Heald Green station is currently having its ticket office refurbished until the end of this month.

Does anyone have any news concerning the condition of the scaffolding supported ramped access to the airport line platform 1....or the final decision concerning the concrete footbridge that was demolished some time ago.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Andrew Nelson

Member
Joined
28 Jun 2010
Messages
702
Heald Green station is currently having its ticket office refurbished until early June. Does anyone have any news concerning the condition of the scaffolding supported ramped access to the airport line platform 1....or the final decision concerning the concrete footbridge that was demolished some time ago.

Was there Yesterday evening, though on other platform (after walking from Styal). Didn't notice much, other than the Departure boards kept re-booting.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,406
Location
A typical commuter-belt part of north-west England
Was there Yesterday evening, though on other platform (after walking from Styal). Didn't notice much, other than the Departure boards kept re-booting.

The problem with the Departure Boards is said to be something connected with the electrical works inside, whilst the remedial works are being carried out.....or so a collegue of mine was informed by "someone in authority wearing a suit and a hi-vis vest".
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,406
Location
A typical commuter-belt part of north-west England
Well, it is now 26th May 2011 and my wife , yesterday, was at Heald Green station to collect two elderly ladies returning home from Windermere and she was told that the refurbishments are taking much longer than expected.

A staff member said to her that the contractors working in the Booking Office had built a new wall, painted it....then demolished it a few days later, as the wall had been built in the wrong place. :roll:
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,406
Location
A typical commuter-belt part of north-west England
It is now 28th June 2011 and passengers are still not allowed into the station waiting room. My friend who used this station yesterday, manned by two exterrnal male ticket issueing officers, was told by one of these that the project was very late and that the contractor concerned had been summoned to a site meeting later this week.

External painting to the seating units had been completed.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,406
Location
A typical commuter-belt part of north-west England
It is now 13th August and the never-ending saga still continues.

This week, my wife drove a neighbour in our village to Heald Green station, as her nephew was coming to Heald Green by train from Holmes Chapel. Our neighbour gave my wife a copy of a letter from Northern Rail at Leeds she had received in response to her letter which said:-

Unfortunately, we have an issue with the newly fitted counter top. The site managers and contractors are addressing the issue and I would apologise for any inonvenience to our regular customers. We will be opening the station office as soon as possible.

Since the ticket office was closed on 11th April, more than four months have now elapsed since the commencement of the refurbishment works, which were supposed to have been completed by mid-June.
 

ANorthernGuard

Established Member
Joined
8 Oct 2010
Messages
2,662
from what I have been told, Northern are refusing to pay for some of the work as they are considering sub-standard (these are rumours and I have no proof) however it would explain alot of the delays.
 

Poss Planner

Member
Joined
25 Aug 2011
Messages
19
The ramp to the Airport Bound Platform is to be rebuilt/extended. Work is likely to start around March 2012
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,406
Location
A typical commuter-belt part of north-west England
My friend from Cheadle Hulme and I attended a meeting in Heald Green last Thursday where a spokesman from National Rail and Mark Hunter, the local MP, gave details on future infrastructure developments at this station. The shelter from the former Oldham Loop line has been recoated and has just been erected on the airport bound platform.

The new ramped entrance to the airport bound platform referred to by Poss Planner was discussed in some depth. A completely new structure will be built, which will give a ramp commeasurate with current disability regulations, commencing in December 2011 and due for completion in April 2012. A temporary access structure will be provided during these construction works.
 

hmott9000

New Member
Joined
19 Jun 2011
Messages
3
Hi Paul,

I have just moved to Heald Green and interested in the station.

Do you know if there are any further plans for the station? they seem to have cleared some of the bank on the station approach side. will they re-ensate the foot bridge?

plus will we be getting any more trans pennie services, other than the blackpool train?
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
I dowbt you'll get any TPE services over the BPN service, that is more a legacy left over from the days before the south facing junction for the airport was in place, and when FNW ran the Airport - Blackpool as a local service rather than an 'express'

Don't think Heald Green is delt a perticularly bad hand when it comes to services anyway, 3tph to Manchester, 3tph to Airport isn't that bad...
 

hmott9000

New Member
Joined
19 Jun 2011
Messages
3
very interesting! don't you think there are too many express trains to the airport?
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
No, if these where only express to Piccadilly then it would be excsessive (opening a can of worms here) but these services go for an hourly pattern to a lot of places around the north.
(Newcastle, Middlesbrough, Barrow / Scotland, Liverpool, Blackpool, Southport, Cleethorpes) Not to mention places served on route... (Leeds, York, Sheffeild, Doncaster, Bolton, Preston, Wigan, Lancaster, Carlisle, Northallerton, Darlington, Durham, Scunthorpe etc.)
 

hmott9000

New Member
Joined
19 Jun 2011
Messages
3
Yea i think that maybe these long distance trains are ok as express but i think that northern run some sprinters and pacers which are always empty, cant these stop at some stations on the styal line? what do people think?
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,406
Location
A typical commuter-belt part of north-west England
Hi Paul,

I have just moved to Heald Green and interested in the station. ....Do you know if there are any further plans for the station? They seem to have cleared some of the bank on the station approach side. Will they re-ensate the foot bridge?

Unfortunately, the footbridge will not be re-instated and I was at a meeting with National Rail when this point was raised. Passengers purchasing a ticket from the booking office for destinations to Manchester Airport, Wilmslow, etc, will still have to walk out of the booking office, up the approach road to Finney Lane, cross the railway on the road bridge then take the route from there downwards to the Airport bound platform.

The works that you see in progress are for the installation of the new ramped access to the airport-bound platform (which are commensurate with the current Disability Regulations) from Finney Lane which are scheduled for completion in April 2012.

I think that Nym has answered your questions with regard to operational matters. It is not just the Blackpool TPE services that stop there, but certain TPE services to Windermere, Glasgow and Edinburgh also stop there. Heald Green is quite a well-patronised railway station.

Northern Rail "hourly" services from both Crewe to Manchester Piccadilly (Styal Line) and the shuttle service from Manchester Airport to Manchester Piccadilly both make stops at Heald Green, in addition to any TPE services.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
And to be honest, it's a similar layout at Lostock Parkway, and they seem to have similar passenger numbers...

Well, 380,000 for Heald Gn and 209,000 for Lostock, but Lostock continues to grow, and has less services...
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,406
Location
A typical commuter-belt part of north-west England
And to be honest, it's a similar layout at Lostock Parkway, and they seem to have similar passenger numbers...

Well, 380,000 for Heald Gn and 209,000 for Lostock, but Lostock continues to grow, and has less services...

There is a very noticeable difference in one certain facility between these two stations. Lostock Parkway has a very large number of car parking spaces for intending rail passengers...Heald Green has barely 10 such spaces outside the booking office. The large car park at the Heald Green Hotel is now a £5 daily charge, redeemable against a meal, etc, and the numbered car park spaces that are nearest to the road and the property of Stockport Council can only be used for no charge within the published time limits as displayed on the signs. These spaces are normally taken by people without car parking spaces at Greencourts Business Park very early each morning.
 

VTPreston_Tez

Member
Joined
26 Jan 2012
Messages
1,159
Location
Preston
so basically, Heald Green only serves services stopping at Preston northbound? That's what I've gathered, and I've considered HG to be a Manchester terminal minus the terminus bit, along with Wilmslow, Stockport, Vicky, Picky, Oxford Road, Salford Crescent, Stalybridge, and the Airport. Meh..
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
so basically, Heald Green only serves services stopping at Preston northbound? That's what I've gathered, and I've considered HG to be a Manchester terminal minus the terminus bit, along with Wilmslow, Stockport, Vicky, Picky, Oxford Road, Salford Crescent, Stalybridge, and the Airport. Meh..

Well, bearing mind five of those aren't even in Manchester (city I should add, I'm not getting into Greater Manchester terms, otherwise Wigan could be too!).

I have absolutely no idea what you mean in the first sentence - northbound M-F off-peak it has 2tph stopper to Piccadilly and 1tph to Blackpool North via Chorley. Southbound there are 2tph to Airport only, and 1tph to Crewe via Airport.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,406
Location
A typical commuter-belt part of north-west England
so basically, Heald Green only serves services stopping at Preston northbound?

I think that the best thing for you to obtain is the Northern Rail timetable 21 that details the services not just of Northern Rail, but also of First TPE, that stop at the stations at Heald Green, Gatley, East Didsbury, Burnage and Mauldeth Road. The footnotes gives all the required service information in a basic form. This should be there at the booking office of Heald Green railway station.
 