• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Hemel Hempstead

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

John Webb

Established Member
Joined
5 Jun 2010
Messages
3,764
Location
St Albans
Watford Junction will be undergoing major works shortly - could be that infrastructure trains will be held at Hemel between work sessions at Watford? (Bearing in mind Watford doesn't have much in the way of sidings these days!)
 

MK Tom

Established Member
Joined
31 Aug 2011
Messages
2,458
Location
Milton Keynes
Cheddington is also getting lifts, or there's certainly something being done to the footbridge there.

That cattle dock at Hemel has always struck me as a sensible place for a south-facing bay platform for terminating London services.
 

Urban Gateline

Established Member
Joined
8 Mar 2011
Messages
1,667
Cheddington is also getting lifts, or there's certainly something being done to the footbridge there.

That cattle dock at Hemel has always struck me as a sensible place for a south-facing bay platform for terminating London services.

Do you have any source for Cheddington getting lifts? It's the first I've heard of it and I can't find anything to back it up!
 

plastictaffy

Member
Joined
18 Nov 2012
Messages
1,104
Location
Unfortunately, Maps has stopped.
Hemel is used as a termination point at times of disruption. The down slow platform is actually bi-directional, to allow access to the crossover and bay platform there. AFAIK, Cheddington is just being updated, including a new footbridge. The platforms are being looked at as well, the up slow is looking decidedly dodgy in places.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,675
Could well just be a renewal job on the point work that has been sat in the workbank for ages and is now getting done.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,633
Cheddington is also getting lifts, or there's certainly something being done to the footbridge there.

That cattle dock at Hemel has always struck me as a sensible place for a south-facing bay platform for terminating London services.

I've often thought that - it could either be used for slower, shorter shuttles which leave 1 min after a faster train (providing Apsley, KL and Bushey stops which could be removed from Tring/MK trains), or possibly for WLL trains too.

Skip stopping is probably best though, as used in the peaks.

And one day, it could even host Crossrail terminators - if stock constraints and lack of demand mean that sending 8tph to Tring is complete overkill.
 

plastictaffy

Member
Joined
18 Nov 2012
Messages
1,104
Location
Unfortunately, Maps has stopped.
Skip stopping is a pain in the arse. There's an early morning Tring service that leaves there and does first stop Apsley. Twice I've worked the job, twice the driver has stopped at Berkhamsted. Not cool, especially when there's a platform full of punters.
 
Status
Not open for further replies.

Top