Well HS2 runs via Sheffield then to Toton and Brum.
To me this means a lot lost out on CrossCountry journeys, because well in my case, I live in Derby.
Do I really want to goto Toton to get a CrossCountry train? No! To me, unless I am missing something, and I don't think I am... the people who mainly use the CrossCountry to/from places other than Leeds and Sheffield lose out, and badly.
Also, has anyone ever considered also some upgrades to the MML as well?
Even partial upgrades to both the ECML and the MML to me seem to provide comparable benefits to that of the HS2 spur to Leeds.
I think it would also require a lot less planning, and would not mean Euston getting overloaded as it would under current plans.
I also think a lot more is to be gained by creating a diverse range of high speed services (above 125) than routing all the very high speed traffic via HS2.
Especially as like I say, upgrades can be done incrementally, so you would start seeing the benefits of the upgrades far sooner! For example, consider putting a highspeed section of railway starting just North of the section where the ECML goes under the Lincoln line, have it go on a downwards gradient from the river then under the Lincoln line, and run the highspeed section direct to Peterborough.
By my calculations, that alone could cut about 20 minutes of the journey coming from stations north of Newark if trains ran at 250mph on this section, and benefit a far wider range of people than HS2 can, and if you did similar upgrades along the ECML, in such a fashion as to specifically targeting ECML bottlenecks first, from I can see you can end with some far shorter journey times than what is delivered by routing everything highspeed by HS2!
I think this could deliver greater benefits than HS2 to those in the Northeast, and somewhat sooner because of the lower planning needs and the incremental upgrade ability!
Also there is very specific reason why I suggest running this high speed part below the rest of the ECML, if you got a downwards gradient onto the point free high speed sections (upwards coming off), it means trains can accelerate/decelerate faster going onto the higher speed sections.
--- old post above --- --- new post below ---
Then here is another idea, once you got high speed trains running on the ECML, you can when those trains reach KGX send them onto Stratford and onto the central part of Crossrail, I can see that benefits a lot of people! Just allow some time at KGX in the timetable for people to get on/off before you goto Stratford and Crossrail.