Hello Everyone,
I have a quick question regarding the hidden report and rules regarding the 12 maximum working time for non-safety critical FGW staff.
If for example someone was to work a 0600-1000 shift in the morning, would they they be able to work a 1300-1700 shift in the afternoon, also possibly repeat the next day?
The reason that I ask is that I have received differing answers when I have previously asked - varying reasons have been:
Which is right or wrong - if any?
Many thanks
I have a quick question regarding the hidden report and rules regarding the 12 maximum working time for non-safety critical FGW staff.
If for example someone was to work a 0600-1000 shift in the morning, would they they be able to work a 1300-1700 shift in the afternoon, also possibly repeat the next day?
The reason that I ask is that I have received differing answers when I have previously asked - varying reasons have been:
- That a shift is defined as one continual working block and the above would be considered a breach as there is no 12 break between the two above shifts, being as they are separate ones.
- The above is fine, as both shifts in their entirety do not overlap 12 hours and thus the same pattern could also be repeated the next day as it would allow for a 12 hour break between.
Which is right or wrong - if any?
Many thanks