This is an infrastructure thread to discuss Headbolt Lane work.

To discuss any other topic, please use/create a separate thread.

Actual timetabling changes belong in the timetabling section, while any posts of a speculative nature belong in Speculative Discussion please.

Many thanks.
 

Skie

Established Member
Joined
22 Dec 2008
Messages
1,238
Back to updates. Rail Focus have (has?) posted a video on youtube showing the present state of Kirkby station and Headbolt Lane.
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,616
Location
Rochdale
When I have covered stations on the Manchester side a lot passengers were going to the hospital at Fazakerley or stations north of Liverpool to avoid having to go into Manchester and then swapping at Lime St.

They look to be building a big old carpark at Headbolt lane so presumably any passengers for the Manchester side would just drive there.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
When I have covered stations on the Manchester side a lot passengers were going to the hospital at Fazakerley or stations north of Liverpool to avoid having to go into Manchester and then swapping at Lime St.

They look to be building a big old carpark at Headbolt lane so presumably any passengers for the Manchester side would just drive there.

And in terms of inbound commuting (if there is any) Headbolt isn't really any further from the actual centre than Kirkby station is, neither is in the centre, it's away from the railway.
 
Last edited:

mcnw35282

Member
Joined
27 May 2014
Messages
242
Location
Sin Tellins
Does anyone know what will happen to the Wigan platform at Kirkby station once the points and 2nd track are fully installed? Will they obliterate it completely like Garston, or leave it as is? I'm assuming the walkway under the sandstone bridge will be completely removed to allow the extension of the track under the bridge...

== Doublepost prevention - post automatically merged: ==

According to RTT, buses replace trains between Rainford and Kirkby from Friday 7th to Friday 28h April. Buses will also replace trains between Kirkby and Moorfields from Friday 28th April to Friday 5th May.
 
Last edited:

AMD

Member
Joined
6 Dec 2017
Messages
770
Realtime Trains is showing Northern services at Headbolt Lane from 24th July.
Definately no.
No fixed date yet but looking like late autumn now. There has been noise problems at the site that has upset the neighbours.

== Doublepost prevention - post automatically merged: ==

Been a while since I was last down to Kirkby so things have moved on, but still quite a bit to do till it can be signed off as fit for passengers
 

Attachments

  • 20230327_153354[1].jpg
    20230327_153354[1].jpg
    4.8 MB · Views: 126
  • 20230327_153357[1].jpg
    20230327_153357[1].jpg
    3.7 MB · Views: 126
  • 20230327_153401[1].jpg
    20230327_153401[1].jpg
    4.4 MB · Views: 128
  • 20230327_153406[1].jpg
    20230327_153406[1].jpg
    5.1 MB · Views: 128
Last edited:

mcnw35282

Member
Joined
27 May 2014
Messages
242
Location
Sin Tellins
So, it looks like the 19:39 arrival from Wigan this coming Thursday (6th April) will be the final Wigan train to terminate at Kirkby station...with buses replacing trains from Friday, 7th April until July 2023 (when I'm guessing Headbolt Lane is due to open). There is a poster at Kirkby explaining the bustitution situation with an asterisk next to “July 2023” saying “Headbolt Lane station opening date to be confirmed”
 
Last edited:

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,616
Location
Rochdale
I might have missed something but at one point the station was to be three platforms next to each other? Now it looks like from AMD's photo the Manchester trains will terminate on their own separate platform built out over the old up line to Wigan? I am assuming the connection will be broken again like at Kirkby? From the look of the third photo it looks as solidly built as the other two platforms which isnt great news for the extension anywhere east.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,587
Location
Greater Manchester
I might have missed something but at one point the station was to be three platforms next to each other? Now it looks like from AMD's photo the Manchester trains will terminate on their own separate platform built out over the old up line to Wigan? I am assuming the connection will be broken again like at Kirkby? From the look of the third photo it looks as solidly built as the other two platforms which isnt great news for the extension anywhere east.
headbolt lane.png
Here's a rough sketch of what the platform structure will look like.
 

WAO

Established Member
Joined
10 Mar 2019
Messages
1,216
We have been assured that the new platform is easily removeable. It's probably cheaper overall than track alterations.

WAO
 

alf

On Moderation
Joined
1 Mar 2021
Messages
422
Location
Bournemouth
We have been assured that the new platform is easily removeable. It's probably cheaper overall than track alterations.

WAO

We were assured five years ago that the new third track & platform at Tottenham Hale would have “passive provision” for a fourth line.

Look at it now.
Not even a 15” gauge Romney Hythe & Dymchurch track could be squeezed in as the fourth track at Tottenham Hale.

My point is that once built the Headbolt layout will headlock the operation to two tracks just as the Tottenham Hale work freezes the area to three tracks forever & thus sub standard timings on Cambridge & Stanstead trains.
 

mcnw35282

Member
Joined
27 May 2014
Messages
242
Location
Sin Tellins
I think these blocks will form the Wigan platform and the walkway between the two Liverpool platforms… (there are quite a few on site)
 

Attachments

  • F51906A6-D94E-4518-973D-CDD7D97F2034.jpeg
    F51906A6-D94E-4518-973D-CDD7D97F2034.jpeg
    933.5 KB · Views: 111
  • A2D09630-88C0-4DE9-9E00-FD4F3B476AB9.jpeg
    A2D09630-88C0-4DE9-9E00-FD4F3B476AB9.jpeg
    1.1 MB · Views: 109
Last edited:

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,807
Location
Liverpool, UK
I would have thought that a through platform was a must just to get stock movements and engineering trains access to Kirkdale Depot instead of the current complicated reversals involving four HST power cars.
 

Liverpool 507

Member
Joined
17 Jan 2018
Messages
642
Location
Merseyside
I think these blocks will form the Wigan platform and the walkway between the two Liverpool platforms… (there are quite a few on site)

I would have thought that a through platform was a must just to get stock movements and engineering trains access to Kirkdale Depot instead of the current complicated reversals involving four HST power cars.

It looks to me as if the track is staying in situ as the blocks to me look like they have grooves to go over the rail head. A good future proving method.
 

Baxenden Bank

Established Member
Joined
23 Oct 2013
Messages
4,743
We have been assured that the new platform is easily removeable. It's probably cheaper overall than track alterations.

WAO
The only words I have seen are that the pedestrian connection between the platforms (which prevents through running) can be removed (easily or not depends on your definition). Other than this thread/forum I have not seen anything which says an entire platform will be removed.
 

Baxenden Bank

Established Member
Joined
23 Oct 2013
Messages
4,743
#6


WAO
He heard somewhere.

Was the statement ever supported by a quote from a source?

We have already referred to an article in the July 2022 edition of Modern Railways, that is the one that referred to the walkway, not the platform.
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
The only words I have seen are that the pedestrian connection between the platforms (which prevents through running) can be removed (easily or not depends on your definition). Other than this thread/forum I have not seen anything which says an entire platform will be removed.
It is normal nowadays for the buffer stops to be fixed to rails which continue under, for example, a walkway which covers say, polystyrene blocks to form a crumple zone.
 

Parjon

Member
Joined
27 Oct 2022
Messages
519
Location
St Helens
Regardless of whether the platform is removable, there is little incentive for the LCR to progress further extension. Headbolt was supposed to be enabling works for Skelmersdale. The government slammed the door shut on the Skem extension.

It's lucky Headbolt is useful as a test for battery train operation, else it would have been a complete waste of the city region's cash, rather than mostly one.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,587
Location
Greater Manchester
Regardless of whether the platform is removable, there is little incentive for the LCR to progress further extension. Headbolt was supposed to be enabling works for Skelmersdale. The government slammed the door shut on the Skem extension.

It's lucky Headbolt is useful as a test for battery train operation, else it would have been a complete waste of the city region's cash, rather than mostly one.
They have quoted a want to expand many times, and the 777s batteries are known to have more than enough battery to go to Wigan and back, so that's a possible route beyond.
 
Last edited:

mcnw35282

Member
Joined
27 May 2014
Messages
242
Location
Sin Tellins
Not hanging about on the Wigan side at Kirkby station…last train only departed just before 8pm last night!
 

Attachments

  • EC117761-564A-44A4-9241-45978A0F0B73.jpeg
    EC117761-564A-44A4-9241-45978A0F0B73.jpeg
    5.1 MB · Views: 172
  • E7120C4D-6351-4F23-A8A5-D5303566F780.jpeg
    E7120C4D-6351-4F23-A8A5-D5303566F780.jpeg
    5.4 MB · Views: 172
Last edited:

D821

Member
Joined
1 Sep 2021
Messages
628
Location
The Wirral
How much will the new station increase the length of the Merseyrail side of the line by?
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,587
Location
Greater Manchester
How much will the new station increase the length of the Merseyrail side of the line by?
By drawing a line on google maps, about 1.32km (4317ft) based on the fact that in the CGI flythrough the freight train buffers are at the end of the Northern platform.
 
Status