• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Here's a long one.....

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

SprinterMan

Established Member
Joined
20 Sep 2010
Messages
2,341
Location
Hertford

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,762
I suspect it is either an ultrasonic test train or a plain line pattern recognition train, even so, it is a long schedule. It must have crew changes as normally you require 2 x 30 min PNB or 1 x 45 min on a circuit that is half that length.
 

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,534
Damn, that's long. Any idea what it is?
It's the Bristol-based 'water cannon' RHTT (RailHead Treatment Train),
one of 20 loco-hauled RHTTs which operate each November and December.

(the paths are kept 'in the system' year round to ensure they are
not used for something else in the other ten months!)


MARK
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,762
Are NR masking class 3 schedules aswell then ? (should have guessed RHTT if I had bothered to look at the date.....)
--- old post above --- --- new post below ---
(the paths are kept 'in the system' year round to ensure they are
not used for something else in the other ten months!)


MARK

Which annoys the freight bods intensely as they see them as valid white space outside leaf fall.
 
Last edited:
Status
Not open for further replies.

Top