That is where you are completely wrong, there is widespread opposition around the country and will be a lot more when the phase 2 alignments are announced. I would hardly call Staffordshire County council a bunch of southern nimbies...

Of the approx 55,000 responses to the HS2 consultation nearly 3/5ths came from the route and 15,000 were in the form of a chain letter from the Chilterns.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
9 Feb 2009
Messages
807
Given that the paper consultations were only handed out to people on the route and that most would consider doing it online then any 'consultation' will favour the views of the local area. It does not reflect the national view.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Given that the paper consultations were only handed out to people on the route and that most would consider doing it online then any 'consultation' will favour the views of the local area. It does not reflect the national view.

Theres a consultation response map in the document where you can see almost everywhere in the country submitted 1-100 responses (except Scotland outside the central belt and Northern Ireland not unsurprisingly) However only along the route were more than 500 responses but only in the Chilterns and around Leamington Spa did they recieve 1000-4000 submissions per square.

22,800 used the online form
12,800 used a paper based response form from a roadshow
4,200 were letters or emails
43 were detailed reports
14,910 were chain letters.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,275
Really - my information is that the cost per metre for deep core tunnelling is approx 5 fold its equivalent surface construction.

Extending tunnels ad-infinitum is not cost effective (for the taxpayer picking up the bill) and in many cases is not even feasible due to topographical and engineering constraints.

And the anti-HS2 brigade located in Burton Green & surrounding areas are suggesting a new, additional, tunnel

Well... a surprisingly small amount of the cost of HS2 is actually going on the track, the big killers are city centre stations and the like with all the enormously expensive and unpopular compulsory purchase and demolitions.

Of course if the entire route was covered you could potentially go for Platform Edge Doors and have driver less trains since it would be an entirely controlled environment....

Although the driver can't really do anything at 320kph anyway since by the tie he identifies an obstruction and activates the emergency brake in most cases its far too late to stop.
 

Padav

Member
Joined
28 Nov 2010
Messages
67
@Philip Elliott: "That is where you are completely wrong, there is widespread opposition around the country and will be a lot more when the phase 2 alignments are announced. I would hardly call Staffordshire County council a bunch of southern nimbies..."
Nice try but to put it bluntly - pull the other one!!!

The analysis of consultation responses referred to by @WatcherZero illustrates the remarkable correlation between proximity to the approved ROUTE3 pathway and HS2 opposition. You only need to take a glance at the maps on page 13 of the report (you can download it here) to grasp this reality - and before anyone claims that the report is a self-interest driven fabrication, you can view an independent peer review of the analysis here

I live in Alderley Edge - a village that will soon erupt into a predictable outbreak of panic induced, ill informed claptrap, masquerading as reasoned debate, when the phase 2 plans are announced later this year, yet right now, ignorance is bliss and not a peep is heard about the project - out of sight = out of mind.

I repeat: "The vociferous anti-HS2 lobby IS almost exclusively located in a narrow corridor directly adjacent to the approved ROUTE3 pathway"
 

Donny Dave

Established Member
Joined
9 Jul 2005
Messages
5,394
Location
Doncaster
Theres a consultation response map in the document where you can see almost everywhere in the country submitted 1-100 responses (except Scotland outside the central belt and Northern Ireland not unsurprisingly) However only along the route were more than 500 responses but only in the Chilterns and around Leamington Spa did they recieve 1000-4000 submissions per square.

22,800 used the online form
12,800 used a paper based response form from a roadshow
4,200 were letters or emails
43 were detailed reports
14,910 were chain letters.

Nice try but to put it bluntly - pull the other one!!!

The analysis of consultation responses referred to by @WatcherZero illustrates the remarkable correlation between proximity to the approved ROUTE3 pathway and HS2 opposition. You only need to take a glance at the maps on page 13 of the report (you can download it here) to grasp this reality - and before anyone claims that the report is a self-interest driven fabrication, you can view an independent peer review of the analysis here

I live in Alderley Edge - a village that will soon erupt into a predictable outbreak of panic induced, ill informed claptrap, masquerading as reasoned debate, when the phase 2 plans are announced later this year, yet right now, ignorance is bliss and not a peep is heard about the project - out of sight = out of mind.

I repeat: "The vociferous anti-HS2 lobby IS almost exclusively located in a narrow corridor directly adjacent to the approved ROUTE3 pathway"

If the DfT had actually advertised the fact there was a consulation about HS2 being done, then they will have got a lot more responses. I suspect that most of the people who responded but don't live near the chosen route are railway enthusiasts.

I suspect the DfT don't want to advertise that the very expensive WCRM was a failure, and that countless more billions need to be spent to rectify that mistake, even though it was a Labour government who wasted the money in the first place ....
 

Batman

Member
Joined
27 Jun 2011
Messages
497
Location
North Birmingham
That is where you are completely wrong, there is widespread opposition around the country and will be a lot more when the phase 2 alignments are announced. I would hardly call Staffordshire County council a bunch of southern nimbies...

Last time I checked, Staffordshire County Council were in favour of HS2, although this could change once it's formally announced that the line to the North West will run through their area, which it will.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,034
If this turns out to be true (which I have my doubts about, at least in the short term) it shows that the train operators are already looking at ways of getting extra seats on their trains:
http://www.railnews.co.uk/news/2012/07/13-union-claims-880-jobs-at.html

Anyway the point of raising it here is I would have thought that if there is plenty of capacity on the WCML then there would no need to worry about providing an extra 20 seats per train at the expense of the shop, especially given that most of the trains will be 11 coaches soon. Unless I'm missing something.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
I would imagine most of the changes the bidders have been discussing arent as drastic and are more likely minor seating alterations (increasing/decreasing first class) as well as how they would implement relivery to internal furnishings.
 

Stats

Member
Joined
27 Sep 2009
Messages
943
Last time I checked, Staffordshire County Council were in favour of HS2, although this could change once it's formally announced that the line to the North West will run through their area, which it will.
It is reported that Staffordshire CC are opposed to the rail link and are "alarmed" that there will be a junction connecting the phase 2 line to Manchester with the Phase 1 line.

http://www.expressandstar.com/news/2012/07/05/hs2-rail-junction-plans-are-attacked/

Fresh plans for a major junction of the HS2 rail line near Lichfield are revealed today, sparking criticism from Staffordshire County Council chiefs.

Proposals for a major intersection between Lichfield and Fradley have been discussed with bosses at the county council, who oppose the £32 billion link.
 

Snapper

Established Member
Joined
28 May 2006
Messages
2,460
Location
All over the place
Incidentally, if any Hs2 supporters are on Twitter and want to help counteract the misinformation spread about Hs2. Visit the hashtag #hs2
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,192
Incidentally, if any Hs2 supporters are on Twitter and want to help counteract the misinformation spread about Hs2. Visit the hashtag #hs2

And equally important to counteract pro-HS2 misinformation I hope!
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
You know those enthusiasts who've said that they are against HS2 because they are worried that it'll mean no money being spent on improving "classic" lines?

I wonder whether today's announcements will make them appreciate that HS2 is "on top of" spending on classic lines, and there seems to be a plan for infrastructure improvements regardless of HS2 (so the "HS2 is bad because it'll mean nothing will be invested on classic lines" argument seems a little weaker...).

Just a thought.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
You know those enthusiasts who've said that they are against HS2 because they are worried that it'll mean no money being spent on improving "classic" lines?

I wonder whether today's announcements will make them appreciate that HS2 is "on top of" spending on classic lines, and there seems to be a plan for infrastructure improvements regardless of HS2 (so the "HS2 is bad because it'll mean nothing will be invested on classic lines" argument seems a little weaker...).

Just a thought.

Based on their TV appearances today their message has done a 180 from 'HS2 will starve other lines of investment!' to 'now we have investment in other lines why do we need HS2? Surely this will be enough?'.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,034
Based on their TV appearances today their message has done a 180 from 'HS2 will starve other lines of investment!' to 'now we have investment in other lines why do we need HS2? Surely this will be enough?'.



The electrification of the East West rail link will actually make it a little cheaper to build HS2, as it was always planned to be used during the construction of HS2.

Also by providing a much better "classic" rail network makes it more likely that people will want to travel by train, so expect passenger growth of well above the 2% used as a basis for HS2.

This is may mean that HS2 can be delayed by a few years because of the schemes announced, but if the passenger numbers on the network are higher\earlier than the predictions used then the case for building it gets stronger not weaker.

its amusing that the anti HS2 groupings were saying that by building HS2 it would stave "classic" rail investment and that would be bad for the railways, but now the government appears to be doing both they are saying that we don't need both.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,247
The electrification of the East West rail link will actually make it a little cheaper to build HS2, as it was always planned to be used during the construction of HS2.

Also by providing a much better "classic" rail network makes it more likely that people will want to travel by train, so expect passenger growth of well above the 2% used as a basis for HS2.

This is may mean that HS2 can be delayed by a few years because of the schemes announced, but if the passenger numbers on the network are higher\earlier than the predictions used then the case for building it gets stronger not weaker.

its amusing that the anti HS2 groupings were saying that by building HS2 it would stave "classic" rail investment and that would be bad for the railways, but now the government appears to be doing both they are saying that we don't need both.

East West Rail is also giving something to the local communities in the Chilterns so that some councils/MPs have less ammunition to oppose HS2. Throw in electrifying the rest of Chiltern network and the opposition would probably go down noticeably. EWR, Oxford Nuneaton electrification and W12 works would also remove some freight traffic from the southern WCML allowing better commuter services south of MK.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
Based on their TV appearances today their message has done a 180 from 'HS2 will starve other lines of investment!' to 'now we have investment in other lines why do we need HS2? Surely this will be enough?'.

:lol:

Couldn't make it up!

East West Rail is also giving something to the local communities in the Chilterns so that some councils/MPs have less ammunition to oppose HS2. Throw in electrifying the rest of Chiltern network and the opposition would probably go down noticeably. EWR, Oxford Nuneaton electrification and W12 works would also remove some freight traffic from the southern WCML allowing better commuter services south of MK.

Good points - I hadn't thought of an electrified EWR as a "sop" to the Chiltern NIMBYs, but when you put it like that, it's a clever trick
 

brianthegiant

Member
Joined
12 May 2010
Messages
588
the Wendover antis will be too busy going to Oxford & Milton Keynes on shopping trips to notice when the HS2 construction starts :lol:
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Report in the Independent on the Mayors office work developing Crossrail 2 and trying to improve the linkage between HS1, HS2 and Crossrail 2. Again recognising that that Euston cant handle Crossrail 2 passengers most of the early design work has been thrown out, they have also ruled out a travelator between Euston and St Pancras. Their now working on the concept of Crossrail 2 sharing the HS2 corridor north of Euston and altering the height that HS2 enters Euston.
 
Last edited:

Rational Plan

Member
Joined
3 Aug 2011
Messages
235
Report in the Independent on the Mayors office work developing Crossrail 2 and trying to improve the linkage between HS1, HS2 and Crossrail 2. Again recognising that that Euston cant handle Crossrail 2 passengers most of the early design work has been thrown out, they have also ruled out a travelator between Euston and Paddington. Their now working on the concept of Crossrail 2 sharing the HS2 corridor north of Euston and altering the height that HS2 enters Euston.

I hope that was just a mis print or some engineer has wallowing in some consultancy fees.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
Sorry, what route was Crossrail 2 supposed to take?

I thought that the Euston Slows would have been folded into Crossrail 1 with some new viaducting around Old Oak Common and platforms at Willesden Junction to widen out the Old Oak Common station complex to include Willsden Junction, of course with additional mainline platforms.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
Just done some more reading, seems that the latest encarnation of Crossrail 2 is the Chelsey to Hackney line, or in it's latest TfL form, Clapham Junction with several SWT services feeding into it, out to take over services on the Lee Valley...


Wimbledon
Tooting Broadway
Clapham Junction
Chelsea
Victoria
Tottenham Court Road
Euston/St Pancras double-ended station serving both mainline stations and Euston tube station
Angel splits into two branches
Dalston Junction // *Hackney Downs / Hackney Central double-ended station
Seven Sisters // *Tottenham Hale
Wood Green // *Cheshunt
Alexandra Palace Terminates // Continuing to Hertford East (takeover or share the Great Eastern branch)
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
That makes much more sense than textual data, ta.

Wonder what the frequencies would be on these lines and if there would be any additional potential routes on the Northern end of the line...?
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,266
Location
Isle of Wight
How does it suggest she's sitting on something? Its a framework for "engineering and environmental services" which will only be finalised "once transport secretary Justine Greening published her preferred route options in the autumn", as an article in construction news put it.

Chris
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Because while they cant confirm the award until she announces it they have to be able to tell the bidders the scope of works just like they did for HS2 phase 1. You cant bid for a contract you dont know the scale and work involved in.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,160
I thought that the Euston Slows would have been folded into Crossrail 1 with some new viaducting around Old Oak Common and platforms at Willesden Junction to widen out the Old Oak Common station complex to include Willsden Junction, of course with additional mainline platforms.

Do you mean the Watford DCs? I heard that these would either revert to Bakerloo only, or be coverted to OHLE and tunnelled under Euston to who-knows-where for Crossrail 3 (possibly Waterloo).

Oh right, it's the semi-fasts to Milton Keynes. Would be a great way to soak up some of Crossrail's wasted capacity and release space for HS2. An "Oakden" interchange? Exciting!
 