As it is 30 more trains (less the 5 for hull trains), rather than the worst case assumption I had made i my point about there being a follow on order (which the Voyagers never had), makes the likelihood of lots of full trains running around even less likely than some posters have feared.
As Hull Trains are an Open Access operator surely they will not be able to avail themselves of these options ? Or am I not understanding something ? I would have thought the options are available to the DFT for various franchises and the DFT has no say in what Open Access operators run.