Thanks, I did actually manage to read the posts over this very long thread originally, and all by myself.
My observation was precisely that there is a lot of generalised enthusiasm, but not that much interest in the detailed numbers, or in how change may affect them.
That article does nothing to convince anyone that infrastructure spending whilst in debt is a solid answer - why say it does ?
It makes the specific point that it leads to unsuitable projects being given the go ahead ala Spain, without the checks and balances inherant when resources are tighter.
I think that article is dangerous as it gives the impression we just need to take one of, or several of, these magic pills and our economic problems - founded on demanding lifestyle we dont earn enough to pay for, will go away. Each option has however a high risk of a very damaging future downside, as historical and current examples of each option highlight.
As a responsible person who goes without, and built up savings in the hope of being able to buy a house for a family - it is incredibly frustrating to be labelled as the problem, and to have my hard worked for savings seen as collateral damage in solving all the problems for the worthless people who just want stuff and borrowed to much to get it yesterday. Let the housing market crash and screw the idiots who cant think for themselves is my view...
Errr, your GC option looks very much like a half hearted, but still very costly and disruptive version of HS2 Phase 1, without the travel benefits of "normal high speed" (as in the rest of Europe) and the capacity and ease of operation of an entirely seperate line. Your London end in particular looks very weak - and the only improvement would be to tunnel, at which point you are virtually at HS2 phase 1 anyway !
Given the sheer mass of the London/SE to Midlands&North transport corridor, Ox-Camb and the Peak district are less than irrelevent when considering use of resources - especially if it has in some way to pay for itself.
Let me reiterate, I think HS2 is a sensible project and the route/stations etc. are good (although personally I'd like a Chilterns interchange on EWRL !). I am concerned however about trends in what we are doing and whether the underlying numbers are good enough, and whether provding more capacity is really the right answer at all - given we have moved away from that on roads.
My observation was precisely that there is a lot of generalised enthusiasm, but not that much interest in the detailed numbers, or in how change may affect them.
That article does nothing to convince anyone that infrastructure spending whilst in debt is a solid answer - why say it does ?
It makes the specific point that it leads to unsuitable projects being given the go ahead ala Spain, without the checks and balances inherant when resources are tighter.
I think that article is dangerous as it gives the impression we just need to take one of, or several of, these magic pills and our economic problems - founded on demanding lifestyle we dont earn enough to pay for, will go away. Each option has however a high risk of a very damaging future downside, as historical and current examples of each option highlight.
As a responsible person who goes without, and built up savings in the hope of being able to buy a house for a family - it is incredibly frustrating to be labelled as the problem, and to have my hard worked for savings seen as collateral damage in solving all the problems for the worthless people who just want stuff and borrowed to much to get it yesterday. Let the housing market crash and screw the idiots who cant think for themselves is my view...
Errr, your GC option looks very much like a half hearted, but still very costly and disruptive version of HS2 Phase 1, without the travel benefits of "normal high speed" (as in the rest of Europe) and the capacity and ease of operation of an entirely seperate line. Your London end in particular looks very weak - and the only improvement would be to tunnel, at which point you are virtually at HS2 phase 1 anyway !
Given the sheer mass of the London/SE to Midlands&North transport corridor, Ox-Camb and the Peak district are less than irrelevent when considering use of resources - especially if it has in some way to pay for itself.
Let me reiterate, I think HS2 is a sensible project and the route/stations etc. are good (although personally I'd like a Chilterns interchange on EWRL !). I am concerned however about trends in what we are doing and whether the underlying numbers are good enough, and whether provding more capacity is really the right answer at all - given we have moved away from that on roads.