Will the engines need uprating for the Edinburgh section to keep to booked times?
If the OHLE power supply is inadequate, the first resort will be to lower power take-up on electric, not resorting to diesel.
Power restrictions are not unusual on some lines, notably with modern trains on DC sections which have not been upgraded.
I seem to remember the Eurostar class 373s were power-limited on the ECML (that was south of York).
I'm sceptical that 800s will switch diesel power on and off repeatedly (eg Maidenhead-Tilehurst, then on again at Didcot) on the same trip.
Wouldn't you only want to switch once per journey, giving extended periods of diesel/electric running?
Otherwise, why bother to switch diesel off when it will be back on in 20 minutes?
There must be overheads/disadvantages in frequent switching.
TPE will be a rather different proposition with electric at each end and a 50-60 mile diesel gap in the middle (depending on whether wires have reached Stalybridge or not).
I doubt they are going to pan-up for the 2 miles of wiring through Leeds.
I'm also sure someone will be along to disprove all this shortly...