I am just sorting out some photographs taken on November 22 which included several of GWR IET 802012 at Penzance Platform 2 on November 22.

The up end of the unit had the coupler uncovered and was noted to depart empty around 13:26.

I am not sure if it proceeded to Long Rock depot or went somewhere else. I didn't see it when I set off on the later Plymouth bound train.

Had it failed earlier in the day and been uncoupled?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

irish_rail

On Moderation
Joined
30 Oct 2013
Messages
4,529
Location
Plymouth
Of the top of my head i think that one sat at Long Rock for about a week late last month so may have gone straight there.
 
Last edited:

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,275
It got stopped at Long Rock on the 5th for cracks. It eventually got a concession to run ECS to North Pole for welding and was ferried east in stages. You saw it on it’s first stage, departing for Laira.

Since then it has been welded up at North Pole (Hitachi do all the temporary welds there) and is now back in service.
 

John Luxton

Established Member
Joined
23 Nov 2014
Messages
2,041
Location
Liverpool
It got stopped at Long Rock on the 5th for cracks. It eventually got a concession to run ECS to North Pole for welding and was ferried east in stages. You saw it on it’s first stage, departing for Laira.

Since then it has been welded up at North Pole (Hitachi do all the temporary welds there) and is now back in service.
Thanks for the info
 