I am bemused by the lack of similar articles from other authoritative sources, which suggests that the title of this article is less definitive than it first seems.
It is true, however, that HS2 is nowhere near to being "confirmed." I for one am in two minds over the project.
On the one hand, if HS2 goes ahead, the extra capacity and slightly faster services would of course be much appreciated, although I have concerns over WCML services being slowed to a crawl and the HS2 fares being sky high.
On the other hand, I fail to be convinced by the pro-HS2 claims that the WCML south of Rugby is "full." How can a line be "full" if 5-car Voyagers and 4-car Desiros are running up and down the line, day in, day out? How can a line be "full" when a certain class of train that can run in 12-car formation is currently running in 9 and 11-car formation? And how can a line be "full" when many Off-Peak and shoulder-peak intercity services are nowhere near full capacity? If...
- All Pendolino's were lengthened to 12-car, with one First Class coach converted to Standard Class
- All Voyagers were doubled-up to create 10-car formations
- Desiros ran as a minimum of 8-car formation
- A greater emphasis was placed on Off-Peak travel
- And peak restrictions were adjusted to encourage shoulder-peak travel
...capacity would be increased dramatically, and with a much,
much lower cost than HS2.