Just heard from a friend who is travelling on the 17.03 Paddington to Penzance train this evening that it has had to be terminated at Newton Abbot after the drivers cab windscreen was smashed by a stone after the train was hit by a large wave at Dawlish. Surely this must raise some health and safety issues as to why this very exposed line remains open to trains that are too often being allowed to "run the gauntlet" there in severe weather especially when the nearby sea front road in Torquay is routinely closed in similar circumstances.
Incidentally Cross Country has now stopped its Voyagers at Exeter for three high tides on the run at Dawlish. (Last night/this morning and evening) and is likely to do the same for tomorrow mornings high tide. Whats the answer, or isnt there one and how long will it be before there is a very serious incident there?
A stone breaking a windscreen barely registers on the Richter scale for train incidents.Whats the answer, or isnt there one and how long will it be before there is a very serious incident there?
For all the money spent on the section I do wonder why slab track has never been put down there to stop the ballast getting washed away. The next step would be a cut-and-cover type covering.
Presumably because historically when the track has washed away, it has been where the sea wall has been breached and the formation has gone first. Slab track isn't much good if there's nothing to hold it up. It's also much quicker to tip a few truckloads of ballast into a hole than reform a slab.
I don't think there have been many wall collapses compared to washouts, which I can recall here back in the 1960s. Marine wall collapses are an extremely unusual event at coastal defences anywhere around the country, a number even more exposed than this one.Presumably because historically when the track has washed away, it has been where the sea wall has been breached and the formation has gone first. Slab track isn't much good if there's nothing to hold it up. It's also much quicker to tip a few truckloads of ballast into a hole than reform a slab.
That would be glued ballast....
, is it all the ballast then or just the shoulders? What sort of solution is it? (Please don't say glue)The line at Dawlish has lasted a long time. .

That would be glued ballast....
Well yep, I'd got that far with my deductions![]()
Alteratively, it could be that in 1900 there weren't webcams and social media sites providing live, 24/7 coverage of every drop of water coming over the sea wall.What is becoming increasingly clear now regards the seawall rail route at Dawlish is that...
Alteratively, it could be that in 1900 there weren't webcams and social media sites providing live, 24/7 coverage of every drop of water coming over the sea wall.
Alteratively, it could be that in 1900 there weren't webcams and social media sites providing live, 24/7 coverage of every drop of water coming over the sea wall.
The sea level has changed little in the last century, about 6 inches in some places round the world, some less.What is becoming increasingly clear now regards the seawall rail route at Dawlish
What level of disruption do you consider unacceptable?What is becoming increasingly clear now regards the seawall rail route at Dawlish is that a combination of rising sea levels particularly since about 1900 and warmer oceans (thermal expansion) are resulting in an increasing risk of disruption from even relatively modest levels of storminess now. The current weather in Devon is by no means severe by historical standards yet the level of rail disruption at Dawlish seems to be on the increase! But what is really worrying with all this is that what would be totally unacceptable in other parts of the country is fast becoming the accepted norm by both government and the rail industry in Devon. Even the local media both BBC and ITV now pay scant regard now to these constant unacceptable rail disruptions at Dawlish, no doubt under political pressure from Westminster.
I agree. A process known as 'longshore drift is continuously removing sand from the beaches at Teignmouth and Dawlish and moving it down the coast towards Exmouth. Before the railway and more importantly the protective sea wall were built there natural erosion of the cliffs would have continually replaced this lost sand. When I passed Dawlish on an earlier train at low tide on the day the GWR HST suffered a cracked windscreen and incidentally two other local units windows were also damaged what was obvious was that all the sand on the beach in front of the sea wall just to the east of Dawlish station has been completely removed exposing vast amounts of stones big and small to wave action.A reef needs to be put in to take the power off the waves. Back in the 70's you could walk along the beach (in the Summer) at any state of the tide. I when there last year and only the beach that is left is by Langstone rock.
For all the money spent on the section I do wonder why slab track has never been put down there to stop the ballast getting washed away. The next step would be a cut-and-cover type covering.
I'd say that is more that likely the case. The mechanics of a breaking wave getting a chunk of ballast to windscreen height are a little bit hard to fathom.The stone that smashed the train windscreen may have come from sediment thrown up by the sea rather than railway ballast ...