I`m not talking about the slower sections of route where the trains were not designed to run at 125mph. I`m talking about the whole fiasco around the electrification issue. No difficult concept there. Yes things will pick up eventually once electrification (whenever that will be) is complete.
But the electrification fiasco has little to do with the train, other than the fact the 800 has enough flexibility to get Network Rail and Dft out of the S***, as for things picking up once electrification is complete, I would imagine that now being able to work to Didcot on Electric will be a significant benefit.