Member
Phone-in now on this topic on "You and Yours", BBC R.4 at 12-05 today (Tuesday 27th Aug).
Last edited:
You see, this is not the first time that this Forum has treated dissent with such an gang-onslaught. I've said it before - if people didn't come here to express doubt or opposition, this thread would be an echo chamber. Maybe that's what you want?
Including a rather angry sounding gentleman who would rather build a giant motorway around the coast !
That would be even more of a white elephant than HS2![]()
Web conferencing has been around for years now, the internet has been widely available since the mid nineties, indeed the same period during which rail use doubled
This topic has seemingly gone round in circles for the last 20 odd pages. So I have decided it is my time to weigh into the discussion as a pro-HS2.
Why am I pro-HS2
Capacity Concerns:
Currently the WCML is operating at near capacity (and will be by the time HS2 is built according to pretty much all estimations).
In addition to this both the MML and ECML (especially the latter) are also rather congested.
Currently off peak Virgin are operating 9tph from Euston and have already suggested that they wish to run more (I believe they want 4tph to Manchester).
Apart from the frankly token call at Watford Junction no services currently stop south of Milton Keynes (where 3tph are scheduled to stop). Other than this the first calls for several services are quite far up the country at Rugby, Stafford, Stoke, Crewe and Warrington Bank Quay. These 4tph don't provide any relief for Milton Keynes or stations further south as they are primarily targeting the Birmingham, Liverpool, Manchester and Glasgow end to end market (as you would expect from an Intercity Operator).
So the question becomes what to do with this end to end demand in order to free up paths on the fast tracks on the WCML. Where you effectively have the following choices:
- Upgrade the WCML, this would be a major project that would no doubt cause huge disruption on an already busy mainline, likely causing a reverse modal shift back to car as the reliablilty of the WCML sinks futher.
- Upgrade the Chiltern Mainline, Similar to the WCML in terms of disruption but the other problem with this is simply that the Chiltern wasn't designed for fast running from Marylebone to Moor Street and I imagine platform capacity would be an issue at the former. This would also only really solve the London-Birmingham issues.
- Finally, build a brand new line lets call it HS2
This would allow all ICWC services to be slowed down, allowing more station calls at places like Milton Keynes and Watford Junction (to name but a few) increasing capacity from those stations. It would also, depending on routing be able to provide relief for the MML and ECML long distance services, as that 3 birds with one stone I hear you say!
Rolling Stock:
Who dislikes Pendolinos, small windows, cramped interior is just some comments I have read on this forum. This is primarily due to the required tilt profile within the UK loading gauge. But what is that, HS2 will be built to European Standards, allowing bigger brighter trains for HS2 only routes (though I appreciate the classic compatible stock will need to fit within the traditional gauge).
Journey Times:
Even though on the shorter trips to Birmingham gaining 30 minutes isn't massive it is when you look at the effect for Manchester, Nottingham or Leeds where significant journey time improvements are made. Yes people might not commute these distances but I for one have to make occasional business trips to the capital and the idea of shaving an hour off sound very appealing. Journey times is by no means the main reason to build HS2 despite what the politicians say (what do they know anyway!) it is mainly about capacity.
I accept that fact the HS2 isn't perfect, but no large infrastructure project has been. But HS2 is simply far too important to be canned.
Anyway those are some of my thoughts, enjoy trying to rip them to shreds.
Been entertaining though, the programme has even included a suggestion for a monorail suspended from electricity pylons !
That's even more absurd than Hyperloop![]()
I totally agree, and the pro's don't seem the have answers to some very simple questions, or actually know very much about what work that has been done on the alternatives and only have knowledge of the 51M proposal, like that 5 alternatives were considered in detail in 2010, 2 of those in addition to the 51M proposal had further work done on these in 2012.
There quiet simply are alternatives, we may not like the alternatives, they may not offer the capacity that some including many rail enthusiasts believe we need, or offer the improved journey times that some people believe are desirable. Some of the arguments for HS2 that have appeared in this thread are fanciful and uniformed at best, but so are many of the arguments against, it is only one of these two groups who is being challenged consistently which is not healthy debate.
There has to be a plan B, as HS2 can simply not have a blank cheque, there must be a point where the BCR or overall cost says "STOP". Public support is falling away falling from 42%-37% in favour in January 2012 to 34%-46% against at July 2013 (Source: YOUGOV). However on what is essentially a rail enthusiast forum, you would expect a majority in favour of such a scheme as this, and a substantial proportion of those in a "support at all costs" category, I will openly admit that in my youth I most likely would have found myself in that category.
There is no denying that HS2 will bring benefits to a substantial minority of the population, there is no denying that we have a capacity issue going forwards, and there is no denying that any amount of passenger growth forecasting is nothing short of educated guess work, with circa 70% variance between the lowest and highest growth projections.
I firmly believe what should have been a very simple; keep it green, keep the locals onside, spread the economic benefit as wide as possible, and increase capacity scheme; that I would have supported shouting from the rooftops, fails in the first 3 requirements and the blame for that falls on the shoulders of HS2 Ltd, for delivering such a shambles of a plan, which will in my opinion lead to the project being quietly shelved.
Any infrastructure plan on this scale is going to be hugely divisive by its very nature, as is UK energy strategy going forwards, or how we deal with housing shortages, and in all respects I do not believe there is a right solution, only a least worst solution, where the arguments are not black and white, but many shades of grey in between, and in which we trust our elected representatives at national level to progress the best plans, and our local representatives to represent and campaign on local elements of the these.
What we must do is step back, have a national transport strategy in England, like in Wales and Scotland, which has been delayed from September 2012, and establish what the best ways forwards is for railways and railway capacity are in the wider scheme of UK transport demand and future trends. If that considers HS2 in its current guise to be the way forwards in the overall strategy so be it.
Thanks, I also didn't even mention the (two I think) fast London Midland paths. It wouldn't surprise me if London Midland want to double their service provision on the Trent Valley especially, but personally I would like to see more Fast Virgin Services calling their. Imagine the following post HS2 Virgin Timetable assuming the 11 fast paths (including London Midland's) are kept and no service extensions (to Blackpool, Shrewsbury etc).Very sensible points - the space that those nine fast Euston services take up each hour (with only a handful of stops at MK) could be given to local services that would provide Hertfordshire/ Buckinghamshire/ Northamptonshire etc with a much better service.
Without saying as much, the author implies that speed is the focus. In any case, a shorter journey will make many more journeys feasible between north and south.The fact is, it's already quick enough for Londoners to get to Manchester, Liverpool or Leeds, or vice versa
Yes, you have inadequate rolling stock (not as old as a lot of intercity stock mind). In the foreseeable future this will be replaced. Millions are being spent on electrification and improvements already - there's no reason these won't continue if HS2 goes ahead.I've lived in the north-west on and off for several years, eventually settling in Liverpool last year. The daily experience of getting into the city, or of getting from one northern town to another, is to be reminded of how much better, and how much more urgently, that £42bn or £50bn or £80bn cost of HS2 can be spent. We have ancient, mucky trains; frequent breakdowns; no possibility of a direct train to Glasgow or Bristol.
Whilst I agree that the Government does focus economic development on London, could this be because London is in fact the main economic driver and it's seen as safer to promote this than dabble with other regions?The difference in quality between existing intercity travel from south to north, and the vital daily branch-line travel between northern towns and cities, is a reflection of central government's priorities. It sees growth as an exclusively south-eastern engine which, in its great munificence, powers the rest of the country which must make do with a sliver of London's transport spending and find ways to milk the capital rather than build itself up.
The costings for HS2 are much more realistic than those for the Chunnel, which was forced to make overoptimistic predictions in order to justify overspend IIRC.The Channel tunnel link, which he cites as an example of infrastructural investment that was put off for too long, still carries far fewer passengers than were predicted upon its opening in 1994. By the same token, HS2 trains may end up carting hordes of bumless seats from London to Manchester in double-quick time.
It's not just about speed. In any case, Paris-Lyon, the first LGV, was hugely successful. The distance is only slightly more than London-Leeds. Paris-Lille and Paris-Brussels are important TGV routes and equivalent to Leeds-Birmingham and London-Manchester.Comparisons with Europe are flawed. France and Spain need high-speed rail because they are enormous countries: the only really beneficial British equivalent would be from, say, London to Glasgow or Penzance without stopping. Our country is small enough to cross in a day without any particular need for greater speed.
Erm...The densely populated urban corridor lying between Liverpool and Hull has the potential to make London, or at least its self-aggrandising role as national benefactor, seem irrelevant.
Here it is again - £50bn is loads of money, so anything else I can think up must cost "a fraction" of that. As someone else pointed out, the Reading area redevelopment is a good example: in order to increase capacity at one, admittedly large, station, and to allow an improved frequency/reliability at one major junction, is costing nearly £1bn. And that's with out any land-grab. A handful of similar projects across the north and replacing all of Northern's clapped out fleet and you're not going to be costing "a fraction" of HS2.A fraction of the investment proposed for HS2 would transform connections between towns and cities that have effectively been written off as producers of their own jobs and wealth.
...Which is why the route is going to be electrified and benefit from longer, more frequent trains, no? If similar studies can show direct economic advantages on other routes, then these may be upgraded too.Research by the Centre for Cities showed that upgrading the line between Bradford and Manchester and improving the trans-Pennine rail route would, among other transport improvements, produce economic benefits to the Leeds region in the hundreds of millions.
Bingo! It's a strange point to (nearly) end the article on - this is exactly the reason why we need HS2. Is the point that the Government should stop trying to promote HS2 on the basis of benefits to the North, when other investments would be better for this?If Britain does need a high-speed route from north to south, it's so we can make space on the existing mainlines for stopping trains and freight.
Nice words. Lets be practical. What is your plan to increase capacity to the level required?
How do you propse to force even more trains onto the already full, almost to bursting point, southern WCML?
Thanks, I also didn't even mention the (two I think) fast London Midland paths. It wouldn't surprise me if London Midland want to double their service provision on the Trent Valley especially, but personally I would like to see more Fast Virgin Services calling their. Imagine the following post HS2 Virgin Timetable assuming the 11 fast paths (including London Midland's) are kept and no service extensions (to Blackpool, Shrewsbury etc)
Thanks, I also didn't even mention the (two I think) fast London Midland paths. It wouldn't surprise me if London Midland want to double their service provision on the Trent Valley especially, but personally I would like to see more Fast Virgin Services calling their. Imagine the following post HS2 Virgin Timetable assuming the 11 fast paths (including London Midland's) are kept and no service extensions (to Blackpool, Shrewsbury etc).
3x Birmingham (and Wolverhampton) Services as is, maybe with more Wolverhampton extensions depending on stock/paths.
4x Manchester Services with the following calling patterns
- Milton Keynes, Rugby, Lichfield TV, Stoke, Macclesfield, Stockport and Manchester Picc
- Milton Keynes, Nuneaton, Stoke, Macclesfield, Stockport and Manchester Picc
- Milton Keynes, Nuneaton, Stafford, Crewe, Wilmslow, Stockport and Manchester Picc
- Watford Junction (Pick up/Set Down), Tamworth, Crewe, Wilmslow, Stockport and Manchester Picc
1x Chester (with some continuing to Holyhead)
- Milton Keynes, Nuneaton, Crewe and Chester
1x Liverpool
- Milton Keynes, Stafford, Crewe, Hartford, Runcorn and Liverpool LS
1x Preston (Former Glasgow)
- Milton Keynes, Tamworth, Crewe and Chester
So I have used 10 theoretical paths in total, from the current 11. (One of the paths taken from fast LM Euston-Crewe that I would run as a stopper Northampton-Crewe and use the spare units on the slow services south of Northampton).
Now lets look at this as a service increase from intermediate stations.
Milton Keynes:
Current Fast London Services: 4 (Including LM)
Theoretical Fast Services Post HS2 using my timetable: 7
Percentage Increase in Service Levels: 75%
Rugby
Current Fast London Services: 2
Theoretical Fast Service Post HS2 using my timetable: 2
No change in service level but more seats as 390 is longer than 350.
Nuneaton
Current Fast London Services: 1
Theoretical Fast Service Post HS2 using my timetable: 3
Percentage Increase in Service Levels: 300%
Tamworth
Current Fast London Services: 1
Theoretical Fast Service Post HS2 using my timetable: 2
Percentage Increase in Service Levels: 200%
Lichfield TV
Current Fast London Services: 1
Theoretical Fast Service Post HS2 using my timetable: 1
No change in service level but more seats as 390 is longer than 350, and service is also faster for omitting Rugby, Nuneaton and Tamworth.
Stafford
Current Fast London Services: 1
Theoretical Fast Service Post HS2 using my timetable: 2
Percentage Increase in Service Levels: 200%
Other interesting things of note are that places like Tamworth and Lichfield all of a sudden gain faster connections to places like Manchester (where at the moment it would involve a change at Stafford or Stoke).
This timetable also doesn't include any NEW HS2 services to those destinations, so imagine the possibilities!
So I guess what I am trying to point out is that HS2 could have benefits for the stations other than it's destinations. No doubt I could carry out a similar exercise for the MML and ECML with the Nottingham, Sheffield, Leeds and services north of York.
Now lets look at this as a service increase from intermediate stations.
Milton Keynes:
Current Fast London Services: 4 (Including LM)
Theoretical Fast Services Post HS2 using my timetable: 7
Percentage Increase in Service Levels: 75%
Rugby
Current Fast London Services: 2
Theoretical Fast Service Post HS2 using my timetable: 2
No change in service level but more seats as 390 is longer than 350.
Nuneaton
Current Fast London Services: 1
Theoretical Fast Service Post HS2 using my timetable: 3
Percentage Increase in Service Levels: 300%
Tamworth
Current Fast London Services: 1
Theoretical Fast Service Post HS2 using my timetable: 2
Percentage Increase in Service Levels: 200%
Lichfield TV
Current Fast London Services: 1
Theoretical Fast Service Post HS2 using my timetable: 1
No change in service level but more seats as 390 is longer than 350, and service is also faster for omitting Rugby, Nuneaton and Tamworth.
Stafford
Current Fast London Services: 1
Theoretical Fast Service Post HS2 using my timetable: 2
Percentage Increase in Service Levels: 200%
This is what Network Rail have proposed as 'RP2', after having analysed the plans devised by 51m. Note that by the time any upgrades are in place, services will be at capacity again, notwithstanding the disruption that will ensue, again.
Now, if we all read this report, the anti-HS2 can't complain that those 'for' HS2 don't know of the alternatives - and how insufficient these are!
I'm broadly in agreement with what you're saying - but all your percentage increases (apart form the 75% one) are 100% too high - 1 to 3 trains is an increase of 200% to give 300% of the current service level.
If what you mean is "Service level compared to now" you need to increase the first to 175% and reword.

How do you propse to force even more trains onto the already full, almost to bursting point, southern WCML?
No that is not a Network Rail proposal at all, that is the response to this https://www.gov.uk/government/uploa...4/hs2-strategic-alternatives-study-update.pdf proposal which is an update from this one http://webarchive.nationalarchives....ail/alternativestudy/pdf/railintervention.pdf
No that is not a Network Rail proposal at all, that is the response to this https://www.gov.uk/government/uploa...4/hs2-strategic-alternatives-study-update.pdf proposal which is an update from this one http://webarchive.nationalarchives....ail/alternativestudy/pdf/railintervention.pdf
My preferred solution has never changed from my original stance and my response to the consultation. HS2 is too fast, 140-150 mph would be more than sufficient and greener and £4bn cheaper, somewhere in the region of an additional 5-6 stations, over the 2 phases. Slowing the railway down would give more routing flexibility to avoid contentious sites, adding in stations brings benefits to more regions impacted by its construction. Unfortunately the debate has gone down to do you support or oppose HS2, and I believe those alternatives that have been examined for all the flaws are less worse than HS2 as it stands.
And a very interesting read it is too. While the proposal and answer contains some good food for thought, they should be considered alongside HS2 not instead of HS2
My preferred solution has never changed from my original stance and my response to the consultation. HS2 is too fast, 140-150 mph would be more than sufficient and greener and £4bn cheaper, somewhere in the region of an additional 5-6 stations, over the 2 phases. Slowing the railway down would give more routing flexibility to avoid contentious sites, adding in stations brings benefits to more regions impacted by its construction. Unfortunately the debate has gone down to do you support or oppose HS2, and I believe those alternatives that have been examined for all the flaws are less worse than HS2 as it stands.
OK, 'RP2' was set out and evaluated by Network Rail in response to these linked proposals, or so you say. Happy?
More regions are going to be impacted by HS2 than is obvious, even if indirect, because the capacity freed up by running express services on a different line will go towards serving those conurbations in between... As many have explained before. If you go down the new-build LDHS route, go down the >155mph route to get the most out of it and not just build another WCML that merely duplicates the function. HS2 will serve an overlapping but ultimately 'higher' market.
Alternatively the government could stop pandering to all the antis and force the line through on the route they chose, cutting down on the number of tunnels, diversions etc to ensure the most direct route is taken. They would do that if it was in the north of England, strange how they wont in leafy Buckinghamshire.
I'm happy its factual
I disagree to an extent, I could live with 155mph it would still present time savings, but at a lower cost to the design speed, and with a negative carbon position. Better integration of HS2 into the current rail network would bring about even further capacity release from classic lines and additional stations, in strategic locations could attract this overlapping market, and use the fact that HS2 does not with the exception of Birmingham (which I still maintain is a horrific locational decision), Leeds and Manchester serve city centres, to attract people who are put off travelling by rail because of the city centre location of local stations, in addition to spreading the economic benefits more widely.
In all fairness HS2 isn't built through the Peak District or the Yorkshire Dales, in which case there would have been lots of tunnels. The fact that the lovely Chilterns are in Bucks has nothing to do with it.
...Better integration of HS2 into the current rail network would bring about even further capacity release from classic lines and additional stations, in strategic locations could attract this overlapping market...
So your main opposition is the speed of the line not actual line itself?
I have four principle objections and two large concerns, if you was to ask which of them was the largest I would say the first one, however the speed is a principle driver in its own right for the main objections. The last one is a side issue, and if the project principles are correct and the economics stack up, I accept that some things have to give.
Objections
Too few stations served and failing to spread economic benefits
Speed of the line, raising costs and lowering green credentials
Lack of joined up thinking in transport strategy (How does HS2 fit into the big picture)
Specific routing objections in the Warwickshire area, some are due to the speed of the line necessitating the routing.
Major Concerns
Cost of the project
Location of Birmingham Central Station
Will average people be priced off HS2
I have four principle objections and two large concerns, if you was to ask which of them was the largest I would say the first one, however the speed is a principle driver in its own right for the main objections. The last one is a side issue, and if the project principles are correct and the economics stack up, I accept that some things have to give.
Objections
Too few stations served and failing to spread economic benefits
Speed of the line, raising costs and lowering green credentials
Lack of joined up thinking in transport strategy (How does HS2 fit into the big picture)
Specific routing objections in the Warwickshire area, some are due to the speed of the line necessitating the routing.
Major Concerns
Cost of the project
Location of Birmingham Central Station
Will average people be priced off HS2
You can free up paths by focusing resources at the worst places on the WCML, rather than building an entirely new London-centric network. For less money. And with results in a handful of years rather than 20/30+.