• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Harlington replacement footbridge

Status
Not open for further replies.
Joined
19 Jul 2023
Messages
342
Location
Milton Keynes
There's a BBC article https://www.bbc.co.uk/news/articles/cje723qw25vo about replacing the footbridge at Harlington:

"Construction work has begun on a new £7.9m footbridge which will connect platforms at a railway station.

The bridge over the Midland Mainline at Harlington Station, Bedfordshire, will be completed by next spring and has been designed to last for more than a century, says Network Rail.

It will replace an older bridge which has recently shown signs of corrosion."

I was a little surprised that they don't appear to be adding lifts at the same time to make the station accessible but assume the reason is the cost - presumably the assumption is that if you need an accessible station you will travel from one of the nearby stations, they being quote close together down the line from Bedford to London.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

stuu

Established Member
Joined
2 Sep 2011
Messages
3,763
Nearly £8m for a prefab footbridge without lifts seems pretty outrageous, even by current NR standards
 
Status
Not open for further replies.

Top