered off in those headlines. (etc)
I can't see why they just don't look at four tracking Rugby - Birmingham as an alternative.
HS2s marketing is misleading in saying 'journey times of 45 minutes London - Bham down from current 83 minutes'. The fastest journey is 72 minutes in the morning (not stopping at Rugby/Coventry) and this could be done on a wider scale if it was required.
I assume you are opposing the £5bn cost for the GWML upgrade on that basis then
I think capacity and speed are both covered off in those headlines.
How does quad tracking the Birmingham Loop help?
That is not the capacity constrained section.
Perhaps it could be done more widely, but could it be done 3 or 4 times an hour, every hour?
Crack Express timings are worthless, the important thing is what the normal travel time is.