Interesting that the DfT specification specified a 75 minute London to Bristol journey time inclusive of 5 stops in Electric mode but excluding dwell time, recovery time, performance allowances etc. The current timetable seems to average out at 85.5 or 86.5 minutes running time, plus 9.5 minutes dwell time and 9 minutes of additional time for engineering, pathing and performance allowances. That seems to suggest IET has to achieve a time saving of almost 2 minutes per section based on traction and braking. Greater time savings would come on the 125mph sections - Paddington to Reading, Reading to Didcot, Didcot to Swindon and Swindon to Chippenham, and slightly less on the lower speed sections Chippenham to Bath and Bath to Bristol.
So far IET's have demonstrated superior acceleration in electric mode between Paddington and Maidenhead seems to save a minute over HST's, but that still seems to put more onus on superior braking by machine, and drivers needing to brake harder than they would in HST's.