GWML Electrification - Construction Start Date?

Status
Not open for further replies.

bf2142

Member
Joined
2 Mar 2011
Messages
8
As a fairly regular user of the FGW service between London and Swindon, I was very pleased to hear that the government has approved electrification. When the project is completed, it will be a major boost for the west of England and south Wales and, fingers crossed, will lead to further electrification between Plymouth and Birmingham.

But my question is: when will we see construction work start?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
I would have thought they would be starting soon. I know the electrification in the north west of england is supposed to be up and running by 2013
 

LexyBoy

Established Member
Joined
23 Jan 2009
Messages
4,478
Location
North of the rivers
But my question is: when will we see construction work start?

Not until I've got my hovercar!

More seriously, even if it does go ahead I wouldn't expect to see any obvious electrification work for a few years - all the preliminary planning will take a while, then there's making enough clearance around bridges, tunnels etc...
 

Daimler

Member
Joined
5 Feb 2009
Messages
1,197
Location
Hertfordshire
I've noticed various bridges between Reading & Oxford being replaced (to the aesthetic detriment of the line, I'm afraid) recently - I'm don't know, however, if this has anything to do with electrification or not.

I do seem to recall reading something about gauge enhancement for larger containers on intermodal trains, but I'm not sure if it referred to this route.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Probably the best paty of a year off, they first have to do the detailed surveys and create proper blueprints for instance which structures to replace, which to move, where to lower the existing track, where the transformers should be located, etc....

Lancs electrification was first announced Dec 2009 and reconfirmed in Nov 2010 and they finished the planning ready to break ground for the first stage (Manchester-WCML) last week.
 

LexyBoy

Established Member
Joined
23 Jan 2009
Messages
4,478
Location
North of the rivers
I've noticed various bridges between Reading & Oxford being replaced (to the aesthetic detriment of the line, I'm afraid) recently - I'm don't know, however, if this has anything to do with electrification or not.

I do seem to recall reading something about gauge enhancement for larger containers on intermodal trains, but I'm not sure if it referred to this route.

Indeed it was to upgrade the line for freight - a lot of intermodal goes via Reading and Oxford on its way to if Midlands - though I imagine the bridges which have been replaced will not need further work if the line is electrified.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,257
Probably the best paty of a year off, they first have to do the detailed surveys and create proper blueprints for instance which structures to replace, which to move, where to lower the existing track, where the transformers should be located, etc....

When the GWML was originally announced under Labour, they started the sites surveys on the GW soon after.

They have been actively working on it in the drawing office for just as long as the NW, according to a chap who was part of it over 12 months ago. The main early effort was to ensure the Reading rebuild allows for electrification - a lot of the drawings for that job had to be reworked as a high priority.

--- old post above --- --- new post below ---

Indeed it was to upgrade the line for freight - a lot of intermodal goes via Reading and Oxford on its way to if Midlands - though I imagine the bridges which have been replaced will not need further work if the line is electrified.

Unless it is physically impossible, the gauge clearance for W10 will also include clearance for OHLE as you suggest.

That has been the policy for bridge replacements for a fairly long time, certainly since BR days.

You often see the clearance increase significantly when footbridges are replaced as well - even in the heart of the third rail area...
 
Last edited:

bf2142

Member
Joined
2 Mar 2011
Messages
8
It's good news to hear that the survey and planning work has already started!

I'm not sure if this is true but I'd read that electrification may have stopped at Bristol as the water ingress into the Severn Tunnel presented a severe risk. Presumably the engineers found a solution to this problem.

On an historical note, when I worked in the engineering dept of the Victoria Line, I got talking to a rail consultant who told me that the reason the GWML had not been electrified already was that there was “resistance to change” from the region. I grew up in the SW so I know the reputation but I was wondering if electrification of the GWML had been proposed before and why it had never come to fruition?
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
On an historical note, when I worked in the engineering dept of the Victoria Line, I got talking to a rail consultant who told me that the reason the GWML had not been electrified already was that there was “resistance to change” from the region. I grew up in the SW so I know the reputation but I was wondering if electrification of the GWML had been proposed before and why it had never come to fruition?
The WR was abolished in 1992. From this time Intercity owned the infrastructure from Paddington to Plymouth until 1994 when Railtrack took over. Railtrack owned the infrastructure until 2002 and then Network Rail form 2002 onwards so that's almost twenty years electtrification could have been done in.
 

starrymarkb

Established Member
Joined
4 Aug 2009
Messages
5,985
Location
Exeter
I'm not sure if this is true but I'd read that electrification may have stopped at Bristol as the water ingress into the Severn Tunnel presented a severe risk. Presumably the engineers found a solution to this problem.

The Alstom engineers who did the survey say the tunnel isn't a problem and is easier then the Bakerloo line between Waterloo and Embankment.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Labour cancelled Midland and decided to do GWML instead, Conservatives reviewed it and decided not to do it either with the next assessment in 5 years time.
 

pablo

Member
Joined
30 Apr 2010
Messages
606
Location
53N 3W The blue planet
The GWR proposed to electrify from Bristol to Penzance before WWII because they thought it would work out cheaper than carting coal down that way. ;)
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Tbh that wouldnt really change anything, it would still be a commuter line in need of electrification with possibly a worse business case than before.
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
Tbh that wouldnt really change anything, it would still be a commuter line in need of electrification with possibly a worse business case than before.
The London commuter part of the line is electrified though.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Exactly, so why electrify the rest if long distance traffic has moved onto HS2?
 

Grumpy

Established Member
Joined
8 Nov 2010
Messages
1,315
Re the comment above "The main early effort was to ensure the Reading rebuild allows for electrification - a lot of the drawings for that job had to be reworked as a high priority."
If that's true it's scandalous. Surely as a matter of course any work on the major trunk routes should have to be designed to facilitate longer term electrification?
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
They are going to look at it depending on what happens with HS2 - it maybe that HS2 will replace the MML to Derby/Nottingham and Sheffield on the way to Leeds and Newcastle

As things stand I don't think HS2 will have stations in Derby, Nottingham or Sheffield. There will probably be an "East Midlands" station and a "South Yorkshire" station, but both outside the relative city centres. No HS2 station at places like Chesterfield either.
 