Aye aye, Grumpy alert again! You will thoroughly read 318 pages of thread for the answer to your question or I will scold you! ;)

On that note though, I've yet to see a video of the pans going up/down at high speed, but to be fair you'd have to know exactly where it was taking place and be in exactly the right viewpoint at the right time, pretty difficult I imagine!!
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

gwr4090

Member
Joined
9 Nov 2011
Messages
144
The latest edition of Modern Railways implies that the Class 800 bimodes for GW are to have their diesel engines uprated. I have not read about this elsewhere, and I wonder if this will make the power output the same as the Class 802s ? Presumably this is a consequence of the the deferment of electrification to Swansea and elsewhere ?

David
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
The latest edition of Modern Railways implies that the Class 800 bimodes for GW are to have their diesel engines uprated. I have not read about this elsewhere, and I wonder if this will make the power output the same as the Class 802s ? Presumably this is a consequence of the the deferment of electrification to Swansea and elsewhere ?
David

No, it's as a result of late wiring, particularly to Bristol Parkway and Box (the 125mph stretches).
It's the engine management system that is being changed to allow full power, the maximum power was always the same as the 802s.
Plus all the intended GW 801 electrics are being built as bi-modes.
None of this is new, unless something different has been decided.
It's about 6 months since DfT made the upgrade decision, based on NR wiring delays.
 

D1009

Established Member
Joined
22 Feb 2012
Messages
3,166
Location
Stoke Gifford
I've yet to see a video of the pans going up/down at high speed, but to be fair you'd have to know exactly where it was taking place and be in exactly the right viewpoint at the right time, pretty difficult I imagine!!
Not necessarily, the pans are likely to be raised and lowered in roughly the same places, but whether the places are overlooked by a position from which you can video them is a different matter entirely.
 

spark001uk

Established Member
Joined
20 Aug 2010
Messages
2,385
Azuma at Pad just now, working 5X60 to Swindon.
 

Attachments

  • Screenshot_20170727-213444.jpg
    Screenshot_20170727-213444.jpg
    134.9 KB · Views: 207

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,575
Location
Croydon
Azuma at Pad just now, working 5X60 to Swindon.

Nice photo of 800101, I happened to be there as it arrived. Noted it left with the diesel engines running. Quite quiet - unless it was not on full power. Is it just me or are the numbers hard to find/see ?.
 

richieb1971

Established Member
Joined
28 Jan 2013
Messages
2,047
Are class 800's going to be a prominent in the UK as HST's are now?

It seems all inter city traffic will be done via these units on heritage lines.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,589
Location
Scotland
Not necessarily, the pans are likely to be raised and lowered in roughly the same places, but whether the places are overlooked by a position from which you can video them is a different matter entirely.
Let's say it takes 5 seconds to raise/lower the pan. At 125mph you cover almost 300m in that time, making it quite difficult to get a decent video from a fixed location.
 

83G/84D

Established Member
Joined
28 Oct 2011
Messages
6,143
Location
Cornwall
It would seem that the Class 800's start on the GWML on 16th October. Initially 4 sets (2 coupled together) on 2 diagrams and then a further 4 sets on 2 diagrams from 13th November.

Saturday diagrams start later on 28th October (4 sets) & 18th November (4 sets) and Sunday workings the days after the Saturday one's start.
 
Last edited:

D1009

Established Member
Joined
22 Feb 2012
Messages
3,166
Location
Stoke Gifford
Let's say it takes 5 seconds to raise/lower the pan. At 125mph you cover almost 300m in that time, making it quite difficult to get a decent video from a fixed location.
A 10 car set is 260m long, so if you had a decent vantage point, you should be able to get one or the other pans being raised or lowered.
 

Bornin1980s

Member
Joined
4 Apr 2017
Messages
720
Okay, am I right? The video shows two units, each with one pan up and one pan down. Now, is it that both driving cars have a pantograph and an a.c. transformer? If so, can one pantograph supply both, or does it run with one transformer dead?
 

coppercapped

Established Member
Joined
13 Sep 2015
Messages
3,315
Location
Reading
Okay, am I right? The video shows two units, each with one pan up and one pan down. Now, is it that both driving cars have a pantograph and an a.c. transformer? If so, can one pantograph supply both, or does it run with one transformer dead?

There is a 25kV bus line throughout each unit. Electricity is supplied to all the transformers from one pantograph.
 

Typhoon_93

Member
Joined
29 Oct 2012
Messages
255
Location
Newton Aycliffe
Does anyone know or can confirm what the 4th GWR Green (unbranded) IEP is at Doncaster

2 x 5 cars (802001/8xxxxx)
2 x 9 cars (800302/800303)

Thanks Gareth.
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,126
A run is being made today, 31st July, 2017 from Stoke Gifford (Bristol) to Swansea. See Real Time Trains for schedules. It is 2x5 units in Hitachi light grey.
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Is that becoming the norm now for any electric unit to be in effect two half sets coupled together?

No it isn't. AFAICT the 5 car IEP is still a single unit with two pans. Nothing has changed with normal length EMUs such as 387s or 707s as examples, and I expect the 4 car 710 will be 'normal' layout.

Obviously longer fixed formation sets such as 700s and 345s have adopted this 'half train' concept - but it will be interesting to see what happens with the 6 car 717 for GN. When that arrives, will it have one or two pans?
 

ExTankieAaron

Member
Joined
24 Apr 2014
Messages
123
802002 is your missing number pal.

Each unit needs one pan up. a 10 car cannot run on one as the 25kv dose not pass through the coupler. Unless it's s rescue and the 2nd 5 is dead.
That set up of one up on each end is default from TMS but the driver can choose what pans to use for instance one has a fault etc.
 

D1009

Established Member
Joined
22 Feb 2012
Messages
3,166
Location
Stoke Gifford
A run is being made today, 31st July, 2017 from Stoke Gifford (Bristol) to Swansea. See Real Time Trains for schedules. It is 2x5 units in Hitachi light grey.
Saw that by chance today on its return to Stoke Gifford, it was 800005+800006.
 

leomartin125

Member
Joined
15 Nov 2015
Messages
1,058
Location
North West
800004 and 800003 now safely back at home in North Pole. Working 5X29 to Paddington at 1400 and 5X30 to Tiverton Loop this afternoon. Saw it at Paddington:

https://www.youtube.com/watch?v=UgLHGYlIPgE

May also like to ask, has any driver training occurred on the IET's yet for GWR drivers? This path looks like possible driver training into/out of North Pole to Paddington. It's a 5X however is listed as a GWR service...

http://www.realtimetrains.co.uk/train/P04777/2017/08/02/advanced

And maybe driver training for the entire run from Bristol to Padd?

http://www.realtimetrains.co.uk/train/V24447/2017/08/05/advanced
 