• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

GWR direct service to Birmingham

Status
Not open for further replies.

HarleyDavidson

Established Member
Joined
23 Aug 2014
Messages
2,544
Does a path through Dorridge become free if CrossCountry manage to meet their aspiration to get all their services routed via Coventry? (Not that it is obvious how CrossCountry do that as Arriva Trains Wales have their service to Birmingham International on the opposite side of the hour.)

Best answer for GWR to get to Birmingham is to get the line through Stratford-upon-Avon reopened but clearly there is absolutely no chance of that.

Might become available when E-W Rail opens to Bletchley and they can sling an XC across there to WCML.

Or if something daft happens like the Cotswolds line gets redoubled throughout, but there's more chance of pig's flying.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,749
I think XC can find a path via Coventry on weekends when the route via Solihull is blocked, even with ATW running between International and New Street.

Thats because LM change their service and dont run the xx.33 to London on Sundays, it becomes a Coventry local at xx.36 and the ATW goes at xx.39
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,061
But before adding any more XC services (or anyone else's) - on a route where there is already a lot of pressure on available paths all the way between Birmingham and Reading, and Network Rail expecting yet more container trains to go that way - the first thing that should be done is to make the best possible sure of the existing express passenger paths. Running four-car Voyagers in them is pretty much as far as you can get from efficient use of them.

What do you mean by 'their service'? There is no plan for a GWR service to Birmingham.

Any marginal time that could perhaps be squeezed out of IETs operating on the Oxford/Cotswold route is far more likely to be used to add extra services at the eastern end of the Cotswold Line, or on a revival of a Paddington-Oxford-Stratford-upon-Avon service targeted squarely at tourist traffic, which GWR managing director Mark Hopwood has spoken about previously - a service the DfT was prepared to listen to proposals for in the aborted GW franchise bidding round in 2012.

And if anyone should know about a likely market for such a service to Stratford, it's Mr Hopwood, since helping to set up the former NSE service was, I believe, one of his first jobs when he joined BR.

But such a service would be limited (a handful of trains each way each day) and timed to meet tourist needs, with any benefit to other passengers between Oxford, Banbury and Leamington being incidental - despite which XC would no doubt kick up a fuss about revenue extraction, even if it was offering some form of capacity relief to its own inadequate trains.

My posts were generally in the response that there's no hour of such a service happening because no one would use it to travel between London and Birmingham.

I also wasn't making the point that IF GWR were able to run such a service that it could be brought into service faster than XC were likely to be able to get longer trains.

Did I say that paths were possible, no, my points were more against the general view of a significant number of posts saying that it wouldn't be a viable service as no one would use it by pointing out those that would use it. My only reference to paths was on the London Oxford section by saying that it wouldn't require extra paths on that section of your were extending an existing services. Pathing into Birmingham is a very different matter and if there are no paths then clearly it's not going to happen

Also where did I talk about IET's increasing journey times, I didn't because I wasn't looking to speed services up. Rather just extend existing services (most likely run by 16x's) beyond Oxford.

With regards to a service to Stratford Upon Avon, given that there will have been 8 years of passenger growth between 2012 and 2020 at the start of the new GWR franchise (between 20% and 50% for 2.5% to 5% growth per year) that could push the numbers in the favour of a more frequent service.

I could see that to run to Leamington Spa could be quite attractive, however if there's no space to turn around there, it could make good business sense to run to Stratford as a loss leader to get a load of extra revenue between Oxford and Leamington Spa. Even if those services ran roughly every other hour.

Currently to get to Stratford Upon Avon from Reading is a broadly 120 minutes journey (except for one journey a day where is 100 minutes) with a direct service (up to 8 station stops) it could be done in 90 minutes.

Have the service call at Didcot and it could be a similar journey time going that way to Stratford Upon Avon from Bristol add it is via Birmingham but without the need to walk across Birmingham. That's potentially going to make it a more attractive option for a lot of people.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,951
Location
Mold, Clwyd
Nothing will happen until GWR and XC franchises are re-let in 2019.
Arguably, the only journeys not catered for at the moment are Slough/Maidenhead to Birmingham, and maybe Swindon-Birmingham.
Neither operator has any spare stock anyway.
It's something that might suit portion working by 800s as extensions of Oxford/Cheltenham services.
 

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,497
Location
Over The Hill
I would suggest that the source(s) of the speculation in this thread is from the various service options that have been put forward as part of the Western Rail Link to Heathrow project and have certainly been discussed in another thread here somewhere. In short the most likely service seems to be a 15-minute interval service Paddington-Heathrow-Reading with each of those to be extended to a suitable destination. Originally it was expected that all trains would be straight electrics so the destinations would depend on future electrification schemes but of course "bi-modes rule" today so there might now be more options to consider. In any case it seemed almost certain that one service would continue onto East-West Rail thereby serving Oxford and Milton Keynes but the other options (from memory) included Basingstoke, Bristol, Cardiff and Birmingham. It's worth noting that the first public consultation round closed in April of this year and Network Rail are due to hold a further round of consultation this autumn.

https://www.networkrail.co.uk/our-railway-upgrade-plan/key-projects/heathrow-rail-link/


As for the older incarnations of Paddington-Birmingham trains I remember such services running in the mid-1970s which effectively plugged the gaps in the embryonic cross-country network. Back then Birmingham-Southampton(-Poole) was at best a 2-hourly service which left some awkward gaps at various times, hence the Paddington trains. They also provided occasional opportunities to see Westerns (as in D1000s!) at New Street. And there were definitely occasional extensions beyond New Street to Worcester Shrub Hill which then continued back to Paddington via either the Cotswold Line or the Stroud Valley Line, I cannot remember which.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,280
My posts were generally in the response that there's no hour of such a service happening because no one would use it to travel between London and Birmingham.

I also wasn't making the point that IF GWR were able to run such a service that it could be brought into service faster than XC were likely to be able to get longer trains.

If you say so...

Did I say that paths were possible, no, my points were more against the general view of a significant number of posts saying that it wouldn't be a viable service as no one would use it by pointing out those that would use it. My only reference to paths was on the London Oxford section by saying that it wouldn't require extra paths on that section of your were extending an existing services. Pathing into Birmingham is a very different matter and if there are no paths then clearly it's not going to happen

Who would use it that isn't able to use services that exist right now? Posts keep going on about Slough and Maidenhead for some reason - never mind that there are perfectly acceptable connections at Reading right now between GWR and XC services all day and little evidence there is some overwhelming unmet demand for through trains.

Also where did I talk about IET's increasing journey times, I didn't because I wasn't looking to speed services up. Rather just extend existing services (most likely run by 16x's) beyond Oxford.

By marginal time, I meant using time sat in sidings at Oxford, between working back to London - were the infrastructure up the Cotswold Line in place, it would be possible for units on London turns to fit in a trip to Hanborough and back right now, rather being parked for half-an-hour - there may be IET units spare outside the peaks that GWR could use to work a Stratford service - indeed I'm sure that's how it would be done, if DFT permitted it in future

With regards to a service to Stratford Upon Avon, given that there will have been 8 years of passenger growth between 2012 and 2020 at the start of the new GWR franchise (between 20% and 50% for 2.5% to 5% growth per year) that could push the numbers in the favour of a more frequent service.

I could see that to run to Leamington Spa could be quite attractive, however if there's no space to turn around there, it could make good business sense to run to Stratford as a loss leader to get a load of extra revenue between Oxford and Leamington Spa. Even if those services ran roughly every other hour.

Currently to get to Stratford Upon Avon from Reading is a broadly 120 minutes journey (except for one journey a day where is 100 minutes) with a direct service (up to 8 station stops) it could be done in 90 minutes.

Have the service call at Didcot and it could be a similar journey time going that way to Stratford Upon Avon from Bristol add it is via Birmingham but without the need to walk across Birmingham. That's potentially going to make it a more attractive option for a lot of people.

The idea of GWR running trains to Stratford is not with making a loss in mind - as I thought I had indicated by pointing out that Mark Hopwood helped set up the NSE service in the early 1990s, so he probably knows plenty about the potential to make money from such a service.

If he didn't think it would make money, I doubt he would have any interest. Any slice of revenue from Leamington passengers would be largely incidental - the real target market is the large number of coaches carrying tourist between London and Stratford on the M40 at the moment.

Rail has a dismally low share of the market for travel to Stratford - hardly helped by Chiltern's near-complete lack of interest. A high-quality service, marketed properly to the tourist trade, really ought to be a nice little earner.

Very large numbers of overseas visitors (they are the market, not people from Bristol) visit London, Oxford and Stratford, that's why BR developed the service it did in the 1990s and Thames Trains continued it - it was excised by the SRA in one of their 'tidying-up the map' exercises which appears not to have taken any account of why the service was started in the first place and why it didn't use Marylebone.


(it is notably difficult to get from Heathrow airport by train to Birmingham),

In the absence of a Western rail link, it is notably difficult to get to plenty more places than Birmingham by train - like the entire GWR network west of Hayes & Harlington...
 
Last edited:

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,408
If you say so...

The idea of GWR running trains to Stratford is not with making a loss in mind - as I thought I had indicated by pointing out that Mark Hopwood helped set up the NSE service in the early 1990s, so he probably knows plenty about the potential to make money from such a service.

If he didn't think it would make money, I doubt he would have any interest. Any slice of revenue from Leamington passengers would be largely incidental - the real target market is the large number of coaches carrying tourist between London and Stratford on the M40 at the moment.

Rail has a dismally low share of the market for travel to Stratford - hardly helped by Chiltern's near-complete lack of interest. A high-quality service, marketed properly to the tourist trade, really ought to be a nice little earner.

Very large numbers of overseas visitors (they are the market, not people from Bristol) visit London, Oxford and Stratford, that's why BR developed the service it did in the 1990s and Thames Trains continued it - it was excised by the SRA in one of their 'tidying-up the map' exercises which appears not to have taken any account of why the service was started in the first place and why it didn't use Marylebone.

Tourist coaches are a far better means to serve Stratford-upon-Avon than trains and normal coaches because they can go to multiple tourist attractions in the area so easily and take indirect routes via pretty Cotswold villages instead of simply using the M40.

https://www.goldentours.com/stratford-upon-avon-tours

It is telling that National Express only run three direct coaches each day from Victoria Coach Station to Stratford-upon-Avon and Chiltern don't run direct from Marylebone any more. They appear to have decided that there isn't demand.

The 1990s service was effectively a way of utilizing spare rolling stock during the day between the peaks and had first been tried with a high speed train in Intercity days. Slightly easier to path it back then. More recently, London Midland have started to run more frequently to Stratford-upon-Avon including over the single line through Claverdon.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,280
Tourist coaches are a far better means to serve Stratford-upon-Avon than trains and normal coaches because they can go to multiple tourist attractions in the area so easily and take indirect routes via pretty Cotswold villages instead of simply using the M40.

But the fact of the matter is that for all the coaches that go to other places nearby, there are also lots and lots of coaches that do nothing other than London-Stratford and back on the M40, as that is all their passengers want/are going to see of England outside London.

It is telling that National Express only run three direct coaches each day from Victoria Coach Station to Stratford-upon-Avon and Chiltern don't run direct from Marylebone any more. They appear to have decided that there isn't demand.

No, it's not telling. It takes no account whatever of the substantial numbers of people just doing day trips to Stratford from London on organised tours with travel thrown in, for whom a National Express service is of no interest - and marketing to the tour operators would be fundamental to any revived rail service via Oxford.

Re the Chiltern service, they aren't bothered about Stratford, as they would rather make money shipping people to Bicester Village and destinations to Birmingham.

The 1990s service was effectively a way of utilizing spare rolling stock during the day between the peaks and had first been tried with a high speed train in Intercity days. Slightly easier to path it back then. More recently, London Midland have started to run more frequently to Stratford-upon-Avon including over the single line through Claverdon.

It was also an effective way of making money with that rolling stock, as it linked the key trinity of destinations for overseas visitors, London, Oxford and Stratford-upon-Avon - which is precisely the point that Mark Hopwood made when I was at a meeting where he spoke about the idea of a GWR (FGW as it was then) service going to Stratford again - and why the company has also put money into Grip study work on reopening Honeybourne-Stratford.

As I keep saying, Mr Hopwood does know his stuff on this subject, whether you like it or not.

Yes, pathing would be harder than in the past but I don't think they would envisage offering that many trains each day, just a few targeted at key times each way for the group travel market.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,343
So what's happened with the paths on Didcot to Birmingham? There used to be a substantial operation of coal trains from Yorkshire to Didcot power station, which obviously did not operate at passenger train speeds. I'm not conscious of any significant increase in passenger service frequency since they stopped running.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,061
Who would use it that isn't able to use services that exist right now? Posts keep going on about Slough and Maidenhead for some reason - never mind that there are perfectly acceptable connections at Reading right now between GWR and XC services all day and little evidence there is some overwhelming unmet demand for through trains.

The point it's that there are places which are other than Paddington or Reading that would benefit from such a service.

Is worth noting that the rail planners suggest a change at Oxford when traveling from Slough, rather than Reading, which has a 20-25 minute gap in the service.

Passengers from Newbury have a similar delay when changing trains at Reading.

Then there's the issue of the increased likelihood of delays and cancellations on XC services because of the length of the routes over which they run.

By marginal time, I meant using time sat in sidings at Oxford, between working back to London - were the infrastructure up the Cotswold Line in place, it would be possible for units on London turns to fit in a trip to Hanborough and back right now, rather being parked for half-an-hour - there may be IET units spare outside the peaks that GWR could use to work a Stratford service - indeed I'm sure that's how it would be done, if DFT permitted it in future

Even without using the advantage of faster units (say by using 16x's) the extra capacity provided by the GWR service would need less additional units than of XC were to run longer trains.

The idea of GWR running trains to Stratford is not with making a loss in mind - as I thought I had indicated by pointing out that Mark Hopwood helped set up the NSE service in the early 1990s, so he probably knows plenty about the potential to make money from such a service.

If he didn't think it would make money, I doubt he would have any interest. Any slice of revenue from Leamington passengers would be largely incidental - the real target market is the large number of coaches carrying tourist between London and Stratford on the M40 at the moment.

The point was more to do with the fact that Stratford may not be as easy to define how many people would use such a service from day one, unlike people using services between Leamington Spa and Oxford where it is easy to see passenger numbers.

As such the potential lower returns from known passengers could make it worth running what could have the potential to be a loss leader compared with the better understood numbers from existing services. That's not to say that the service at a whole wasn't making money, but it could be to ensure that people travel by train that there are some less profitable services at certain times of the day.


In the absence of a Western rail link, it is notably difficult to get to plenty more places than Birmingham by train - like the entire GWR network west of Hayes & Harlington...

It is why the western link (and to the same extent southern link to the SWML) should be a priority. As there are lots of places within an hour's drive of Heathrow who are practically unable to get to Heathrow by public transport.

However Birmingham to Heathrow will change once HS2 is operating add it is likely to be quicker to change at Old One Common. Although that would then attract people too use the Southern Approach to travel on HS2 rather than them fight across London on the tube or use XC to avoid London.
 

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,497
Location
Over The Hill
As an aside efforts to tap into the day trip market from London to Stratford-on-Avon are nothing new. BR tried it in pre-Sectorisation days using a dedicated coach link from Coventry with through fares from London Euston booked on specific services. I have no idea if it was well used or not.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,280
So what's happened with the paths on Didcot to Birmingham? There used to be a substantial operation of coal trains from Yorkshire to Didcot power station, which obviously did not operate at passenger train speeds. I'm not conscious of any significant increase in passenger service frequency since they stopped running.

Passenger services are broadly the same, but there has been a substantial increase in the number of container trains between the West Midlands ( and further north) and Southampton docks.

That trend that is expected to continue and is one of the factors driving work on proposals for extra capacity, including partial or full quadruple tracking between Oxford and Didcot.

The point it's that there are places which are other than Paddington or Reading that would benefit from such a service.

Is worth noting that the rail planners suggest a change at Oxford when traveling from Slough, rather than Reading, which has a 20-25 minute gap in the service.

Passengers from Newbury have a similar delay when changing trains at Reading.

Then there's the issue of the increased likelihood of delays and cancellations on XC services because of the length of the routes over which they run.

The journey planners may suggest a change at Oxford for Slough passengers off-peak (when Oxford fasts call) but they don't in the peaks, when the change is at Reading.

There may be some people desperate to do Slough-Birmingham without a change, but is that number so overwhelming that it would justify such a service? Where's the evidence?

No one is going to sit on something making lots of stops along the way, when they could change and cut 30+ minutes off the time

Even without using the advantage of faster units (say by using 16x's) the extra capacity provided by the GWR service would need less additional units than of XC were to run longer trains.

The fact of the matter is that XC's services need more coaches, both for Birmingham-Oxford-Reading and on lots of other parts of their journeys all over the country, so sorting out that problem will be benefit far more people, in far more places, than worrying if a few people can get from Slough to Birmingham on a through train run by GWR.

The point was more to do with the fact that Stratford may not be as easy to define how many people would use such a service from day one, unlike people using services between Leamington Spa and Oxford where it is easy to see passenger numbers.

As such the potential lower returns from known passengers could make it worth running what could have the potential to be a loss leader compared with the better understood numbers from existing services. That's not to say that the service at a whole wasn't making money, but it could be to ensure that people travel by train that there are some less profitable services at certain times of the day.

How many times do I have to repeat the point? Mark Hopwood knows what he is talking about when it comes to London-Oxford-Stratford and its earning potential, notably from the tourist market - which also drives GWR support for Honeybourne-Stratford reopening, as that would add direct access to stations in the Cotswolds to the mix.

FGW wouldn't even have suggested a resumption of the Stratford service at the aborted franchise bidding round in 2012 if it wasn't confident about making money - with, I repeat, any share of Leamington revenue pretty much incidental in the big picture.

The likely number of GW trains each day, should a Straford service happen in the next few years, wouldn't put much of a dent in XC and Chiltern's income, nor add much passenger capacity in the overall scheme of things - and certainly nothing like what would be delivered by XC simply operating trains of the size that are needed on its services.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,061
The journey planners may suggest a change at Oxford for Slough passengers off-peak (when Oxford fasts call) but they don't in the peaks, when the change is at Reading.

There may be some people desperate to do Slough-Birmingham without a change, but is that number so overwhelming that it would justify such a service? Where's the evidence?

No one is going to sit on something making lots of stops along the way, when they could change and cut 30+ minutes off the time

Most services, even those in the peaks, have Oxford as the change point from Slough.

I have never suggested it would be stopping service, however even it were, with the change requiring a broadly 25 minute wait (some as low as 20 some as long as 30) a direct service would have to call at something like 18 additional stations for people to see a 30 minute cut in the journey time over the direct service. Given that there's a maximum of 15 stations between Oxford (the current advised change point) and Birmingham that still would mean that the journey would be quicker.

The problem is that often the XC departures from Reading aren't well timed for other connecting services for instance Newbury has a 30 minute wait, North Downs Line has a 25 minute wait and the Waterloo Line has a 30 minute wait.

Also it should be noted that is assuming that the service was running to Moor Street/Snow Hill, which could mean that people were willing to tolerate a slightly longer journey as they could end up closer to where they want to be.

The fact of the matter is that XC's services need more coaches, both for Birmingham-Oxford-Reading and on lots of other parts of their journeys all over the country, so sorting out that problem will be benefit far more people, in far more places, than worrying if a few people can get from Slough to Birmingham on a through train run by GWR.

Yes I agree that XC need more coaches, the problem is you provide them and people will start to use XC more and so they will fill up again. You just need to look at those services that are double length Voyagers which can be just as busy as most people's experiences of XC. As I have pointed out there are other people for whom a direct service would benefit, as the XC paths are not at a convenient time and so it is not just a few people from Slough that would benefit. It also depends on where in Birmingham the services run to and where people are heading.

How many times do I have to repeat the point? Mark Hopwood knows what he is talking about when it comes to London-Oxford-Stratford and its earning potential, notably from the tourist market - which also drives GWR support for Honeybourne-Stratford reopening, as that would add direct access to stations in the Cotswolds to the mix.

FGW wouldn't even have suggested a resumption of the Stratford service at the aborted franchise bidding round in 2012 if it wasn't confident about making money - with, I repeat, any share of Leamington revenue pretty much incidental in the big picture.

I agree that rail insiders are likely to have a good idea as to what will and will not be profitable, what I was saying was that by being sure of passenger numbers (in that it is fairly easy to identify the numbers of people who join and leave trains which currently run between Oxford and Leamington and not necessarily just those that are travelling between those two points) over a certain section of the network would enable the business model to be fairly accurate for that section. With sections of the route which are not subject to direct services then the model becomes less easy to be so accurate on.

In addition there will be the need to run trains at times which although aren't themselves profitable over part of the route it enables more people to use the service and so potentially makes the overall service more profitable. For instance you may need to run a service at 22:00 from Stratford which doesn't really have enough people using it to justify running it. However by running such a service it could mean that more people use trains earlier in the day and so overall it generates more money than if you didn't do so.

The likely number of GW trains each day, should a Straford service happen in the next few years, wouldn't put much of a dent in XC and Chiltern's income, nor add much passenger capacity in the overall scheme of things - and certainly nothing like what would be delivered by XC simply operating trains of the size that are needed on its services.

Yes I agree that XC need longer trains, but I also think that GWR could start their services sooner than XC could get new trains.

If we assume a 2tph frequency with a 220 and 221 running that is 450 seats per hour. Over a 15 hour operational day that is 6,750 seats between Reading and Banbury. Now if XC double that (so all their services are 9 coaches long formed of a 220 and a 221) then that's 13,500 seats per day.

Compare that with, say, a 3 coach 16x with circa 250 seats running on a 1 train per two hours over the core 12 hours (i.e. 6 services per day) and that's 1,500 seats a day. Which is 22% of the current XC seating capacity or 11% of the suggested potential future seating capacity above. Either way that is a reasonable number of extra seats when the existing XC services are very busy and there is no guarantee that XC will double the number of seats that they provide.
 

coppercapped

Established Member
Joined
13 Sep 2015
Messages
3,339
Location
Reading
If you say so...



Who would use it that isn't able to use services that exist right now? Posts keep going on about Slough and Maidenhead for some reason - never mind that there are perfectly acceptable connections at Reading right now between GWR and XC services all day and little evidence there is some overwhelming unmet demand for through trains.



By marginal time, I meant using time sat in sidings at Oxford, between working back to London - were the infrastructure up the Cotswold Line in place, it would be possible for units on London turns to fit in a trip to Hanborough and back right now, rather being parked for half-an-hour - there may be IET units spare outside the peaks that GWR could use to work a Stratford service - indeed I'm sure that's how it would be done, if DFT permitted it in future



The idea of GWR running trains to Stratford is not with making a loss in mind - as I thought I had indicated by pointing out that Mark Hopwood helped set up the NSE service in the early 1990s, so he probably knows plenty about the potential to make money from such a service.

If he didn't think it would make money, I doubt he would have any interest. Any slice of revenue from Leamington passengers would be largely incidental - the real target market is the large number of coaches carrying tourist between London and Stratford on the M40 at the moment.

Rail has a dismally low share of the market for travel to Stratford - hardly helped by Chiltern's near-complete lack of interest. A high-quality service, marketed properly to the tourist trade, really ought to be a nice little earner.

Very large numbers of overseas visitors (they are the market, not people from Bristol) visit London, Oxford and Stratford, that's why BR developed the service it did in the 1990s and Thames Trains continued it - it was excised by the SRA in one of their 'tidying-up the map' exercises which appears not to have taken any account of why the service was started in the first place and why it didn't use Marylebone.




In the absence of a Western rail link, it is notably difficult to get to plenty more places than Birmingham by train - like the entire GWR network west of Hayes & Harlington...

Cough! There is, of course, the RailAir coach link from Heathrow to Reading which runs at a, mainly, 20 minute frequency. This connects with trains to Birmingham as well as many other points west of Reading.

It's quite well used...
 

coppercapped

Established Member
Joined
13 Sep 2015
Messages
3,339
Location
Reading
But most people try to avoid buses/coaches on rail journeys...

Yes.But this is not a bus journey in the middle of a rail journey - it's a connection from a major airport to the railway system serving the entire country in an arc from Birmingham to Southampton.

The coach service started some 50 years ago (by the erstwhile Thames Valley Traction Co.) and has been running ever since. Even if 'most people' try to avoid it, enough use it to make it worthwhile to operate.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,280
Most services, even those in the peaks, have Oxford as the change point from Slough.

In a word, no - try a journey planner and see where it tells you to change when travelling from Slough - it begins with R... in the other direction there are some services where a change at Oxford is recommended, but not all.

I have never suggested it would be stopping service, however even it were, with the change requiring a broadly 25 minute wait (some as low as 20 some as long as 30) a direct service would have to call at something like 18 additional stations for people to see a 30 minute cut in the journey time over the direct service. Given that there's a maximum of 15 stations between Oxford (the current advised change point) and Birmingham that still would mean that the journey would be quicker.

Here is a quote from your post, No 49 on page 4

If it replaces an existing semi fast Oxford terminator than it wouldn't need an extra path out of London and wouldn't require a lot more rolling stock.

Whatever happens in future east of Reading, GWR semi-fasts will still be calling at all the stations between Reading and Didcot, and then one, two or all three of the stations between Didcot and Reading.

In the context of the various services running between London, Reading and Oxford, those most certainly are the stopping (and slower) trains. East-West services could perhaps pick up the smaller stops once they start operating but making all those calls wouldn't exactly make EWR services that attractive either to people wanting to travel between Reading and Milton Keynes, for example.

The problem is that often the XC departures from Reading aren't well timed for other connecting services for instance Newbury has a 30 minute wait, North Downs Line has a 25 minute wait and the Waterloo Line has a 30 minute wait.

Perhaps that is because there isn't overwhelming demand to make such journeys, and because from many places on the Waterloo line and key points on the North Downs route, it's quicker to Birmingham via London - and in reality there are a fair few connections at Reading in the order of 10 minutes as well.

Also it should be noted that is assuming that the service was running to Moor Street/Snow Hill, which could mean that people were willing to tolerate a slightly longer journey as they could end up closer to where they want to be.

What if people want to be at New Street to connect to/from somewhere else? The options from Moor Street/Snow Hill are somewhat limited.

Yes I agree that XC need more coaches, the problem is you provide them and people will start to use XC more and so they will fill up again. You just need to look at those services that are double length Voyagers which can be just as busy as most people's experiences of XC. As I have pointed out there are other people for whom a direct service would benefit, as the XC paths are not at a convenient time and so it is not just a few people from Slough that would benefit. It also depends on where in Birmingham the services run to and where people are heading.

How dare people use trains.... that is rather the point of running them, as far as I know. XC services need more capacity all over the place, not just south of Birmingham.

I agree that rail insiders are likely to have a good idea as to what will and will not be profitable, what I was saying was that by being sure of passenger numbers (in that it is fairly easy to identify the numbers of people who join and leave trains which currently run between Oxford and Leamington and not necessarily just those that are travelling between those two points) over a certain section of the network would enable the business model to be fairly accurate for that section. With sections of the route which are not subject to direct services then the model becomes less easy to be so accurate on.

And I repeat, FGW/GWR's interest in Stratford-upon-Avon is about, er, serving Stratford-upon-Avon. Trains may call at Banbury and Leamington on the way but that would be incidental, along with any relief afforded to XC services as a result.

The idea is to bring new traffic to the railways, not worry about existing ones - and you can do some perfectly good modelling by looking at the sheer number of coaches using the M40 between London and Stratford and working out how many of the people on them you could attract by offering a tourist-tailored rail service instead. Get just five or six of those coaches off the road and you would be well on the way to filling something the size of a five-car Class 800.

The number of tourists visiting Stratford each year is apparently lower than in the 1970s, strange though that may seem, and the Shakespeare Line Promotion Group, who probably know what they are talking about, highlight the poor rail service from anywhere except Birmingham as a factor in this decline - and the numbers using rail to reach the town are less than half the national average across other key destinations for tourists.

http://www.shakespeareline.com/downloads/connecting_stratford.pdf

In addition there will be the need to run trains at times which although aren't themselves profitable over part of the route it enables more people to use the service and so potentially makes the overall service more profitable. For instance you may need to run a service at 22:00 from Stratford which doesn't really have enough people using it to justify running it. However by running such a service it could mean that more people use trains earlier in the day and so overall it generates more money than if you didn't do so.

And you could say the same about all sorts of trains all over the country that run now. Chiltern would probably be delighted if someone else would take over operation of the 23.15 'theatre' train from Stratford to Oxford, which is, I think, a truncated relic of the former NSE service.

Yes I agree that XC need longer trains, but I also think that GWR could start their services sooner than XC could get new trains.

If we assume a 2tph frequency with a 220 and 221 running that is 450 seats per hour. Over a 15 hour operational day that is 6,750 seats between Reading and Banbury. Now if XC double that (so all their services are 9 coaches long formed of a 220 and a 221) then that's 13,500 seats per day.

Compare that with, say, a 3 coach 16x with circa 250 seats running on a 1 train per two hours over the core 12 hours (i.e. 6 services per day) and that's 1,500 seats a day. Which is 22% of the current XC seating capacity or 11% of the suggested potential future seating capacity above. Either way that is a reasonable number of extra seats when the existing XC services are very busy and there is no guarantee that XC will double the number of seats that they provide.

How could GWR do it any sooner?

Both franchises are due to be re-let in 2019 or thereabouts. GWR had to fight tooth and nail to get both current orders for Class 802s past the DfT and get the short HSTs for Devon and Cornwall approved and the ministry is now unlikely to approve any more new stock for GW until the new franchise is done and dusted.

With the need to get every Turbo they can to Bristol, to free up 150s for Northern, the DfT is not going to be allowing things like a Stratford or Birmingham service until it has been examined in detail during the franchise bidding.

And if you think people will be queuing up to ride a Turbo between Slough and Birmingham wedged in like sardines in 3+2 seats (which is how the 250-275 seating capacity on a three-car Turbo is delivered), think again. As of January, the semi-fasts will be Class 387s as far as Didcot anyway, so not much use further north.

Cough! There is, of course, the RailAir coach link from Heathrow to Reading which runs at a, mainly, 20 minute frequency. This connects with trains to Birmingham as well as many other points west of Reading.

It's quite well used...

I use it myself, but one thing it ain't is a train. I've had far too many close shaves trying to make flights out of Heathrow early on a weekday morning, courtesy of the congestion on the M4.
 

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
12,025
Location
here to eternity
Railair from Reading is a waste of time - it can take you up to 30 mins just to get out of Reading and onto the M4! By that time you could be at West Drayton on a Reading - Padd stopper for the 350 bus to T5 or a few minutes further on at Hayes and Harlington for the 140 bus to T2/T3.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,892
Railair from Reading is a waste of time - it can take you up to 30 mins just to get out of Reading and onto the M4! By that time you could be at West Drayton on a Reading - Padd stopper for the 350 bus to T5 or a few minutes further on at Hayes and Harlington for the 140 bus to T2/T3.

Why would you get the bus from Hayes when there is Heathrow Connect?
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,343
Railair from Reading is a waste of time - it can take you up to 30 mins just to get out of Reading and onto the M4! By that time you could be at West Drayton on a Reading - Padd stopper for the 350 bus to T5 or a few minutes further on at Hayes and Harlington for the 140 bus to T2/T3.
Actually even quicker already is express from Reading to Paddington, then over to the HEx and back to Heathrow. The coach duration from Reading has got progressively longer as congestion on the M4 has built up; the big motorway widening scheme just starting on this section, which is going to last several years, may actually kill it off.
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
8,348
Location
Herts
Actually even quicker already is express from Reading to Paddington, then over to the HEx and back to Heathrow. The coach duration from Reading has got progressively longer as congestion on the M4 has built up; the big motorway widening scheme just starting on this section, which is going to last several years, may actually kill it off.

My impression , for what it is worth ,is that people who have critical(ish) and expensive flights to board , do the Paddington circulation.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,061
In a word, no - try a journey planner and see where it tells you to change when travelling from Slough - it begins with R... in the other direction there are some services where a change at Oxford is recommended, but not all.

I've tried The Train Line (not that I book tickets through them) and that confirms Oxford as the change point. However, that doesn't make any difference as it doesn't matter which place you change as the time spent waiting is broadly the same.

Here is a quote from your post, No 49 on page 4



Whatever happens in future east of Reading, GWR semi-fasts will still be calling at all the stations between Reading and Didcot, and then one, two or all three of the stations between Didcot and Reading.

In the context of the various services running between London, Reading and Oxford, those most certainly are the stopping (and slower) trains. East-West services could perhaps pick up the smaller stops once they start operating but making all those calls wouldn't exactly make EWR services that attractive either to people wanting to travel between Reading and Milton Keynes, for example.

I said semi fast (i.e. one that doesn't call at all the stations), however I agree that it depends on which service gets extended, but in my defence if you are looking at extending a service you are unlikely to do so to the slow services.

Perhaps that is because there isn't overwhelming demand to make such journeys, and because from many places on the Waterloo line and key points on the North Downs route, it's quicker to Birmingham via London - and in reality there are a fair few connections at Reading in the order of 10 minutes as well.

For many places it could be quicker, but cheaper? However even from Guildford it is broadly the same time (2 hours on mainline services, with no allowance for getting across London, with via Reading including the change time at Reading being 2:35) the point was that there would be a number of places that would benefit because there's a number of trains that have poor connections with XC services.

What if people want to be at New Street to connect to/from somewhere else? The options from Moor Street/Snow Hill are somewhat limited.

Then they use the existing XC services (I don't recall saying that they would be removed, in fact I said they needed to be improved too by being lengthed.

How dare people use trains.... that is rather the point of running them, as far as I know. XC services need more capacity all over the place, not just south of Birmingham.

No argument from me, the point I was making was that there could still be a case for an additional service as well.

And I repeat, FGW/GWR's interest in Stratford-upon-Avon is about, er, serving Stratford-upon-Avon. Trains may call at Banbury and Leamington on the way but that would be incidental, along with any relief afforded to XC services as a result.

The idea is to bring new traffic to the railways, not worry about existing ones - and you can do some perfectly good modelling by looking at the sheer number of coaches using the M40 between London and Stratford and working out how many of the people on them you could attract by offering a tourist-tailored rail service instead. Get just five or six of those coaches off the road and you would be well on the way to filling something the size of a five-car Class 800.

The number of tourists visiting Stratford each year is apparently lower than in the 1970s, strange though that may seem, and the Shakespeare Line Promotion Group, who probably know what they are talking about, highlight the poor rail service from anywhere except Birmingham as a factor in this decline - and the numbers using rail to reach the town are less than half the national average across other key destinations for tourists.

http://www.shakespeareline.com/downloads/connecting_stratford.pdf

The problem with transport modelling is that it rarely perfectly reflects what does happen. Yes it can be fairly close, but there's a risk that something cases people to not do what you expect.

If GWR were "only" interested in the tourist market to Stratford they wouldn't have the train call elsewhere. The point about having it call at other stations is that broaden the appeal of the service and reduce your risk if your model is wrong, with little negative consequences.

How could GWR do it any sooner?

They would only need a few extra units, by my maths 3 to enable an hourly service, whilst XC would only get to about 1 lengthened service every 2 hours on the Manchester to Reading services.

Both franchises are due to be re-let in 2019 or thereabouts. GWR had to fight tooth and nail to get both current orders for Class 802s past the DfT and get the short HSTs for Devon and Cornwall approved and the ministry is now unlikely to approve any more new stock for GW until the new franchise is done and dusted.

With the need to get every Turbo they can to Bristol, to free up 150s for Northern, the DfT is not going to be allowing things like a Stratford or Birmingham service until it has been examined in detail during the franchise bidding.

And if you think people will be queuing up to ride a Turbo between Slough and Birmingham wedged in like sardines in 3+2 seats (which is how the 250-275 seating capacity on a three-car Turbo is delivered), think again. As of January, the semi-fasts will be Class 387s as far as Didcot anyway, so not much use further north.

GWR had to fight hard for the 802's and yet they got them, unlike XC which had got what new trains? Oh yes that's right they rehashed their current fleet to create more 4 coach units so that they could use some otherwise spare end coaches and pressed there HST's into a more intensive timetable.

If GWR needed 3 more 16x's to run an extended service they could use the ones on the North Downs Line and replace them with 769's. Although it wouldn't result in many extra seats it would mean more doors to improve station dwell times and more standing space. At in a few others for the other branch lines and there'd be little need to run 16x's East of Reading. The 769's would likely be fairly quick to bring to service.

Passengers on GWR are used to 3+2 seating and much as it's disliked there are still enough people who would choose to use it over having to stand (which can often be the case on XC services). However, even if you only count 3/5 of the seats (2 on the 3 seat side and 1 on the 2 seat side) then that's still circa 150 seats per service. On a one train or two hours that would still be an increase of 17% over the current number of seats or 9% over what XC could potentially provide if they doubled the number of seats.

If you told most people that another operator was looking to increase capacity over a second of track only run by XC services so that there was an extra 10% of extra capacity over the day and it would be fairly welcome news. Yes there would be questions about why not more and complaints that it wouldn't benefit those services that needed it the most (I.e. those that the person speaking would be using).

If GWR could provide some extra capacity South of Birmingham that would also allow XC to focus on introducing extra capacity elsewhere first before then reaching the point where they have extended all their services.

My guess would be 769's to GWR within 6 months of the start of the franchise whilst new trains would likely be 2 to 3 years off (at least in significant numbers), especially given that the East Midlands franchise will be needing bimodal Intercity trains.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,061
And breathe!!!!!

Gosh! :D

I am breathing, personally I think that there's space for both a Paddington to Birmingham and Paddington to Stratford service by running then alternate hours.

In doing so it would make both services more popular than if only one was run on an every other hour.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,280
I've tried The Train Line (not that I book tickets through them) and that confirms Oxford as the change point. However, that doesn't make any difference as it doesn't matter which place you change as the time spent waiting is broadly the same.

Try National Rail then.

I said semi fast (i.e. one that doesn't call at all the stations), however I agree that it depends on which service gets extended, but in my defence if you are looking at extending a service you are unlikely to do so to the slow services.

The Oxford-London GW route has two types of service, fast and semi-fast, so if you use the semi-fast path for your fantasy train, it has to do the job of the semi-fasts, which means stopping between Reading and Oxford, which won't change any time soon.

For many places it could be quicker, but cheaper? However even from Guildford it is broadly the same time (2 hours on mainline services, with no allowance for getting across London, with via Reading including the change time at Reading being 2:35) the point was that there would be a number of places that would benefit because there's a number of trains that have poor connections with XC services.

There is no guarantee connections would be better with any other service either.

Then they use the existing XC services (I don't recall saying that they would be removed, in fact I said they needed to be improved too by being lengthed.

No argument from me, the point I was making was that there could still be a case for an additional service as well.

So any GW Birmingham service would be of no use whatever to lots of passengers by going to Moor Street - making focusing on achieving better use of the existing XC paths a rather more sensible use of resources.

The problem with transport modelling is that it rarely perfectly reflects what does happen. Yes it can be fairly close, but there's a risk that something cases people to not do what you expect.

And in many cases, modelling on railways has hopelessly underestimated actual demand. But in this case, there is plenty of actual evidence from preparatory work BR did in the 1990s, actual train operations until the mid-2000s, and work FGW/GWR has clearly done since then investigating the London-Oxford-Stratford markets and their potential.

If GWR were "only" interested in the tourist market to Stratford they wouldn't have the train call elsewhere. The point about having it call at other stations is that broaden the appeal of the service and reduce your risk if your model is wrong, with little negative consequences.

You would pretty obviously call at Leamington and Banbury for connectional reasons, but they would not be a fundamental function of the service - is it so hard to grasp that? Some people may use such trains as an alternative to XC but they are not key to the concept.

They would only need a few extra units, by my maths 3 to enable an hourly service, whilst XC would only get to about 1 lengthened service every 2 hours on the Manchester to Reading services.

See below.

GWR had to fight hard for the 802's and yet they got them, unlike XC which had got what new trains? Oh yes that's right they rehashed their current fleet to create more 4 coach units so that they could use some otherwise spare end coaches and pressed there HST's into a more intensive timetable.

But sorting out GWR's rolling stock fleet is key to cascades both internally in GW-land and getting stock to other TOCs. XC's rolling stock isn't.

If GWR needed 3 more 16x's to run an extended service they could use the ones on the North Downs Line and replace them with 769's. Although it wouldn't result in many extra seats it would mean more doors to improve station dwell times and more standing space. At in a few others for the other branch lines and there'd be little need to run 16x's East of Reading. The 769's would likely be fairly quick to bring to service.

Passengers on GWR are used to 3+2 seating and much as it's disliked there are still enough people who would choose to use it over having to stand (which can often be the case on XC services). However, even if you only count 3/5 of the seats (2 on the 3 seat side and 1 on the 2 seat side) then that's still circa 150 seats per service. On a one train or two hours that would still be an increase of 17% over the current number of seats or 9% over what XC could potentially provide if they doubled the number of seats.

If you told most people that another operator was looking to increase capacity over a second of track only run by XC services so that there was an extra 10% of extra capacity over the day and it would be fairly welcome news. Yes there would be questions about why not more and complaints that it wouldn't benefit those services that needed it the most (I.e. those that the person speaking would be using).

If GWR could provide some extra capacity South of Birmingham that would also allow XC to focus on introducing extra capacity elsewhere first before then reaching the point where they have extended all their services.

So in order to relieve short, low-capacity dmus that aren't suitable for long-distance services, you propose using more short, low-capacity dmus that aren't suitable for long-distance services, and would eat up yet more track capacity, rather than making better use of the existing express passenger paths between Reading, Oxford and Birmingham by running longer, higher-capacity trains in them.

XC units aren't confined to specific bits of the network, are they? You can't just get from Oxford to Manchester direct, you can get to Leeds and Newcastle too and more capacity is needed everywhere on that network, end of story.

Nor will Turbos with a 90mph top speed be welcome on the main line east of Reading from the end of next year, nor would their presence make pathing services north of Banbury any easier.

Many passengers on the Cotswold Line, where services are a jumble of HSTs, 180s and Turbos at present, actively avoid Turbos when they can - a trip or two in a crowded 165 between Reading and Birmingham might make people reconsider their dislike of Voyagers.

My guess would be 769's to GWR within 6 months of the start of the franchise whilst new trains would likely be 2 to 3 years off (at least in significant numbers), especially given that the East Midlands franchise will be needing bimodal Intercity trains.

Much of the current glut of new-build trains is due for delivery in 2019 or early 2020 - so there will be a lot of production lines looking for things to do around the time new franchises should be let, with the likelihood lead-in time would be much shorter than you suggest. If 769s are being produced in small batches, on s stop-and-go basis when an order comes in, they aren't going to arrive in too much of a hurry.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,061
Try National Rail then.

I have, it tells me to get off at Reading have the same wait time as if I changed at Oxford, with the added bonus of telling me the platforms which I need to change between. Although I don't get that on The Train Line I know that I don't need to move between platforms, so for many it could be a more attractive change point (perhaps the reason for the difference in suggested change points)

The Oxford-London GW route has two types of service, fast and semi-fast, so if you use the semi-fast path for your fantasy train, it has to do the job of the semi-fasts, which means stopping between Reading and Oxford, which won't change any time soon.

Which is the same for the (currently) fantasy service between London and Stratford. However there are some trains that call at all the stations (which I think of as slow services) and there are some trains that only call at Didcot (which I think of as semi fast).

There is no guarantee connections would be better with any other service either.

Yes there is (well very nearly anyway) in that the GWR service can not run in the same path as the XC service.

So any GW Birmingham service would be of no use whatever to lots of passengers by going to Moor Street - making focusing on achieving better use of the existing XC paths a rather more sensible use of resources.

True, but then it could be of benefit to some passengers for whom New Street isn't ideal. It would also enable those who are traveling to/from Stratford an optional alternate route at times when the GWR service isn't running by changing at stations such as Lapworth, Hatton or Tyseley.

You wouldn't need a very large percentage of the people who occupy standard class (circa 700 seats an hour) in XC to have a reasonable number of people on the new service. 5% of the 2 XC services (assuming 100% standard class seat occupy) would be something like 35 people each way. That's before you tap any new passengers.

Although 35 is something like 1/5 of what you need to make a service viable given how crowded the XC services can get having a choice of 3+2 seating Vs standing on a 2+2 seat train or only being able to sit next to a load/smelly/fat person as that is the last seat on the train is likely to be attractive for some.

Also there's going to be done for whom they arrive at Banbury just after a XC service and are traveling to Reading or Oxford who will just use the new service.

Again that's before any new passengers and is true of the Stratford services too

And in many cases, modelling on railways has hopelessly underestimated actual demand. But in this case, there is plenty of actual evidence from preparatory work BR did in the 1990s, actual train operations until the mid-2000s, and work FGW/GWR has clearly done since then investigating the London-Oxford-Stratford markets and their potential.

Which is why I didn't say that passenger numbers might be too low, I said that the models are likely to be wrong. However, it is always useful to have a known market that benefits your case.

You would pretty obviously call at Leamington and Banbury for connectional reasons, but they would not be a fundamental function of the service - is it so hard to grasp that? Some people may use such trains as an alternative to XC but they are not key to the concept.

It may not be viable to the service making a profit, but it could be key to the service making a good profit.

But sorting out GWR's rolling stock fleet is key to cascades both internally in GW-land and getting stock to other TOCs. XC's rolling stock isn't.

The 802's were mostly to get rid of HST's on the Devon and Cornwall services, as such for those services they could have mostly retained HST's and not impacted on the Mark 3's that are not currently planned to be doing anything.
So in order to relieve short, low-capacity dmus that aren't suitable for long-distance services, you propose using more short, low-capacity dmus that aren't suitable for long-distance services, and would eat up yet more track capacity, rather than making better use of the existing express passenger paths between Reading, Oxford and Birmingham by running longer, higher-capacity trains in them.

I am suggesting using short DMU's to provide extra capacity on services that are unlikely to used by most of their passengers for very long trips, the longest is likely to be Slough to Birmingham, but most would be centred around the Banbury Oxford section. As most of the passengers between London and Oxford would be the same as currently use the service.

XC units aren't confined to specific bits of the network, are they? You can't just get from Oxford to Manchester direct, you can get to Leeds and Newcastle too and more capacity is needed everywhere on that network, end of story.

There are already several XC services that only run in pairs over sections of the total length of the service. As such there could be more of those as a first step. If these were focused on the core they would bring the most benefit. Given you can't provide more capacity everywhere all at once without having trains not in service, then incrementally increasing key sections is the best way.

Nor will Turbos with a 90mph top speed be welcome on the main line east of Reading from the end of next year, nor would their presence make pathing services north of Banbury any easier.

Many passengers on the Cotswold Line, where services are a jumble of HSTs, 180s and Turbos at present, actively avoid Turbos when they can - a trip or two in a crowded 165 between Reading and Birmingham might make people reconsider their dislike of Voyagers.

If the 16x's are that crowded then the service is clearly needed and will be profitable enough to look at other rolling stock during the lifetime of the franchise. It would mean that those who suggested a service to Birmingham where proved right.

In reality, and it was why I talked about 150 passengers sitting in 2+1 configuration on 3+2 seats, the trains are likely to be comfortably loaded and therefore likely to benefit those who stay on the XC services.

However, again whatever is true of the Birmingham services is also true of the Stratford services. As such what rolling stock would be used for that and where are you getting it from?

Much of the current glut of new-build trains is due for delivery in 2019 or early 2020 - so there will be a lot of production lines looking for things to do around the time new franchises should be let, with the likelihood lead-in time would be much shorter than you suggest. If 769s are being produced in small batches, on s stop-and-go basis when an order comes in, they aren't going to arrive in too much of a hurry.

Based on the franchise timetable there's three full month's between the GWR announcement and the franchise starting (assuming announced 31 December and start of 1 April) with no additional reporting period extensions possible, that means any new stock will be a little way off. However it would be possible for supply chains to be preparing for a potential order (i.e. funding out who could supply what and when) so that they were able to move fairly fast once an order was placed.

The thing that is worth noting is that there's a potential additional 11 reporting periods which the SofS could extend the XC franchise into. Potentially pushing new XC trains since time down the line.

The other possibility is that XC it's for the 222's which means waiting for them to finish at the East Midlands franchise before they can be refreshed and then brought into service.

Of course it could even be possible that XC are told to get on with what they've got as it will only be a few years before HS2 drastically changes their market. Likewise HS2 could kill the Stratford tourist market from Paddington.

In that rather than it take 2:10 for a direct service from Paddington that runs every 2 hours it takes up to 2:10 (if you assume a 30 minutes change time from HS2 to Moor Street) from Euston for a service that runs half hourly, and so people opt for the more frequent service so that they can just turn up and go rather than plan when to go.

Of course GWR could opt for a new bimodal or new DMU which is not an Intercity style train, maybe with a 110mph capability. In doing so they could be at the front of a production line.

However all of that is a long way down the line in terms of should there be a Stratford or Birmingham service from Paddington. I think that there should be (both) and that although there could be some people who travelled from London to Birmingham on a Birmingham service it would be a lot less than those who would do so to Stratford. However there would still be enough people making shorter journeys that it would be worth doing, even once HS2 starts to operate.
 

coppercapped

Established Member
Joined
13 Sep 2015
Messages
3,339
Location
Reading
My impression , for what it is worth ,is that people who have critical(ish) and expensive flights to board , do the Paddington circulation.

As I said, there are enough passengers using RailAir to make it viable - this does not mean it's suitable for every journey.

The time required to get out of Reading onto the A3290/A329(M) depends a lot on the traffic and in rush hours can easily be 20 minutes or more - but the schedules allow for this. As Taunton mentioned the forthcoming roadworks on the M4 may well slow traffic up some more but in the past, and on other motorways, all lanes remain open even if there is a 50mph speed limit for a few miles. Even allowing for all of this the actual time difference between travelling via Paddington and taking the coach is not that different - in some cases it depends on which terminal one needs - the coach calls at Terminal 5 first and then the Central Area and the HEx does it the other way round. Elapsed times can be similar.

And, at the moment, the train is not that much more reliable than the road - there have been a horrendous number of infrastructure failures in the Thames Valley over the last few years and the performance statistics for the London Thames Valley and High Speed Services groups are even now less than impressive.

All this is not to defend the RailAir service but to point out that it is definitely not a 'waste of time' - it does fill a need. A better experience would certainly be the proposed Western Rail Access from Slough/Langley direct to Terminal 5, but with NR's current inability to predict and control its costs it may take a while before it is built.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,061
All this is not to defend the RailAir service but to point out that it is definitely not a 'waste of time' - it does fill a need. A better experience would certainly be the proposed Western Rail Access from Slough/Langley direct to Terminal 5, but with NR's current inability to predict and control its costs it may take a while before it is built.

RailAir fills a gap, the one from Woking is equally useful. However being a coach is always going bring the problems that has. I have wondered if RailAir had improved it's frequencies of they would see additional passengers.

However I also agree that we should get on with building both the Western and Southern Approaches to Heathrow as that would make it significantly easier to get to Heathrow and (in the case of the Southern Approach) make a huge difference in North South journey options between the SWML and GWML with score to connect to HS2 services without going via zone 1 and using the tube.

When the Western Approach is built it would be good if it were possible to run services from Heathrow to Banbury (or at the very least Oxford) as that would reduce the number of people having to make a change between trains at Reading. As Reading is so big that changing there can be for some a little daunting. Whilst Oxford or Banbury would most likely be a change by staying on the same platform or moving to one of only a handful of others.
 
Status
Not open for further replies.

Top