Nym
Established Member
Not by that much though...
Couple of things I was thinking about;
1) If theres going to be a station at Crewe, why not have a branch of HS2 from there to Liverpool?
2) Could the HS2 East Midlands station be intergrated into the current East Midlands Parkway station?
3) Does Birmingham have to be a terminus? Couldnt trains run from London through Birmingham (stopping of course) and then on to the norther branches?
4) Will better connections be provided at Sheffield for transfering between HS2 and normal rail?
1) If theres going to be a station at Crewe, why not have a branch of HS2 from there to Liverpool?
2) Could the HS2 East Midlands station be intergrated into the current East Midlands Parkway station?
3) Does Birmingham have to be a terminus? Couldnt trains run from London through Birmingham (stopping of course) and then on to the norther branches?
4) Will better connections be provided at Sheffield for transfering between HS2 and normal rail?
Couple of things I was thinking about;
1) If theres going to be a station at Crewe, why not have a branch of HS2 from there to Liverpool?
2) Could the HS2 East Midlands station be intergrated into the current East Midlands Parkway station?
3) Does Birmingham have to be a terminus? Couldnt trains run from London through Birmingham (stopping of course) and then on to the norther branches?
4) Will better connections be provided at Sheffield for transfering between HS2 and normal rail?
There's not going to be a HS2 station at Crewe, the existing station will be used for services leaving the new line which burrows underneath.
Crewe is in a bit of a special situation though, because the detailed maps/diagrams show grade separated connections both north and south of the station. So the implication is that 'classic compatible' trains will be able to run off HS2, through the station, and then back onto HS2, in both directions.
Previously, I was only really aware of the idea of the 'compatibles' leaving HS2 onto branches to non-HS destinations, ie a call at Crewe for any northbound train would mean the rest of the journey would be on the normal network - hence the earlier worry that trains would use the ECML between Crewe and Liverpool. A couple of weeks back, I think most people were expecting a branch off from the south towards Crewe only.
Hopefully all the new trackwork around Crewe will be cleared structurally for a full HS2 loading gauge to enable possible improvements to the station in future in combination with any further extensions to the line and the like.
These endless legal challenges should not be allowed to happen. I appreciate that there will be people who are against HS2 for a variety of reasons, but so far the only ones who appear to be making any real noise about it, are those who live close to the proposed route.Tomorrow's Independent reports that, in addition to the existing judicial review in the name of Buckinghamshire council, others are already being considered which may see the HS2 scheme delayed for as long as 10 further years.
Crewe is in a bit of a special situation though, because the detailed maps/diagrams show grade separated connections both north and south of the station.
I'm pretty sure there was a northern grade separated junction a couple of days ago. Have they changed a drawing?
23 theoretical paths per hour. But you can't you can't really run more than 19 paths in practice due to reliability.
That said, if I get what you are saying, that means that you might be able to get a couple of trains stop at, say, Aylesbury, provided there's a spare path to slot into at the end.
All trains will stop there at OOC. Hardly 'a little much' - with three platforms, then that's a lot of time to wait at the station before going to Euston for three platforms to be a problem - each platform gets 6tph - the trains don't need to stop more than 2 or 3 minutes at OOC, unless you need to add three minutes (as all trains are stopping, you don't) for deceleration/accleration either side there shouldn't be a problem.And remember we already have more than 18 paths unless you are planning no stops whatsoever at Old Oak Common (or every train stopping there, which is a little much for only three platforms for each direction).
All trains will stop there at OOC. Hardly 'a little much' - with three platforms, then that's a lot of time to wait at the station before going to Euston for three platforms to be a problem - each platform gets 6tph - the trains don't need to stop more than 2 or 3 minutes at OOC, unless you need to add three minutes (as all trains are stopping, you don't) for deceleration/accleration either side there shouldn't be a problem.
If you fit more seats in per metre of absolute length, then you must reduce the seat pitch, it's as simple as that... If I was to use the same seat pitch as the IEP is looking at I'd come out at a similar level of capacity. I also wouldn't need to gauge clear the entire railway all over again...
Diverting passengers through Birmingham at massive cost and probably longer journey times serves no useful purpose if they aren't joining or leaving the train, the service frequency planned will be more than sufficient. It's worth remembering that for intercity services Birmingham, like Manchester, Liverpool, Leeds and Nottingham are already operated as branches off the main through route.
I can't really argue with the cost aspect, but I find it surprising that it would make much difference to timings whether you go via BHI or the City Centre. The thing that particularly surprises me is that there seems to be little demand for Intercity journeys between non-London cities. I'm no expert, but I'd have thought that there must be a reasonable amount of demand on the Birmingham-Manchester corridor.
The cost of cleaning up the Sellafield nuclear waste site has reached £67.5bn with no sign of when the cost will stop rising, according to a report.
Though it might not make a huge difference to the west leg of HS2 (though the cumulative effect would still be felt), clearly it would add up to those heading to Leeds and Newcastle and presumably more trains would also be stopping at Birmingham, also adding to journey times.
With all the other costs and drawbacks it just doesn't make sense, lets be honest Birmingham is not losing out when it comes HS2.
Chris
There will be 4-tracks from S of Birmingham Interchange to the NE-NW split. The junctions will have access from both pairs (Birmingham Interchange and non-stop) of tracks.Alright then.... I assume this means 4 track north from Birmingham International to the junction complex?
Doing that with full grade seperation is going to be fun.....

ThanksIt's planned to run west of Culcheth, roughly following the curves of an old trackbed (sorry don't know the area and the name of the old line).
So Culcheth will be between HS2 and Chat Moss.
Oh and in reality that's not a spur, that's the main HS2, Manchester is on a spur.