• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

GTR On board recorded announcements, how often do they get updated?

Status
Not open for further replies.

bubieyehyeh

Member
Joined
25 Feb 2016
Messages
380
My local station had it platform extended from 8 to 12 carriage opened about a month ago.
However both thameslink and Southern trains pre-recorded are still warning people they need to be in the front 8 coaches to alight at this station as they approach the station.
There is no need for any announcement now since all 12 coaches fit on the platform.
Any ideas how long before GTR will update the announcements.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

bubieyehyeh

Member
Joined
25 Feb 2016
Messages
380
yes Littlehaven

== Doublepost prevention - post automatically merged: ==

I'm yet to hear the OBS on the Southern Trains do a correcting announcement.
 
Last edited:

PGAT

Established Member
Joined
13 Apr 2022
Messages
2,132
Location
Selhurst
The announcements (at least on Southern) always say the length of the shortest platform
 

bubieyehyeh

Member
Joined
25 Feb 2016
Messages
380
So after the longer platform opened at littlehaven, all 12 coaches doors were opening, but on board announcement continued to say you had to be in first 8 coaches to alight.

Now its changed... two trains I've been on heading south (one last week, one this week) have stopped at Littlehaven and only the front 8 coaches, as per the on board announcements.

Does anyone know what is going on?
 

Javelin_55

Member
Joined
9 Apr 2020
Messages
156
Location
South East
I'm pretty sure the onboard PIS systems have to be individually updated by a fitter (or similar) with a laptop while the unit is stopped on depot. With 55 Thameslink FLUs this will probably take a while.

Not sure about the stopping short though. Odd that it would happen twice too, maybe some issue with the front of the platform? Littlehaven is my local too so will watch out for this. I still get nervous waiting in the rear coach as we pull in!
 

aleggatta

Member
Joined
28 Sep 2015
Messages
565
So, on southern the 377s have an ‘SDO database’ that, as it sounds, is a database of all platforms and the number of cars that are released at each station platform. At stations with multiple platform lengths these generally have to be reinforced with platform beacons to ensure the correct amount of doors are released. No two units with differing SDO databases can work together. Normally the procedure would be for a number of platform modifications to take place, before a large amount of overtime is offered on a weekend, to deploy the update to all the units at all stabling points via laptop and rs232 lead. Control will have a plan of units, where they are due to be stabled, and when they should be updated. This is so that any splitting/joining services are not of mixed software versions. Normally PIS databases are also updated at the same time.
 

bubieyehyeh

Member
Joined
25 Feb 2016
Messages
380
This evening, another southern train heading south only opening the front 8 carriages at littlehaven. So I guessed they are keeping in-sync with on-board automated announcements.
 
Status
Not open for further replies.

Top