From post #4518 to this posting (#4531) another tread has been merged in. So just read carefully to make sure that no wires are getting crossed 


I'm going to resort to big font for this:
THAT
IS
WHAT
HS2
EFFECTIVELY
IS
The WCML tends to go through towns, this means that attempting to widen it means cutting swathes through housing estates et al.
You can probably see why this is problematic.
Also working on an active railway is an order of magnitude slower and more expensive than a random strip of land.
From post #4518 to this posting (#4531) another tread has been merged in. So just read carefully to make sure that no wires are getting crossed![]()
Some new concept renders of Man Pic from MCC masterplanning doc.
Some new concept renders of Man Pic from MCC masterplanning doc.
![]()
![]()
![]()
I must admit I do love the huge shed.
I searched around for a similar thread to this and found it locked. So I'm opening a new one, discussing what can be be done with the probable £80bn for HS2. I'm not against the project, but I think that the money can be put elsewhere, such as:
- An increase on the WCML fasts from 4 to 6 tracks, with slewing for the 2 new tracks to allow higher speeds.
[*]Quadrupling and wiring of the Chiltern Main Line.
[*]An entirely electric XC network.
[*]Extra tracks at Welwyn Viaduct to uncork the bottleneck.
[*]Wiring of the entire SWT network after the Electric Spine, for compatibilty with the B'stoke-So'ton infrastructure and for Crossrail 2 compatibility.
[*]Following on from that, DC=>AC conversion of the entire Southern Region.
[*]Replacement of the Pacers!
[*]Double-tracking and wiring of the WoEML.
I searched around for a similar thread to this and found it locked. So I'm opening a new one, discussing what can be be done with the probable £80bn for HS2. I'm not against the project, but I think that the money can be put elsewhere
I am not sure there are really any major reasons to fully double track the WoEML since it is and will always be a secondary route.
It can't hope to take the primary route status away from the GWR routes to Exeter.
And for reference, I priced total electrification up at ~£20bn.
Aside from the whole "it being a diesel" thing (and therefore more expensive to run than electrics), is there anything else wrong with option 1? The service, as anyone who uses/used it regularly will tell you, works extremely well as it is.If we (foolishly) decided not to invest in HS2, the best alternative I can come up with is:
Cost-wise, it wouldn't surprise me if this came in for a significant cost of the HS2 budget.
- Electrify the Chiltern line, and probably throw down more tracks at the Marylebone end, so we can run 125mph trains between Marylebone and Birmingham (Either New Street or the Snow Hill route, or both)
- Electrify the MML, widening to four-tracks at least as far as Corby. Electrify the line between Sheffield and Stockport, extend MML services on to Manchester that way (a la Project Rio)
- Remove the WCML BHM and MAN services, use the paths for either more commuter trains, or more IC services to destinations further north.
- Increase the cost of fares on the WCML corridor to price people off the railway.
--- old post above --- --- new post below ---
The WEML is a funny one. There's clearly something wrong when we're running 10-car 158/9 formations into Waterloo in the peaks. That much capacity should surely mandate electrification, but the problem is the route west of Salisbury doesn't have the demand. It's probably not worth electrifying it without double-tracking it, but the total cost of doing so likely exceeds the benefit.
So, what do you do? I can think of four options:
Regarding #4, I wonder whether a bi-modal train design might work well here. Let's call it a "Class 244" Desiro.
- Do nothing. Keep running diesels "under the wires" (over the rail?) as necessary.
- Electrify the whole lot (at potentially great expense)
- Split the service, run DMUs from Exeter to Salisbury and EMUs from Salisbury to London. Possibly keep running some peak-time DMUs all the way
- Do something else.
Anyway, we've rather drifted off-topic. Perhaps this discussion should happen elsewhere?
Do people who support HS2 agree that the Grade II* listed Star & Garter pub in Manchester should be sacrificed for it?
Do people who support HS2 agree that the Grade II* listed Star & Garter pub in Manchester should be sacrificed for it?
http://www.manchestereveningnews.co.uk/news/greater-manchester-news/star-garter-landlord-you-can-5833098 said:The pub, now run independently of a brewery, was originally built in 1803 though is believed to have been knocked down in 1849 and rebuilt brick by brick just 100 yards away at its current location – opening in 1877
Do people who support HS2 agree that the Grade II* listed Star & Garter pub in Manchester should be sacrificed for it?
Do people who support HS2 agree that the Grade II* listed Star & Garter pub in Manchester should be sacrificed for it?
Aside from the whole "it being a diesel" thing (and therefore more expensive to run than electrics), is there anything else wrong with option 1? The service, as anyone who uses/used it regularly will tell you, works extremely well as it is.
Well, apart from the 90mph 159s tripping up the 100mph Desiros on the Fasts!
There's nothing explicitly wrong with continuing as-is, except there's obviously a keenness to avoid diesel traction wherever possible, and if we eventually do end up with wires to Salisbury, the issue will likely be raised again.
Is that all the concept renderers at this point? Hope there are more! Can you also link the site?
Do people who support HS2 agree that the Grade II* listed Star & Garter pub in Manchester should be sacrificed for it?
HS1 blends exceedingly well into the environment, as this image from the Flickr user rpmarks shows. HS2 should as well.

Joeykins, the plan for that was to reduce HS2's footprint. By keeping the line on/near the WCML, there will be less complaints about HS2's route.
That's better - I'd seen some renderings where it was just a rectangle on stilts! Were those just renderings of where the station would be without showing its style, or did they actually change it after realising it looked awful?
HS2 goes nowhere near the pub, its on the opposite side of the station.
:roll:
Ah PR1Berske is now a heritage buildings expert..
If it's really that special (eg Grade 1 listed) then cast a slab underneath and slide it aside, if it isn't that special then it's probably not worth the effort.
How many grade 2 & 2* listed pubs/bars/restaurants are there in the UK PR1Berske?
the listed building system in the UK preserves buildings for national posterity at the expense of often private owners, many of them not very well off and many not through their own choice if the building is listed during their ownership, the whole system needs a rethink.
The Manchester Evening News reports that the Grade II* listed pub is under threat from both HS2 and the new 15/16 platform proposal.
So to keep on topic, do supporters of HS2 support the demolition of a Grade II* listed building ?
It's possible to be neither for nor against HS2 you know, even as a rail enthusiast. My suspicion is based on an observation that the justification seems to have come before the design. In other words, the timings etc have had to be tweaked to give a favourable BCR, at the expense of funcionality or true commercial and social value.I actually find it incredible to see people who are 'pro rail' being against HS2.
Looks like MEN are talking out of their arse again then. Bit like PR1Berske.