Will there be any Freight along the GWR lines using electric haulage?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Oxfordblues

Member
Joined
22 Dec 2013
Messages
1,140
There's certainly potential, but all flows would require "last mile" diesel-haulage at either end. For example: Bridgend-Dagenham automotive components could be electric from Cardiff, but Colas has no bi-mode locos; similarly London Gateway-Wentloog and Tilbury-Wentloog intermodals could be electric for most of their journeys, but neither do Freightliner have suitable traction. En-route loco changes are out of the question because of the cost and risk to performance.
 

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,531
Will there be any Freight along the GWR lines using electric haulage?
Probably about as much as there currently is on the ECML!! ;)

(in other words, as Oxfordblues says, just because a line is electrified doesn't mean that
existing, diesel-hauled freight services will change over to electric traction as the vast
majority of freight terminals/yards are not wired)




MARK
 

Mollman

Established Member
Joined
21 Sep 2016
Messages
1,735
Location
Preston
DRS have talked about using 88s on the Daventry to Wentloog service once the wires reach South Wales.
 

lewisf

Member
Joined
21 Feb 2009
Messages
381
Location
Kingston/Surbiton
There isn’t a wired connection between the GWML and the rest of the network unless you count the route through North Pole depot
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,777
Location
Nottingham
A re-route down to London could see it under the wires all the way.
To be fair it's only a very short section in the tangle of lines around Acton-Willesden that isn't wired - sorry I don't have the junction names to hand. Perhaps within the capabilities of the diesel engine on the 88, though it is on a bit of a gradient.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,964
Location
Mold, Clwyd
Acton Wells isn't wired?

You need several bits of new wiring in the Acton area to make much difference.
Acton Wells Jn down the hill to Acton Main Line is one missing link (GW's "Poplar Branch"), which would connect the GWML/NLL and further east.
Then Acton Wharf Jn to Acton Wells Jn, to connect the WCML.
You need to wire Acton Wells Jn to West London Jn to reach the WLL and Euston.
I think the plan was also to wire round to Cricklewood/Brent to connect the MML (Heathrow Express once wanted to go that way into St Pancras).
All these links are short but technically complex, linking as they do several discrete electrification (and signalling) systems.
All this did appear in the original CP5 HLOS electrification plan but was deleted early on.
The freight guys were not interested in funding any of it.
Gospel Oak-Barking was also part of the same cross-London debate, and got through because there were passenger (TfL) interests as well as freight.
That wasn't an easy scheme either.
 

whhistle

Established Member
Joined
30 Dec 2010
Messages
2,636
It's a wonder Stadler didn't look at batteries for the 88 locos.
Could be charged using OHLE, run off batteries for the depot but have a charging point at the end where the pan can be raised again to re-charge the batteries.
Perhaps there isn't sufficient tech that's been proven as yet though I guess.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,322
You need several bits of new wiring in the Acton area to make much difference.
Acton Wells Jn down the hill to Acton Main Line is one missing link (GW's "Poplar Branch"), which would connect the GWML/NLL and further east.
Then Acton Wharf Jn to Acton Wells Jn, to connect the WCML.
You need to wire Acton Wells Jn to West London Jn to reach the WLL and Euston.
I think the plan was also to wire round to Cricklewood/Brent to connect the MML (Heathrow Express once wanted to go that way into St Pancras).
All these links are short but technically complex, linking as they do several discrete electrification (and signalling) systems.
All this did appear in the original CP5 HLOS electrification plan but was deleted early on.
The freight guys were not interested in funding any of it.
Gospel Oak-Barking was also part of the same cross-London debate, and got through because there were passenger (TfL) interests as well as freight.
That wasn't an easy scheme either.
It wasn’t ever deleted, it was redefined as a separate standalone sub-project. But the Dec 2018 version of the EDP still includes all the details you mention above, and is still “assumed CP6”.
 