• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Henley Branch Line

Status
Not open for further replies.

autotank

Member
Joined
6 May 2010
Messages
116
Location
Oxfordshire
On the front page of The Henley Standard a few weeks ago there was an article proposing the shortening of the Henley branch by quarter of a mile to improve access to the River and Rowing Museum and Mill Meadows http://www.henleystandard.co.uk/news/news.php?tabp=y&id=869311

When this was last proposed 10 years ago the residents of Henley vehemently opposed this - I hope they will again (there have already been some pretty fierce letters opposing the plan in the paper). The station is far enough away from the town center already - moving it further would be a retrograde step. Whilst the station car park is under utilized at the moment, this could be improved by a better walking route to the RRM or even a footbridge, which has previously been suggested.

Talking more broadly, does anyone know how the branch service fits in with Crossrail and the electrification of the GWML to Oxford and Newbury? I've heard the line won't get wired, which would be a shame and I assume mean the end of through services to London in the morning/evening peaks? Once Crossrail starts up though presumably there will be a good argument for speeding up the Twyford services by missing out most of the stations between Maidenhead and London?

My pie in the sky infrastructure project would be to install a loop between Twyford and Wargrave so you could run half hourly with one train an hour extended to London calling at Maidenhead. This would provide extra capacity for Maidenhead passengers who don't want to sit for ages on a stopper and reduce the number of HST/IEP that call there in the peaks. The London trains could run as 6 car services as they wouldn't need to use the bay at Twyford. There would still be a 2 car branch shuttle running hourly. At the moment the 0744 Henley-Padd makes it in 45 mins and the 1906 from Padd does the journey to Henley in 46 mins, so you'd only need two sets to run the London service hourly.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
Looking at the proposed Crossrail plans, Twyford will get a 2 tph shuttle service from Reading to Slough on the relief lines.
 
Last edited:

autotank

Member
Joined
6 May 2010
Messages
116
Location
Oxfordshire
So the Twyford service gets cut in half and to get from Henley - London you'll have to change twice?!? Seems madness to me, but from what I have read it seems common sense will prevail and Crossrail will extend to Reading. Fingers crossed!
 

tripleseis

Member
Joined
7 Sep 2008
Messages
207
Surely electrification of the Marlow and Henley branches wouldn't be too much extra. Those branches aren't particularly long and you eliminate the diesel under wires scenario.
 
Status
Not open for further replies.

Top