Anyone albe to confirm 800001 002 derailed at North Pole this morning?

There is a photo posted on another forum taken from a passing train showing the end bogies of 800 001 and 800 002 (where the two units are joined together) apparently derailed on points within the depot.

Also today's runs between Reading and Wantage Road/Swindon - which used these units yesterday - do not appear to have taken place, according to RTT.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ExTankieAaron

Member
Joined
24 Apr 2014
Messages
123
There is a photo posted on another forum taken from a passing train showing the end bogies of 800 001 and 800 002 (where the two units are joined together) apparently derailed on points within the depot.

Also today's runs between Reading and Wantage Road/Swindon - which used these units yesterday - do not appear to have taken place, according to RTT.


I don't suppose you might have the picture or the link to see this picture please?

Thanks.

Aaron.
 

leomartin125

Member
Joined
15 Nov 2015
Messages
1,058
Location
North West
There is a photo posted on another forum taken from a passing train showing the end bogies of 800 001 and 800 002 (where the two units are joined together) apparently derailed on points within the depot.

Also today's runs between Reading and Wantage Road/Swindon - which used these units yesterday - do not appear to have taken place, according to RTT.

Sounds quite serious, hopefully this is a one off! I wouldn't be surprised if todays test runs are cancelled, they are set to be operated by both 800001 and 800002, and if they derailed today then I wonder how long it will be before we see them on the mianline again? Could be a while perhaps if this is serious.

Just glad it was within depot premises.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
Sounds quite serious, hopefully this is a one off! I wouldn't be surprised if todays test runs are cancelled, they are set to be operated by both 800001 and 800002, and if they derailed today then I wonder how long it will be before we see them on the mianline again? Could be a while perhaps if this is serious.

Just glad it was within depot premises.



What makes you say it's do with the train?
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
Well what I'm trying to say is trains that derail don't return to the mainline immediately? And anyway, no point speculating, we don't know very much as of yet.


Fair enough, I just wasn't sure as you said I hope it's a one off
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
There is a photo posted on another forum taken from a passing train showing the end bogies of 800 001 and 800 002 (where the two units are joined together) apparently derailed on points within the depot.

Also today's runs between Reading and Wantage Road/Swindon - which used these units yesterday - do not appear to have taken place, according to RTT.

Are the points in North Pole done locally via levers or is there a central signalling panel for the depot?
 

FGW_DID

Established Member
Joined
23 Jun 2011
Messages
3,033
Location
81D & 81E
All Hitachi sites are LOPS

LOPS?? (Local Operated Points & Signalling?)

I think what Space Phoenix was getting at was asking if the points are manually operated from out on the ground i.e by a point lever or controlled from a signalling panel within the depot complex.
 

ExTankieAaron

Member
Joined
24 Apr 2014
Messages
123
LOPS?? (Local Operated Points & Signalling?)

I think what Space Phoenix was getting at was asking if the points are manually operated from out on the ground i.e by a point lever or controlled from a signalling panel within the depot complex.

Oh yeah sorry, they are all done by a computer system provided by bombardier.

Aaron.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,614
Location
Hampshire
We're surely not blaming Bombardier for the derailment are we?

Not really, I think we're just amazed that Bombardier has managed to produce a fully working signalling system for albeit a small part of London at Last. I just hope it doesn't contain any of their infamous buttons though :lol:

Going back to the 800s, GWR posted another 2 pics on Facebook of their fully painted and assembled 802s on the back of lorries in some docks this morning.
 

FGW_DID

Established Member
Joined
23 Jun 2011
Messages
3,033
Location
81D & 81E
Oops! :oops::oops:

5X27 Wantage Rd - North Pole has caused some chaos at Reading on the flyover today:

Lost one pantograph and caused damage to the OLE!

Up main closed for rest of day. :(
 

D1009

Established Member
Joined
22 Feb 2012
Messages
3,166
Location
Stoke Gifford
Oops! :oops::oops:

5X27 Wantage Rd - North Pole has caused some chaos at Reading on the flyover today:

Lost one pantograph and caused damage to the OLE!

Up main closed for rest of day. :(
I didn't realise the OLE on the flyover was available for use?
 

FGW_DID

Established Member
Joined
23 Jun 2011
Messages
3,033
Location
81D & 81E
I didn't realise the OLE on the flyover was available for use?

It's not :roll::oops::lol::(

Sounds like the pan was left up a bit longer then it should. Incident occurred closer to Tilehurst but train came to a stop on the flyover.
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
Are they/will they be cleared for the Greenford branch triangle (provided that the triangle isn't severed by CrossRail) for enough distance for the triangle to be used to turn units?
 

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,375
Location
Calder Valley
It's not :roll::oops::lol::(

Sounds like the pan was left up a bit longer then it should. Incident occurred closer to Tilehurst but train came to a stop on the flyover.

It really has not been a great week has it?
Derailing and now this....
Sam
 

leomartin125

Member
Joined
15 Nov 2015
Messages
1,058
Location
North West
Same units apparently :oops:

When heading home from a conference in Bristol, I saw 800002 and 800001 at Reading in P15 whilst waiting for the 1603 to Paddington. They were on diesel power, which makes sense since despite the wires being up on P15, they aren't actually turned on. Didn't know they were doing OLE tests, thought it would just be diesel tests. Also suprised it was those units, especially after the derailment at North Pole. They must be cursed, as something bad always occurs when they are in question.
 

455driver

Veteran Member
Joined
10 May 2010
Messages
11,329
When heading home from a conference in Bristol, I saw 800002 and 800001 at Reading in P15 whilst waiting for the 1603 to Paddington. They were on diesel power, which makes sense since despite the wires being up on P15, they aren't actually turned on. Didn't know they were doing OLE tests, thought it would just be diesel tests. Also suprised it was those units, especially after the derailment at North Pole. They must be cursed, as something bad always occurs when they are in question.

They had arrived on the up fast over the flyover on electric power, unfortunately the overhead wires are not in place, you can work the rest out for yourself! :lol:
 

spark001uk

Established Member
Joined
20 Aug 2010
Messages
2,385
Has any testing on the existing heathrow-padd wires taken place yet? I remember someone on here saying a few weeks back they were only cleared for diesel on the section?
Any particular reason they started testing under the new wires before the existing?
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,523
They can test IET on Mk3 OHL equipment much less disruptively on the ECML.

THre testing under the new wires is to validate the testing undertaken at Old Dalby on Series 1 OHL.
 

Nippy

Member
Joined
13 Aug 2013
Messages
740
Yes they have run on electric between Padd and Airport Jn. They did last week during the day.
 

DY444

Member
Joined
16 Sep 2012
Messages
138
There are whispers that IEPs might not be authorised to use electric power north of Newcastle or if they are authorised they might be subject to speed and/or power restrictions on that section. Reason being that planned power upgrades have been shelved. There are also related whispers that VTEC have been asked to look at life extension of their HSTs.

Might all be nonsense of course ...
 