GWR Cardiff to Bristol on Sunday 25th

Status
Not open for further replies.

sammyg901

Member
Joined
24 Mar 2009
Messages
445
According to the GWR weekly update - there are late notice changes to local services from Cardiff, with a shuttle to/from Bristol instead of the Portsmouth Harbour services and that the times online are now incorrect.

But I can't see anywhere a revised timetable? Or do I have to wait for the systems to be updated - when would this be?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
According to the GWR weekly update - there are late notice changes to local services from Cardiff, with a shuttle to/from Bristol instead of the Portsmouth Harbour services and that the times online are now incorrect.

But I can't see anywhere a revised timetable? Or do I have to wait for the systems to be updated - when would this be?

As it is a new late item, it's possible that plans are still being worked on and timings still being prepared and cannot be published until ratified by Network Rail
 

ValleyLines142

Established Member
Joined
25 Jul 2011
Messages
7,040
Location
Gloucester
At the moment, all Sunday services are running as normal to Portsmouth on Real Time Trains, including the 1008, 1208 and 1635 departures from Cardiff which would normally go to Brighton (hence their 1Oxx headcode instead of 1Fxx).
 

father_jack

Established Member
Joined
26 Jan 2010
Messages
1,557
Big late notice changes Sunday. Rail defect in Patchway tunnel with 5mph TSR causing loads of delays will be repaired. Up line through tunnel shut with limited paths over down line. Up and down trains SWA/CDF- PAD and vv diverted and run via GCR not calling. Some PAD-BRI extended to end BPW and vv. Some shuttles BRI- BPW and vv. CDF-PMH and vv run through SLW.
 
Last edited:

LordCreed

Member
Joined
28 May 2014
Messages
433
Most journeys should now be available on RealTimeTrains. In summary:

CDF - BRI shuttles, with single line working around the defect at Patchway.
PHM - CDF services will terminate short at BRI.
SWA - PAD services divert via Lidney and Kemble non stop.
 