The proposed Basingstoke to Manchester via East West Rail service which the Western Route Study draft anticipates in 2019 has the following stock options as I see it:
Once HS2 opens (2025), some pendolinos may become available. If class 800s were chosen, they could subsequently be cascaded to other Cross Country routes in 2025. Class 800s would not be able to run at 125mph along the WCML unlike options 2, 3 and 7.
I guess that this decision will need to be made for the franchise extension(s) from April 2016 to November 2019.
- New or cascaded 110mph EMUs
- New tilting 125mph EMUs
- New tilting 125mph EDMUs
- New non-tiliting 125mph EMUs (e.g. Class 801)
- New non-tilting 125mph EDMUs (e.g. Class 800s)
- Cascaded electric intercity stock (e.g. Class 90/91s)
- Use 221s with tilt enabled
- Use 220/221/222s with no tilt
Once HS2 opens (2025), some pendolinos may become available. If class 800s were chosen, they could subsequently be cascaded to other Cross Country routes in 2025. Class 800s would not be able to run at 125mph along the WCML unlike options 2, 3 and 7.
I guess that this decision will need to be made for the franchise extension(s) from April 2016 to November 2019.