• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

GWR Class 800

Status
Not open for further replies.

Darandio

Established Member
Joined
24 Feb 2007
Messages
11,127
Location
Redcar
It wasn't all roses though, certainly on the Western Region and took some time to all settle down. All sounds very familiar.

But then as popular as they were immediately and with the intense scrutiny around them, it's nothing to compare with the goldfish bowl these new trains are in.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
11,950
Location
here to eternity
It wasn't all roses though, certainly on the Western Region and took some time to all settle down. All sounds very familiar.

But then as popular as they were immediately and with the intense scrutiny around them, it's nothing to compare with the goldfish bowl these new trains are in.

Unfortunately there are many who have had it in for these trains from the beginning and will seize upon every single incident as proof in their view that they should never have been built!
 

CMRail

Member
Joined
3 Sep 2018
Messages
163
Location
Gloucester
Better than IEP.

Didn’t give passengers a shower from the aircon on launch day. I could go on...

Gosh that’s a never ending problem.. happens daily.

Go on. Explain how you compare the two. The fact your username is a HST suggests that any successor of the HST would be a problem for one.
 

Thunderer

Member
Joined
29 Nov 2013
Messages
458
Location
South Wales
HSTs. Perfect Introduction.
I do recall the HST's had a few teething problems on introduction back in 1976, but I don't recall a frequent catalogue of more prominent problems that the 800/802 fleet have experienced, and very rarely a complete train failure such that happened in Bridgend today and Exeter a week or so ago. The pioneer run of the HST in service in October 1976 between Paddington and Bristol was fault free and even arrived a few minutes early. Compare that to 16th October last year when the 06:00 Bristol TM - Paddington pioneer 800 run made the headlines for arriving very late and giving some of its passengers an on board cold shower. In 40 years plus I have rode on HST's up to Edinburgh, down to Penzance and frequently to/from London and South Wales and I have never once been on one that failed completely (some did run with one power car, but I got to my destination). My second ride on an 800 at Swansea never left the station due to "an on-board electrical fault" - I never did find out exactly what the fault was as the staff or the fitters didn't seem to want to elaborate, but I had to wait another hour for a HST service which ran with no issues. It goes to show, new is not always better and for the vast amount of money spent building this new fleet of trains, we should not be experiencing frequent problems that cause trains to go out of service.
 

CMRail

Member
Joined
3 Sep 2018
Messages
163
Location
Gloucester
I do recall the HST's had a few teething problems on introduction back in 1976, but I don't recall a frequent catalogue of more prominent problems that the 800/802 fleet have experienced, and very rarely a complete train failure such that happened in Bridgend today and Exeter a week or so ago. The pioneer run of the HST in service in October 1976 between Paddington and Bristol was fault free and even arrived a few minutes early. Compare that to 16th October last year when the 06:00 Bristol TM - Paddington pioneer 800 run made the headlines for arriving very late and giving some of its passengers an on board cold shower. In 40 years plus I have rode on HST's up to Edinburgh, down to Penzance and frequently to/from London and South Wales and I have never once been on one that failed completely (some did run with one power car, but I got to my destination). My second ride on an 800 at Swansea never left the station due to "an on-board electrical fault" - I never did find out exactly what the fault was as the staff of the fitters didn't seem to want to elaborate, but I had to wait another hour for a HST service which ran with no issues. It goes to show, new is not always better.
In thirty years time, will people be criticising the IET replacement? Yes is the answer, and people will continue to do so until necessary.
 

Thunderer

Member
Joined
29 Nov 2013
Messages
458
Location
South Wales
Unfortunately there are many who have had it in for these trains from the beginning and will seize upon every single incident as proof in their view that they should never have been built!
i certainly kept an open mind until I took a handful of journeys on the 800. People will agree, people will disagree, but I conclude they are an uncomfortable, poor replacement for the HST.
 

Val3ntine

Member
Joined
29 Apr 2015
Messages
404
Location
London
I never understand these critisms of new trains, do people seriously want trains like the HST to just run for the indefinite and never be replaced? I understand their sentiment but surely deep down people realise they have to be replaced right?
 

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,990
I do recall the HST's had a few teething problems on introduction back in 1976, but I don't recall a frequent catalogue of more prominent problems that the 800/802 fleet have experienced, and very rarely a complete train failure such that happened in Bridgend today and Exeter a week or so ago. The pioneer run of the HST in service in October 1976 between Paddington and Bristol was fault free and even arrived a few minutes early. Compare that to 16th October last year when the 06:00 Bristol TM - Paddington pioneer 800 run made the headlines for arriving very late and giving some of its passengers an on board cold shower. In 40 years plus I have rode on HST's up to Edinburgh, down to Penzance and frequently to/from London and South Wales and I have never once been on one that failed completely (some did run with one power car, but I got to my destination). My second ride on an 800 at Swansea never left the station due to "an on-board electrical fault" - I never did find out exactly what the fault was as the staff or the fitters didn't seem to want to elaborate, but I had to wait another hour for a HST service which ran with no issues. It goes to show, new is not always better and for the vast amount of money spent building this new fleet of trains, we should not be experiencing frequent problems that cause trains to go out of service.

We didn't have Forums like this forty years ago so we didn't hear about incidents unless someone we knew was involved or the magazines happened to report them.
 

CMRail

Member
Joined
3 Sep 2018
Messages
163
Location
Gloucester
I never understand these critisms of new trains, do people seriously want trains like the HST to just run for the indefinite and never be replaced? I understand their sentiment but surely deep down people realise they have to be replaced right?

Yes they do. The issue with the 800 introduction is the whole project of the GWML modernisation programme being delayed, cancelled and stuff. If all went well they would have had a better introduction of no 5 vice 10s. Hitatchi are running around like olympians at the moment trying to fix these trains. And in a decade they will be a lot better, or still bad. If in 2 or so years time these trains are still faulty then they are up for criticism.

People bringing up the air conditioning are not supporting an argument, people are all for the HST, where as I have respect for both. Some people do not live on the GWR network and have traveled once or twice. Travel 2 or 3 times a week on hour long journeys. They are an improvement. Yes there isn’t a power care at the front but what train is going to be practical into the 2030s?!
 

CMRail

Member
Joined
3 Sep 2018
Messages
163
Location
Gloucester
On the GW Passengers Forum they are supporting points and balancing arguments. Here, people are picking on events that happen less often now.
 

Thunderer

Member
Joined
29 Nov 2013
Messages
458
Location
South Wales
I never understand these critisms of new trains, do people seriously want trains like the HST to just run for the indefinite and never be replaced? I understand their sentiment but surely deep down people realise they have to be replaced right?
Of course HST's can not go on for ever, nothing can and its not about sentiment. Take a long hard look at how successful the HST has been over 40+ years and its popularity with most passengers. It is a very successful design. The basic concept of that successful design should have been used to design a HST 2 for the 21st century.
 

Darandio

Established Member
Joined
24 Feb 2007
Messages
11,127
Location
Redcar
We didn't have Forums like this forty years ago so we didn't hear about incidents unless someone we knew was involved or the magazines happened to report them.

Add in that terrible affliction known as assisted rose tinted vision as well.

Plenty of failures in the early days, stock substitutions all over the place and constant head scratching to figure out the best way forward with the engines. But they worked hard and got it right, the rest is history and it's this history that people cherry pick from.
 

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,990
Of course HST's can not go on for ever, nothing can and its not about sentiment. Take a long hard look at how successful the HST has been over 40+ years and its popularity with most passengers. It is a very successful design. The basic concept of that successful design should have been used to design a HST 2 for the 21st century.

What do you mean by 'the basic concept'?

Using mainly established railway technology?
Having a loco at each end (only done because one big one would be to heavy I think) and unpowered trailers in between?
Diesel power?
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
Better than IEP.

Didn’t give passengers a shower from the aircon on launch day. I could go on...

HSTs, still giving passengers a free sauna this summer when the air conditioning broke down during the heatwave, almost 42 years after being introduced...
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,746
Gosh that’s a never ending problem.. happens daily.

Go on. Explain how you compare the two. The fact your username is a HST suggests that any successor of the HST would be a problem for one.
The HST fleet should have been retired 8-10 years or so ago. That way the re-engineering costs would have been saved - they were effectively a 10 year sticking plaster on them.

I call it as I see it. If IEP had delivered a train that improved on what went before, then I would say so. But it hasn’t. It has delivered something worse - and I’m ignoring the teething troubles.
 

cactustwirly

Established Member
Joined
10 Apr 2013
Messages
8,407
Location
UK
The HST fleet should have been retired 8-10 years or so ago. That way the re-engineering costs would have been saved - they were effectively a 10 year sticking plaster on them.

I call it as I see it. If IEP had delivered a train that improved on what went before, then I would say so. But it hasn’t. It has delivered something worse - and I’m ignoring the teething troubles.

Agreed, they would be amazing if they were based on a Siemens product built in Simmering and Maribor...
 
Last edited:

irish_rail

On Moderation
Joined
30 Oct 2013
Messages
4,511
Location
Plymouth
But the point remains. The seating is horrendous for many people. A 2 hour journey on an 802 today has ended with severe back ache for me and my travelling colleague. It is very difficult to argue they are an improvement on HST when it comes to passenger comfort.
 

Thunderer

Member
Joined
29 Nov 2013
Messages
458
Location
South Wales
What do you mean by 'the basic concept'?

Using mainly established railway technology?
Having a loco at each end (only done because one big one would be to heavy I think) and unpowered trailers in between?
Diesel power?
The successful concept of just one train (not units joined together) of fixed formation with no under-floor engines with open and comfortable coaches. It was a government vanity project to embark on mass electrification, only to end up running vastly over budget, drastically late and to not finish the job as intended. Add into that a very expensive and complex Agility managed fleet of expensive,over complicated trains of various lengths and no wonder its not going smoothly. Should have stuck to diesel, built a new fleet closely based on the successful HST design with fuel efficient diesel engines with more capacity coaches, closely based on the mk III design with retention tanks and at seat sockets and wi-fi. Hey presto, a cheaper, ready to go modern train (with the minimum of distruption from unnecessary electrification work) that passengers would like, saving the tax payers billions of pounds that could be better spent elseshere, such as the NHS or education. After all, a fleet of 802's will be working Paddington to Penzance working just 52 miles under the wires to Newbury, so what is the point of having an expensive bi-mode train for this? Totally pointless.
 
Last edited:

Thunderer

Member
Joined
29 Nov 2013
Messages
458
Location
South Wales
But the point remains. The seating is horrendous for many people. A 2 hour journey on an 802 today has ended with severe back ache for me and my travelling colleague. It is very difficult to argue they are an improvement on HST when it comes to passenger comfort.
Exactly, they are worse for passenger comfort and as its designed specifically for carrying passengers, it is relatively safe to conclude that the IEP project is not an improvement - its a de-improvement.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Any idea what IEP was stopped at Bridgend this morning working the 07:29 Swansea - Paddington? Faulty air conditioning apparently? Coaches full of smoke and the fire brigade was called, passengers evacuated onto the platform.

The units are here - ECS to North Pole
 

bastien

Member
Joined
14 Aug 2016
Messages
427
The successful concept of just one train (not units joined together) of fixed formation with no under-floor engines with open and comfortable coaches. It was a government vanity project to embark on mass electrification, only to end up running vastly over budget, drastically late and to not finish the job as intended. Add into that a very expensive and complex Agility managed fleet of expensive,over complicated trains of various lengths and no wonder its not going smoothly. Should have stuck to diesel, built a new fleet closely based on the successful HST design with fuel efficient diesel engines with more capacity coaches, closely based on the mk III design with retention tanks and at seat sockets and wi-fi. Hey presto, a cheaper, ready to go modern train (with the minimum of distruption from unnecessary electrification work) that passengers would like, saving the tax payers billions of pounds that could be better spent elseshere, such as the NHS or education. After all, a fleet of 802's will be working Paddington to Penzance working just 52 miles under the wires to Newbury, so what is the point of having an expensive bi-mode train for this? Totally pointless.
If it's all about a 'tried and tested' design, ten years ago you'd be talking about a big order of Voyager/Meridian DMUs. Wouldn't that have been lovely?
 

Dave1987

On Moderation
Joined
20 Oct 2012
Messages
4,563
Interesting how MR mag Roger Ford was anticipating these trains breaking all records for reliability if the hype from politicians and like were to be believed. ‘State of the art’, ‘ultra reliable’, ‘vast improvement in reliability, speed and comfort’. All phrases used along with the fanfare for their arrival. Now if one compares the hype to reality their introduction has been a disaster. They have made to national news several times for spectacular failures. I seem to remember lots of comments about no IET will leave Paddington as a 5 car. That lasted about 5 minutes. These trains were designed used CAD & CFD which were not available when the trains they replaced were designed so one would damn well expect them to be breaking records from introduction. People trying to defend the introduction need to take the rose tinted glasses off. You favourite trains have been in the national news a few times for spectacular failures, that cannot be considered a success however you try and spin it.
 

cactustwirly

Established Member
Joined
10 Apr 2013
Messages
8,407
Location
UK
The successful concept of just one train (not units joined together) of fixed formation with no under-floor engines with open and comfortable coaches. It was a government vanity project to embark on mass electrification, only to end up running vastly over budget, drastically late and to not finish the job as intended. Add into that a very expensive and complex Agility managed fleet of expensive,over complicated trains of various lengths and no wonder its not going smoothly. Should have stuck to diesel, built a new fleet closely based on the successful HST design with fuel efficient diesel engines with more capacity coaches, closely based on the mk III design with retention tanks and at seat sockets and wi-fi. Hey presto, a cheaper, ready to go modern train (with the minimum of distruption from unnecessary electrification work) that passengers would like, saving the tax payers billions of pounds that could be better spent elseshere, such as the NHS or education. After all, a fleet of 802's will be working Paddington to Penzance working just 52 miles under the wires to Newbury, so what is the point of having an expensive bi-mode train for this? Totally pointless.

The HSTs aren't fit for purpose anymore, that's why IETs were needed.
The electrification also stretches all the way to Cardiff, and Chippenham, basically all the stretches above 100mph.
The IETs should have been excellent trains, however the execution is lacking.
 

cactustwirly

Established Member
Joined
10 Apr 2013
Messages
8,407
Location
UK
Interesting how MR mag Roger Ford was anticipating these trains breaking all records for reliability if the hype from politicians and like were to be believed. ‘State of the art’, ‘ultra reliable’, ‘vast improvement in reliability, speed and comfort’. All phrases used along with the fanfare for their arrival. Now if one compares the hype to reality their introduction has been a disaster. They have made to national news several times for spectacular failures. I seem to remember lots of comments about no IET will leave Paddington as a 5 car. That lasted about 5 minutes. These trains were designed used CAD & CFD which were not available when the trains they replaced were designed so one would damn well expect them to be breaking records from introduction. People trying to defend the introduction need to take the rose tinted glasses off. You favourite trains have been in the national news a few times for spectacular failures, that cannot be considered a success however you try and spin it.

They have a few teething problems, which all new trains have.
The HSTs have had their day, and something new is needed, unfortunately the execution of the IETs isn't exactly what we wanted, but if you ignore the seats they are still very good trains.

Ideally we would have a UK version of the RailJet trains (these are really good trains, dare I say they are much better than the HSTs)
 

CMRail

Member
Joined
3 Sep 2018
Messages
163
Location
Gloucester
If it's all about a 'tried and tested' design, ten years ago you'd be talking about a big order of Voyager/Meridian DMUs. Wouldn't that have been lovely?

They have a few teething problems, which all new trains have.
The HSTs have had their day, and something new is needed, unfortunately the execution of the IETs isn't exactly what we wanted, but if you ignore the seats they are still very good trains.

Ideally we would have a UK version of the RailJet trains (these are really good trains, dare I say they are much better than the HSTs)

Dare you say it, it’s the law to not criticise the HST!
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,144
The HSTs aren't fit for purpose anymore, that's why IETs were needed.
The electrification also stretches all the way to Cardiff, and Chippenham, basically all the stretches above 100mph.
The IETs should have been excellent trains, however the execution is lacking.
Yes, that's the point for me. The HSTs have had their day, but I remember going on one for the first time in 1976 and it had the wow factor, just as the first ICE I went on did. It's a real let down that the passenger facilities and internal decor on the IETs are so mediocre when this train is supposed to be the pride of the high speed fleet.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
Yes, that's the point for me. The HSTs have had their day, but I remember going on one for the first time in 1976 and it had the wow factor, just as the first ICE I went on did. It's a real let down that the passenger facilities and internal decor on the IETs are so mediocre when this train is supposed to be the pride of the high speed fleet.

It wasn't that hard to have a wow factor in 1976 when much of the rest of the railway was being run using Mk1 coaches and first-generation dmus that hadn't seen anything more by way of updates since they were built than a new coat of paint or two.

Time have changed, the railway has to shift way more people about than it did in 1976, so the trains have had to change too.
 
Last edited:

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,144
It wasn't that hard to have a wow factor in 1976 when much of the rest of the railway was being run using Mk1 coaches and first-generation dmus that hadn't seen anything more by way of updates since they were built than a new coat of paint or two.
I was actually comparing with Mk II aircon coaches...
 

FGW_DID

Established Member
Joined
23 Jun 2011
Messages
3,034
Location
81D & 81E
I do recall the HST's had a few teething problems on introduction back in 1976, but I don't recall a frequent catalogue of more prominent problems that the 800/802 fleet have experienced, and very rarely a complete train failure such that happened in Bridgend today and Exeter a week or so ago. The pioneer run of the HST in service in October 1976 between Paddington and Bristol was fault free and even arrived a few minutes early. Compare that to 16th October last year when the 06:00 Bristol TM - Paddington pioneer 800 run made the headlines for arriving very late and giving some of its passengers an on board cold shower. In 40 years plus I have rode on HST's up to Edinburgh, down to Penzance and frequently to/from London and South Wales and I have never once been on one that failed completely (some did run with one power car, but I got to my destination). My second ride on an 800 at Swansea never left the station due to "an on-board electrical fault" - I never did find out exactly what the fault was as the staff or the fitters didn't seem to want to elaborate, but I had to wait another hour for a HST service which ran with no issues. :lol:It goes to show, new is not always better and for the vast amount of money spent building this new fleet of trains, we should not be experiencing frequent problems that cause trains to go out of service.

Great comparison there. 40 years of travelling on HST which you admit had teething troubles and roughly a handful on 800s which have been in service for just under a year! :rolleyes::rolleyes:

i certainly kept an open mind until I took a handful of journeys on the 800. People will agree, people will disagree, but I conclude they are an uncomfortable, poor replacement for the HST.

Open mind o_O:lol::lol:
 
Status
Not open for further replies.

Top