You do like to moan at every single member on this website don’t you. I never once said that they will change he plans for May, I just asked that what people think the timetable will include (e.g fasts avoiding stations, the Bedwyn services, calls, speed, frequency etc.)
I said a couple of words and you have to make a big deal out of it. I’m not the only one who finds you irritating.
This was your question:
Anyone got any good draft timetable ideas?
That question does not give any indication of any level of detail you might be thinking of, does it?
And we are way beyond the stage of draft ideas going into the GWR 2019 timetable process - hence my response, whether it irritates you or not.
GWR (and other TOCs with an interest) and Network Rail were deep into negotiations about detailed proposed timetables well before the whole process got knocked back. And all the delay does is provides extra time for the timetable negotiating process to be completed, not take it back to the beginning.
I have lost count of the number of times I have posted this link to the GWR presentation, which was given many times in slightly varied forms, way back when in 2015, giving lots of information about the proposed service levels, frequency and all the rest in what was then meant to be the December 2018 timetable - including giving it in this thread on the previous page less than a month ago.
http://travelwatchsouthwest.org/wp-content/uploads/2013/02/Travelwatch-Presentation-October-2015.pdf
I have also attached an earlier extended version of the presentation slides - I can't find it online - which gives more info on services for the Thames Valley region, subject to the usual provisos about delays to electrification, changes of emu type since 2015, Bedwyn through services from Paddington being retained using IETs, etc.
The things mentioned in those presentations are the kind of things that the timetable will include... as has been pointed out on this forum many times for several years now.