• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Guard/Fireman operated level crossings

Status
Not open for further replies.

Glenmutchkin

Member
Joined
14 Dec 2011
Messages
617
Location
Scotland
I am having a discussion on an Indian orientated forum with someone who claims that guard operated level crossings are unique to India. By this I ean where the train stops before the crossing and the guard gets down to close the gates for traffic. Once the train is a cross he reopens the gates and gets back on the train.

My guess is that there must be examples on preserved lines here. Can anybody throw any light on this.

Thanks
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

GB

Established Member
Joined
16 Nov 2008
Messages
6,560
Location
Somewhere
They are called trainman operated crossings here. There are some on the sizewell branch.
 

Mvann

Member
Joined
19 Mar 2010
Messages
790
Location
Peterborough
Nene valley railway has a crossing that has to be set by the fireman. I think the stoomcentre at malgdem does as well.
 

james60059

Member
Joined
6 Jul 2006
Messages
874
Location
Hinckley
Going back a bit, I think the Cambridge - St Ives line did too, until it closed in the early 90's. Of course the guided bus way now runs along it :roll:
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
I am having a discussion on an Indian orientated forum with someone who claims that guard operated level crossings are unique to India. By this I ean where the train stops before the crossing and the guard gets down to close the gates for traffic. Once the train is a cross he reopens the gates and gets back on the train.

My guess is that there must be examples on preserved lines here. Can anybody throw any light on this.

Thanks

On the Kent and East Sussex Railway 5 out of our 6 public road crossings are traincrew operated, although some of these are also operated by crossing keepers, station staff or signalmen.



 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,191
Going back a bit, I think the Cambridge - St Ives line did too, until it closed in the early 90's. Of course the guided bus way now runs along it :roll:

Ahem, the Misguided Bustway ;)

One of the many hated things about it are that buses have to slow to 30mph to cross roads. Better than 0mph though!
 

KA4C

Member
Joined
7 Mar 2012
Messages
403
They are called trainman operated crossings here. There are some on the sizewell branch.

Par Bridge crossing, Paignton South TMO barriers, Teingbridge gates, etc, etc
 

tirphil

Member
Joined
27 Jan 2011
Messages
275
Location
Wales
Barmouth and Porthmadog level crossings on The Cambrian coast are both trainman operated despite the introduction of ERTMS.
 

MattRobinson

Member
Joined
16 Apr 2012
Messages
276
Location
Wakefield
At KWVR there are occasional non-public operating days (eg: prep for galas) which require the train-crew to operate the crossings. Otherwise, they're staffed by crossing keepers.
 

p123

Member
Joined
1 Oct 2011
Messages
148
At Kingsknowe on the Glasgow to Edinburgh via Shotts line, the driver always has to press a button while the train has passengers boarding/alighting at the platform to start the barriers on the level crossing. It's always the driver and not the conductor I have noticed.

I've also noticed that the barriers work automagically when East Coast/Virgin/TPE rattle through at however many hundreds of miles per hour.

[Edit]

Sorry I should really have put that in context. This is when a train is travelling from Edinburgh to Glasgow, the level crossing is immediately west of the Glasgow-bound platform.

Glasgow to Edinburgh trains don't have to stop, operate the crossing, then pull into the platform. That'd be silly now.
 
Last edited:

Tiny Tim

Member
Joined
6 Jan 2012
Messages
463
Location
Devizes, Wiltshire.
A few years ago in France, somewhere around Carcasonne, I think, trains routinely stopped for the crews to operate crossing gates. Not TGVs.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,191
So what is the average speed for buses in your area? 30mph is quite a reasonably fast speed for a bus

On the Guided Busway, they go up to 58mph IIRC. Probably to try and make the fuel economy look better. As I said, they have to slow to 30mph at level crossings, but since most are next to stops, this isn't so much of a problem. Had the railway been reinstated, up to 75mph would be possible without slowing for crossings.

This is getting way off topic though!
 

D2022

Member
Joined
9 Aug 2012
Messages
463
Location
Blunsdon
The Swindon & Cricklade have one at Blunsdon for the barrow crossing. A little further down the line there is a crew operated gate to the coaling platform and road/rail spur. During Gala days and such the crossing is usually manned by a member of the Signal and Telecoms dept.
 

507 001

Established Member
Joined
3 Dec 2008
Messages
2,177
Location
Huyton
Most of the AOCLs on the Cambrian are driver operated, not just Barmouth and Port.

Pont Croesor on the WHR is train crew operated (Caernarfon bound) and Britannia bridge (Porthmadog Bound) Electrically released by the signaller]
Penrhyn Crossing is also traincrew operated when there isn't a crossing keeper on duty. Manual gates too, I had the pleasure of closing these just last week at 10:30pm!
 

tirphil

Member
Joined
27 Jan 2011
Messages
275
Location
Wales
Most of the AOCLs on the Cambrian are driver operated, not just Barmouth and Port.

Barmouth and Porthmadog are TMO's. They are the only crossings that traincrew must operate for the passage of every train. Harlech must be operated by traincrew in the up direction only. It is automatic in the down direction.

You are correct in as much as some of the AOCL's and ABCL's have a plunger that the traincrew use in the event of equipment failure. For example Llanbadarn ABCL. However if an AOCL such as Fairbourne fails (or times out) then the traincrew may proceed as long as they carry out the provisions of section 4.4 of module TW8 of The Rule Book.
 
Status
Not open for further replies.

Top