I hope so, or there's a driver having tea and biscuits today...Have the line speed improvements on the Midland Mainline been implemented lately, my GPS was showing 123mph between Sharnbrook Jct and Bedford yesterday. (HST)
There were some timetable improvements last December, but the promise of a 90minute journey time from Nottingham to St Pancras by EMT's PR team was not quite as advertised.
There's just one train a day with a 90 minute journey time and EMT say there will be no further journey time improvements before electrification.
Yes, seeHave the line speed improvements on the Midland Mainline been implemented lately, my GPS was showing 123mph between Sharnbrook Jct and Bedford yesterday. (HST)
On a related note, here are the slides from a recent East Midlands Rail Summit with some of the plans for the MML from Network Rail and EMT.
http://www.emcouncils.gov.uk/write/East_Midlands_Rail_Summit_-_10_October_(presentations).pdf
I'm wondering whether Derby is better known in railway land for Bubbles than it is for Bombardier. Certainly handy during a gruelling training course.On the link kindly provided by ltj87, on page 27 is a picture of Bubbles Spa at derby, I am not quite sure where that fits into future plans.![]()
Interesting! So they propose to sort out the reverse curve at Market Harborough but keep the bridge over the old LNW route (with its speed restriction for curvature) rather than revert to the original full-speed Midland alignment. And a very interesting indication of how they propose to fit in a flyover at Wigston North Jn.
I'm glad you wrote that. I was busy with Google Maps thinking there must be two!I didn't know Kidsgrove was in the East Midlands (page 11 of that document).
Obviously they didn't understand what a derogation was or believed they were virtually impossible to get
I rather suspect a derogation for four-track with no tenfoot(s) at 125mph might not be quick to get or straightforward.
On the link kindly provided by ltj87, on page 27 is a picture of Bubbles Spa at derby, I am not quite sure where that fits into future plans.![]()
Is 125mph attainable between Wellingborough and Kettering anyway?
Does that mean that the 387s when delivered will be able to go above 100mph when on the Thameslink fasts?
On the link kindly provided by ltj87, on page 27 is a picture of Bubbles Spa at derby, I am not quite sure where that fits into future plans.![]()
Would a 110mph design speed have been any more expensive (I'm guessing it would be), and would there be enough 110mph track and running to make it worth it?Seems to me it was a mistake to build the class 700s without 110mph capability.
Would a 110mph design speed have been any more expensive (I'm guessing it would be), and would there be enough 110mph track and running to make it worth it?
I wonder how difficult it would be to upgrade them for 110mph operation once in service anyway, its been done with the 350/1s already remember.
Mind you they won't be able to do 110mph on the 3rd Rail. I don't know of any 3rd Rail installations capable of greater than 100mph.
Probably not, but they are also putting the fourth track back between Wellingborough and north of Bedford (including through Sharnbrook tunnel) where it is 125mph on the fast lines.
Recently received my 387 traction conversion course and they were very clear on the fact that we'd not be topping 100mph on TL routes.Does that mean that the 387s when delivered will be able to go above 100mph when on the Thameslink fasts?
On the first question I don't know.
On the second question, yes, pretty well the entire Midland Mainline fast lines between London and Bedford which are used by Thameslink and the entire East Coast Main line fasts between London and Peterborough which are used by services that will be Thameslink after 2018.
.
110 saves only 3 seconds a mile over 100. So with the exception of the run from West Hampstead to St Albans, and from wherever the ECML rises over 100 to Stevenage, the 700s won't be spending sufficient time on the fasts to make use of 110. And even in these two sections, the saving would not be that great.
Don't forget that in the peaks the roughly four per hour Thameslink superfasts ([St Pan]-[St Albs]-[Harp]-[Lut]-[Flit or Lea]-[Bed] only) trains run fast line all the way to/from Bedford South Junction.
And on the Thameslink, east coast line Peterborough services will be running fast line and then on the two track bits at Welwyn and especially north of Huntingdon where those 3 seconds a mile will all add up.
Don't worry, I'm not forgetting. The MML timetable will look different come 2018, and the 'Flitwick flyers' may not be on the fasts all the way, as there will be more EMTs to worry about. The Peterboro trains on the fasts north of Stevenage will be 365s. And about half the route Huntingdon to Peterboro is only 100 anyway.