Eurostars are almost certainly too slow to operate on HS2, which will be extremely heavily stressed as it is, trains need to have as uniform performance characteristics as possible.
Eurostars are almost certainly too slow to operate on HS2, which will be extremely heavily stressed as it is, trains need to have as uniform performance characteristics as possible.
Is that really necessary? I happen to believe that we can see more benefit from a mixed-traffic railway than an attempt to build an inter-urban metro. It would be a trade-off, since it would reduce total capacity, but I believe it would work better, since it would make it possible to serve more places and more people. It would also open up the possibility of a second, or even a third, north-south link in the future, serving yet more places.
I make a route via Birmingham, Nottingham/Derby and Sheffield at roughly ~310-320km.
With 320kph running over the entire length of the route beyond OOC, and 250kph to there, there should be little trouble making the 1hr20 journey time that is expected even with an intermediate stop or even two.
Its certainly far faster than the 2hr20 the ECML can manage.
It can manage faster so long as you don't stop much - there's the 0700 from Leeds, due into KGX at 0859 - though with no stops after Wakefield.
Of course we could rename the WCML as HS2 (does it ever go along the coast?) and redefine High Speed to mean 125mph![]()
Does anyone recall, back around late 90s, GNER floated the idea of P+R stations on ECML: East of Edinburgh, South of Doncaster (conjuntion of motorways) and Hadley Wood (M25) running dedicated trains, sweeping up car drivers as it were...no doubt from South yorkshire.
Stations were designed, including infrastructure and no doubt timetable slots were found.
GNER were told by, I assume, the regulator, maybe DaFT to forget all that, just run trains boys. A classic case of pathetic short-term thinking from a go-ahead outfit.
Why are such initiatives squashed, interestingly without publicity?
I don't think Birmingham needs a High Speed line to London - 1h24 is not that long in the great scheme of things and I fear that prices will be far too high for anyone not on expenses to travel by anyway. The shift from road to rail will push up prices and moreso if the political will remains that the passenger pays a greater share.
This country needs some HS rail, preferably similar to Japan or Germany but it also needs guarantees that pricing will be fair (and FWIW HS2 will pass relatively close to me)
I'm not against the UK joining the 21st century, I just think there are other railway projects that will provide better value for money in the long run. With the current plans, you will still have nearly as many trains on the Southern half of the WCML, which many people are claiming is close to capacity (granted, that is a good point), but instead they will be slower, with more station stops, so is anything being gained?
Neither are on the size of the WCML upgrade though, so neither will require months/years of replacement bus services (which upgrading the ECML as was suggested would require).
Thanks for highlighting a couple of big infrastructure projects that are taking place despite the money being found for HS2 (to dispel the myth that HS2 is stopping such investment).
The year is currently 2012, a project due to start i 2017/2018 can't have any affect on the finances now - no government department can 'bank' money - money has to come out of the annual budget and ones of the reasons for the construction period for being so long - to spread the money out to reduce the annual cost.
Once all the current projects finish around the time HS2 starts construction what other major projects are planned...? Other than a bit of electrification it is precisely zero.
When the funding arrangements for Crossrail were announced in October 2007 it was agreed that the Government, the former Mayor and London businesses would each contribute approximately one third of the expected cost
The BRS [Business Rate Supplement] will be used to finance and repay £3.5 billion debt raised to help fund Crossrail's construction. Surplus funds from the BRS, estimated to be approximately £600 million, will be used to fund Crossrail's construction directly. The debt will begin to be repaid once Crossrail is operational. See Appendix 1 for the detailed breakdown of funding sources for Crossrail
New powers given to the Mayor under the 2008 Planning Act allow him to use the planning system to raise money for infrastructure improvements needed to develop an area through the setting of a Community Infrastructure Levy. It will be collected on new developments which are approved from the Spring of 2012 aiming to raise £300 million
With the current plans, you will still have nearly as many trains on the Southern half of the WCML, which many people are claiming is close to capacity (granted, that is a good point), but instead they will be slower, with more station stops, so is anything being gained?
The DfT's contribution will be circa £5bn over 8 years or about £620-650m per annum not £2bn.
The next HLOS is actually for 2015-2019.
Manchester Airport is still paying compensation claims to houses for the second runway completed a decade ago!
Back to HS2 people are saying about it being needed because the WCML is full, what about we build more local lines and bringing under used lines in to regular use instead to keep for WCML for Intercity services?
With regard to the other point that you made, could you give some examples of where local lines would be built?
What about eventual alignments beyond Manchester? I would have thought the most sensible way to do it would be to split at Manchester Airport, carry on west past Manchester to Preston, then on to Carlisle on Glasgow. This would give easy north & southbound connections out of Manchester, and the inclusion of a triangle junction at Manchester Airport would allow northbound trains to run out of a south-facing Piccadilly station.
What about eventual alignments beyond Manchester? I would have thought the most sensible way to do it would be to split at Manchester Airport, carry on west past Manchester to Preston, then on to Carlisle on Glasgow. This would give easy north & southbound connections out of Manchester, and the inclusion of a triangle junction at Manchester Airport would allow northbound trains to run out of a south-facing Piccadilly station.