• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Grey/Purple Paint On Tracks

Status
Not open for further replies.

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,351
Location
LBK
Hi all

Quick question to satisfy my curiosity. On approach to Euston there are several areas of track which have been sprayed with some sort of paint. It's greyish-purple in colour.

Does anyone know why? I've never seen this before anywhere.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Snap

Established Member
Joined
10 Jun 2005
Messages
3,156
No doubt they will be markings for use by engineers and gangs. That's incredibly vague I know, but it's likely that's what the marks will be for.

Sorry I haven't been more detailed!
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,351
Location
LBK
That is what I suspected. Whole areas have been sprayed rather than individual pieces of track!
 

The Snap

Established Member
Joined
10 Jun 2005
Messages
3,156
Seems quite strange. No chance of it being graffiti? :lol:. Does there seem to be some 'system' to the spray marks?
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,351
Location
LBK
No it's definitely not graffiti. The colour is quite odd and it looks as though it serves a purpose. I can only think they are markers for areas of track that need attention....
 

Hydro

Established Member
Joined
5 Mar 2007
Messages
2,204
I can't think what automatically drops paint now other than Stoneblowers to show the track has been treated.
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,351
Location
LBK
I can't think what automatically drops paint now other than Stoneblowers to show the track has been treated.

Doesn't the NMT drop paint? I think it may be yellow paint though.
 

Hydro

Established Member
Joined
5 Mar 2007
Messages
2,204
No track recording vehicle drops paint any more, it used to be red, earning them the nickname of "Blood Trains".
 

Hydro

Established Member
Joined
5 Mar 2007
Messages
2,204
Most information on what we do and how we do it is painfully out of date or inaccurate!

How has the paint been applied? In streaks down the four foot, continuous lines, individual sleepers...?
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,909
Location
Fenny Stratford
Most information on what we do and how we do it is painfully out of date or inaccurate!

whispers - dont tell them we do things - what else will they have to complain about! :D:D:D
--- old post above --- --- new post below ---
is the paint to mark sections up for removal/replacement? Where is it placed? What section of line - up/down/fast slow? What Location?
 
Last edited:

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,351
Location
LBK
Most information on what we do and how we do it is painfully out of date or inaccurate!

How has the paint been applied? In streaks down the four foot, continuous lines, individual sleepers...?

Looks like it's been sprayed all over the track over an 8 foot stretch. Everything is covered indiscriminately. There seems to be no concentration on sleepers or rails.
 

boing_uk

Member
Joined
18 May 2009
Messages
619
Location
Blackburn
Occasionally, while my brain is switched off and I am drooling and gazing out of the window, I have spotted yellow spray marks, about 3m long, in the four-foot, toward the cess rail and usually at points which I estimate to be where there used to be rail joints in sections of what are now CWR.

Sometimes they are possibly a single rail length apart, sometimes a double length. Most recently I spotted them somewhere between Bolton and Salford, although I have seen them fairly recently I think on the Fylde line as well.

Am I correct to assume that it is some way of highlighting track defects? If so, on CWR, why are they still in rail lengths? Am I also correct in assuming that it is a historical thing in the formation, which is reflected in slightly different behaviour in the ballast at these locations? Or is it the rail itself? I know that the down line between Kirkham and Poulton is partially rail that was welded in-situ, as it can be heard.
 
Status
Not open for further replies.

Top