Not sure I approve of the TGS being a slam door, unless the guard will always dispatch from there? People's bikes often get forgotten by staff on Pendolinos. I see the security benefit of a "guard only" door but the practical disbenefit is significant.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

bastien

Member
Joined
14 Aug 2016
Messages
427
Surely one of the primary advantages of having the power doors fitted was shorter dwell times, not worse than a 158 dwell times and potentially no better than existing HST dwells.

Sorry to spoil another RF.co.uk 'scoop', but... Didn't someone say, earlier on, that fitters have travelled down with the train? The doors may not be correctly set up yet.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,896
Not sure I approve of the TGS being a slam door, unless the guard will always dispatch from there? People's bikes often get forgotten by staff on Pendolinos. I see the security benefit of a "guard only" door but the practical disbenefit is significant.
Given that the TGS van door is different to other doors you’re adding a whole lot of cost and complexity for minimal benefit in what is not a passenger carrying area.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,896
It's still the Grammer IC3000s, excellent news. It has been done to GWR spec, much like set LA15.

I have a photo.
More to the point, what’s the seat layout? Still minimal tables and maximum airline or something more suitable for the services they will operate?
 

47802

Established Member
Joined
6 Mar 2010
Messages
3,454
Surely one of the primary advantages of having the power doors fitted was shorter dwell times, not worse than a 158 dwell times and potentially no better than existing HST dwells.

I think the primary advantage is to meet the PRM compliance, the other is a side benefit. Or put this way do you think they would have fitted Power doors given the cost and complexity just to improve dwell time?
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,280
Surely one of the primary advantages of having the power doors fitted was shorter dwell times, not worse than a 158 dwell times and potentially no better than existing HST dwells.

A lot of the time spent by HSTs standing at unstaffed stations/platforms is so that the train manager can walk up and down the length of the train, or most of it, to check that the slam doors are actually shut - with interlocked power doors there won't be any need to do that.

Not sure I approve of the TGS being a slam door, unless the guard will always dispatch from there? People's bikes often get forgotten by staff on Pendolinos. I see the security benefit of a "guard only" door but the practical disbenefit is significant.

People will not be putting bikes on and off at every stop anyway and it is just one single door to check on a short formation when someone has actually been putting a bike on or taking one off.

Simply not worth the time and money to put a power door there, given how little use it would get compared with the other doors.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,235
Surely one of the primary advantages of having the power doors fitted was shorter dwell times, not worse than a 158 dwell times and potentially no better than existing HST dwells.
They're slow, but don't look excessively so to me, no more say than on a Class 450, and if you know just how long HST dwell times are at the many unstaffed stations with curved platforms in Cornwall this must definitely be an improvement
 

superalbs

Verified Rep - Superalbs Travels
Joined
3 Jul 2014
Messages
2,864
Location
Kraków
More to the point, what’s the seat layout? Still minimal tables and maximum airline or something more suitable for the services they will operate?
I think it's the same as the low-density carriages on the current layout, maybe eight tables per carriage?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,359
Location
Glasgow
lk up and down the length of the train, or most of it, to check that the slam doors are actually shut - with interlocked power doors there won't be any need to do that.

True, it will probably be an improvement just not as much as I thought it might be.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,359
Location
Glasgow
They're slow, but don't look excessively so to me, no more say than on a Class 450, and if you know just how long HST dwell times are at the many unstaffed stations with curved platforms in Cornwall this must definitely be an improvement

I only really have experience of the Highland Chieftain in recent times
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,773
Location
Nottingham
However slow the power doors they are quicker than having the platform staff walk or run (according to level of fitness and enthusiasm) along the platform when they've been left open.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,359
Location
Glasgow
However slow the power doors they are quicker than having the platform staff walk or run (according to level of fitness and enthusiasm) along the platform when they've been left open.

Good bit of exercise though! But yes it is far more ideal, I'm a bit anxious to see how they shape up here in Scotland if they have slower doors than the 170s.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,364
Location
Bolton
I think the primary advantage is to meet the PRM compliance, the other is a side benefit. Or put this way do you think they would have fitted Power doors given the cost and complexity just to improve dwell time?
It's not a question of improving dwell times. HSTs in any form will always have worse dwell times than 150s.

I hope they have rearranged the seating layout into something more tourist friendly. The 'Reading Commuter' layout in some of the vehicles is almost worse than a 150 for enjoying the view.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,896
I think it's the same as the low-density carriages on the current layout, maybe eight tables per carriage?
"Low density" (which is a joke) is 4 tables per coach; "high density" is 2. Except for the TSD vehicles which have, er, none.
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,615
Not sure I approve of the TGS being a slam door, unless the guard will always dispatch from there? People's bikes often get forgotten by staff on Pendolinos. I see the security benefit of a "guard only" door but the practical disbenefit is significant.

I can't think where but I feel as though I have read that there is some issue with that slam door on the TGS which means they could not be replaced with the same design of new door as the others. Its clearly not going to be worth designing an alternative door if that is the issue.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,896
I can't think where but I feel as though I have read that there is some issue with that slam door on the TGS which means they could not be replaced with the same design of new door as the others. Its clearly not going to be worth designing an alternative door if that is the issue.
If you look at the TGS door, it's a wider door - there's an extra opening element to it.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,359
Location
Glasgow
I can't think where but I feel as though I have read that there is some issue with that slam door on the TGS which means they could not be replaced with the same design of new door as the others. Its clearly not going to be worth designing an alternative door if that is the issue.

The Guard's Van on the TGS has a different door design.
 

whhistle

Established Member
Joined
30 Dec 2010
Messages
2,636
I thought all the door mods were being done by the same company?
Hence MML not being able to get theirs done in time as they other operators got their orders in first?
If (being done by the same company), how come these are different to the Chiltern version?

I understand "inner slide" doors are quicker to open than the "pop-out" doors, but that doesn't seem to be the issue here.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,235
I thought all the door mods were being done by the same company?
Hence MML not being able to get theirs done in time as they other operators got their orders in first?
If (being done by the same company), how come these are different to the Chiltern version?

I understand "inner slide" doors are quicker to open than the "pop-out" doors, but that doesn't seem to be the issue here.
The Chiltern conversion was a completely separate, unrelated project. There were huge problems with it because each door had to be tailor made to fit individual coaches. With a sliding pocket door the same precision of fit is not so vital.
 

47802

Established Member
Joined
6 Mar 2010
Messages
3,454
I thought all the door mods were being done by the same company?
Hence MML not being able to get theirs done in time as they other operators got their orders in first?
If (being done by the same company), how come these are different to the Chiltern version?

I understand "inner slide" doors are quicker to open than the "pop-out" doors, but that doesn't seem to be the issue here.

Because its some time since the Chiltern version was done, things have moved on the sliding door solution is meant to be cheaper and easier to implement.

If the doors are a bit slow to close so what, the point is they are PRM compliant and are still likely to have a quicker dwell time than a slam door version.
 

bastien

Member
Joined
14 Aug 2016
Messages
427
I love how these doors are now officially too slow, based on one video clip of one door one one test run!

Surely we should at least reserve judgement until the GPS crew have had at them with their stopwatches and done an Excel spreadsheet.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,359
Location
Glasgow
I love how these doors are now officially too slow, based on one video clip of one door one one test run!

Surely we should at least reserve judgement until the GPS crew have had at them with their stopwatches and done an Excel spreadsheet.

You know this forum, everyone's an expert based on one photo, a media article, a short video or hearsay and rumour! ;)
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,359
Location
Glasgow
Because its some time since the Chiltern version was done, things have moved on the sliding door solution is meant to be cheaper and easier to implement.

If the doors are a bit slow to close so what, the point is they are PRM compliant and are still likely to have a quicker dwell time than a slam door version.

The Chiltern doors look far nicer, being flush with the bodyside.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,359
Location
Glasgow
I certainly agree here, the inset doors that don't follow the bodyshell shape look cheap and nasty. But if they make the concept viable by keeping the cost low, it's worth putting up with this.

It's always the way though isn't it, the way to save money is get something cheap and ugly.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
It's always the way though isn't it, the way to save money is get something cheap and ugly.

Cheap and ugly, but in service after hopefully a few months (once Wabtec get up to speed) rather than a few years. I'd rather have an ugly train than a short formed train or none at all.
 
Status
Not open for further replies.

Top