edwin_m
Veteran Member
Well, with respect, in your last summarising paragraph you agree with me that these data are required before anyone tries to say that the location of Toton is faulty or otherwise. That was my point.
The data and the business case process exists to test options, not to generate them. Any study worth its salt begins with some consultation and deep thinking about what options might be worth looking at. Ususally the preliminary sift of options is done qualitatively and only the front runners undergo the complex and expensive process of testing against demand models. So it is not sensible to say that only people with access to the data can participate in the discussion.
For Toton the process is documented quite well on the HS2/DfT websites, but unfortunately this information is quite hard to find (and has probably moved since I studied it back in January so even if I had a link it would be of little use).
I should say here for the record I have been very careful not to say that Toton is the wrong place for an East Midlands HS2 station. What I actually believe is that it is probably the best option compatible with the constraints of local geography and the design parameters for high speed infrastructure. However I have my doubts about whether it will be as beneficial for the region as some people seem to think. These are of course only my opinions, based on 20 years experience of railway consultancy and 25 years living in Nottingham, which you are entirely free to criticise constructively.
Last edited: