Harrogate Line - adhesion problems

Status
Not open for further replies.

_toommm_

Established Member
Joined
8 Jul 2017
Messages
6,292
Location
South West London
As a commuter on the line, I'm concerned to see the amount of delays stacking up over the past few days. This time of year will always cause adhesion issues, but coupled with the single lines past Knaresborough, the timetable has fallen apart twice already this week, with trains skipping the stops between Leeds and Harrogate to make up time. The line is treated twice per day already by the Railhead Treatment Train. At what point do Northern and Network Rail implement an emergency timetable.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

1D53

Established Member
Joined
2 Apr 2006
Messages
2,885
What sort of emergency timetable would you propose?
 

1D53

Established Member
Joined
2 Apr 2006
Messages
2,885
More time becomes an issue with the turnaround time at Leeds, the slots into/out of York and the single line sections. I would say operating in two sections would be the most reliable way to improve things but would be horrifically unpopular.
 

Ballyheigue

Member
Joined
11 Sep 2025
Messages
319
Location
Leeds
I think a reduced timetable would work, and maybe skipping Horsforth if an LNER is due in the same half hour? Either that or split the route in two, what ever is done won't be popular but you can't exactly stop the leaves from falling, maybe Northern ought to suggest to the local councils that all trees within a mile of it's line are cut down be they public or private lol.
 