Green light for over 50 road and rail upgrades

Status
Not open for further replies.

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,350
Mod Note: For discussion about the Midlands Rail Hub please see here, for discussion about Portishead please see here.

Apart from a reference in the Portishead thread I can't see this mentioned yet, it probably needs this header thread and subsidiary ones...
https://www.gov.uk/government/news/...upporting-over-39000-new-homes-and-42000-jobs is a press release, as yet I can't see the document itself.
Quite a few big, little road schemes, a "Midlands Rail Hub" is mentioned in the rail paragraph
The government is also announcing key rail projects across the country, including reinstating a passenger rail line between Bristol city centre and Portishead, which last ran over 60 years ago, delivering 3 brand new train stations, bringing thousands more people closer to a railway and funding a Midlands Rail Hub, creating brand new rail links for more than 50 locations.
but I don't know what that means! It says lower down
In addition, the government is investing a further £27 million to reinstate passenger rail services between Portishead and Bristol city centre. The new hourly services will connect an additional 50,000 people to the rail network and support a significant new housing development.

Two new stations, Wellington and Cullompton, have been given the green light in the south-west of England, unlocking significant new housing developments and providing more chances for people to access Exeter to visit loved ones and benefit from increased leisure, education and employment opportunities. Similarly, a new station at Haxby will now be delivered, bringing an additional 20,000 people within 3 kilometres of the railway, providing easy access to the regional centres of York and Leeds.

The Midlands is also set to see a huge improvement to its rail services. The new Midlands Rail Hub will be the region’s biggest and most ambitious rail improvement scheme to date. Significant government funding will mean huge numbers of additional trains and extra seats can be added to the rail network in and out of Birmingham every single day. This will support new homes and create greener growth across the Midlands while providing faster, more frequent and brand new rail links for more than 50 locations and creating almost 13,000 construction jobs.

Investment will also benefit existing rail users. The East Coast Main Line, which runs the length of the country, is already benefiting from an increase to capacity and frequency and will also receive new, upgraded digital signalling, boosting capability and resilience of the line, and reducing delays by one third. This rollout will support new digital skills in the rail sector and the creation of 4,800 new roles across the supply chain.
so I guess some people here will know what lies behind the summaries.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

duffield

Established Member
Joined
31 Jul 2013
Messages
3,288
Location
East Midlands
Still doesn't solve "The MML mystery".

NR appear to be ploughing ahead with further electrification by pegging out mast locations, removing lineside vegetation and most significantly performing bridge works and track lowering.

Meanwhile there has been no confirmation of further funding from the government beyond the current limit of electrification, and the MML gets no mentions at all in any infrastructure announcement.

This announcement leaves us none the wiser.

So we wait and scratch our heads.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,923
Location
Mold, Clwyd
Some of the money will go to Wales, notably the Padeswood project and increases in train frequency in North Wales.
Delivering the upgrade at Padeswood will bring real economic benefits, helping the cement works and improving connectivity between Wrexham and Liverpool, increasing services to two trains per hour.
“It was fantastic to hear the UK Government’s commitment to this project, which campaigners have pushed for over many decades. Two governments, working in partnership, will deliver this key part of the Network North Wales.
Network North Wales is about delivering an integrated, high-frequency public transport network, connecting people to jobs, opportunity, community and a better quality of life. While Padeswood is predicted to be delivered in the next three years, more immediate changes include 50 per cent more trains on the North Wales mainline, more trains between Chester and Wrexham and the start of the roll out of Pay as You Go delivering better transport in the region.
The Padeswood upgrade, which unlocks capacity on the Wrexham-Bidston line, looks like a 3-year project.
Increases in services on the North Wales main line should come sooner, once foot crossings are upgraded, and includes extension of the Liverpool-Chester service into Wales (Llandudno/Wrexham).
 

MarlowDonkey

Established Member
Joined
4 Apr 2013
Messages
1,869
so I guess some people here will know what lies behind the summaries.
Wellington and Cullompton were intermediate stations on the line from Taunton to Exeter closed in the Beeching era. There's been a proposal to reinstate them for some time as part of a general improvement of local services in the Exeter area. The term Devon Metro is sometimes used.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,350
Still doesn't solve "The MML mystery".

NR appear to be ploughing ahead with further electrification by pegging out mast locations, removing lineside vegetation and most significantly performing bridge works and track lowering.
Meanwhile there has been no confirmation of further funding from the government beyond the current limit of electrification, and the MML gets no mentions at all in any infrastructure announcement.

This announcement leaves us none the wiser. So we wait and scratch our heads.
Ssshhhhhh! Maybe it is going on under the radar, disguised within a maintainance budget!
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,103
Location
Redcar
Just a quick note that the Midland Rail Hub has it's own thread which can be found here.
 

JKF

Established Member
Joined
29 May 2019
Messages
1,313
Curious what ‘new housing development’ the Portishead line is supposed to be supporting, unless they mean all the stuff that went up around the docks about 15-20 years ago? (Which also severed the line and prevented a new station actually in the town!). I suspect they’re conflating it with the proposed Brabazon station on the reopened Henbury branch which will support a huge development on the old Filton airfield, that’s had a few mentions recently.

(There is also some new housing going up in Ashton, but funding for that station hasn’t been agreed yet I believe, and will come later)
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,429
Location
Somerset
Curious what ‘new housing development’ the Portishead line is supposed to be supporting, unless they mean all the stuff that went up around the docks about 15-20 years ago? (Which also severed the line and prevented a new station actually in the town!). I suspect they’re conflating it with the proposed Brabazon station on the reopened Henbury branch which will support a huge development on the old Filton airfield, that’s had a few mentions recently.
Note the subtle difference in wording when compared with Wellington & Cullompton. There it will “unlock” new housing (implying the housing isn’t there yet); at Portishead it will “support” it (ie “we’ve built a whole load of new houses and realise we’ve created gridlock).
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,494
Location
Taunton or Kent
Anyone know what the service provision plans for Wellington and Cullompton will be? I expect the Exeter-Cardiff Central trains will provide the backbone 1tph service, but could any extras call there, particularly in the peaks? Also, would trains that call at these stations also serve Tiverton Parkway or skip it? Calling at all three could block the line if not well pathed, and may not be 100% necessary given Cullompton and Tiverton Pkwy are not too far apart, especially if the former draws in some of the passengers who already use the latter.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,640
Location
Hampshire
Still doesn't solve "The MML mystery".

NR appear to be ploughing ahead with further electrification by pegging out mast locations, removing lineside vegetation and most significantly performing bridge works and track lowering.

Meanwhile there has been no confirmation of further funding from the government beyond the current limit of electrification, and the MML gets no mentions at all in any infrastructure announcement.

This announcement leaves us none the wiser.

So we wait and scratch our heads.
Seems to be “Paused” according to the DfT. Sigh.


Midland Mainline Electrification Phase 3 (RNEP)The next phase of electrification of the Midland Main Line has been paused. Given the exisiting trains in use on this stretch of railway and the costs and time needed to electrify the route we are focusing our investment on other schemes over the SR period. We will continue to keep the potential for full electrification of the route under review as part of our plans to decarbonise our railways and as funding becomes available in future.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,158
Location
West Wiltshire
The full list of road and rail schemes now published


Anyone know what the service provision plans for Wellington and Cullompton will be? I expect the Exeter-Cardiff Central trains will provide the backbone 1tph service, but could any extras call there, particularly in the peaks? Also, would trains that call at these stations also serve Tiverton Parkway or skip it? Calling at all three could block the line if not well pathed, and may not be 100% necessary given Cullompton and Tiverton Pkwy are not too far apart, especially if the former draws in some of the passengers who already use the latter.
For Wellington it says
Building a new station at Wellington, that will provide new connections to regional centres, supporting economic growth and planned housing in the area. This supports significant expansion plans for the town and the new station and services will be critical to allowing local people to access jobs at major employment centres such as Exeter.
For Cullompton it says
Building a new station at Cullompton, that will provide new connections to regional centres, supporting economic growth and planned housing in the area. This supports significant expansion plans for the town and the new station and services will be critical to allowing local people to access jobs at major employment centres such as Exeter.
So looks like both will have services to Exeter (and of course the major employment centres in Exeter area are nearer Central and Marsh Barton stations), so anyone's guess what services will be provided.
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,911
Location
Cambridge, UK
I notice there is no mention of the Ely Area Capacity Enhancement (EACE) project on the list, so do we assume that's been kicked into the long grass?
 

MrJeeves

Established Member
Associate Staff
Senior Fares Advisor
Joined
28 Aug 2015
Messages
4,692
Location
Burgess Hill
I do enjoy that Wivelsfield is claimed to get a "feasibility study" for accessibility improvements, whilst the access for all contruction plans and drawings were already created by early 2024...

How many more times can Access for All be reannounced?
 

SamYeager

Member
Joined
20 Mar 2014
Messages
352
Interesting to see the cut and paste job for both Wellington & Cullompton. Surprised they didn't mention Taunton as well as Exeter for Wellington.
 

MPW

Member
Joined
2 Dec 2021
Messages
268
Location
Orpington
The optimist in me hopes there will be more funding made available soon after the government pipeline is published. No point taxpayers funding a project now if there's potential for private investment in the not too distant future (eg through development).

The realistic in me reminds the optimist how many times we've been told recently that money is tight and to reign in expectations.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,429
Location
Somerset
Presumably this funding is separate from the awards to the mayoral authorities announced a few weeks ago? Assuming it is as most rail projects aren’t really “combined authority” types - Portishead is hopefully then in addition to the money for WECA transport.
 

mailbyrail

Member
Joined
23 Dec 2010
Messages
397
Did anyone spot the justification on the HMG listing for the Chesterfield-Staveley road works!!

Chesterfield Staveley Regeneration Route6km single-carriageway with parallel provision for non-motorised users, connecting Chesterfield to allocated regeneration sites and to proposed HS2 Infrastructure Maintenance Depot at Staveley.
 

Mollman

Established Member
Joined
21 Sep 2016
Messages
1,717
Location
Preston
Seems to be “Paused” according to the DfT. Sigh.

Operator orders bi-modes due to slow and uncertain rollout of electrification. Government 'pauses' electrification because operator has ordered bi-modes. We just need bionic duckweed to make an appearance!
 

OneOfThe48

Member
Joined
6 Mar 2023
Messages
280
Location
London
I do enjoy that Wivelsfield is claimed to get a "feasibility study" for accessibility improvements, whilst the access for all contruction plans and drawings were already created by early 2024...

How many more times can Access for All be reannounced?

As many times as is necessary!

See also the announcement of South Croydon in the 2020 budget and then again in 2024 as a ‘feasibility study’ station
 

lachlan

Member
Joined
11 Aug 2019
Messages
1,171
Did anyone spot the justification on the HMG listing for the Chesterfield-Staveley road works!!

Chesterfield Staveley Regeneration Route6km single-carriageway with parallel provision for non-motorised users, connecting Chesterfield to allocated regeneration sites and to proposed HS2 Infrastructure Maintenance Depot at Staveley.
Although it's good they are providing a cycle track there's already a route along the river which will no doubt be much less pleasant once a bypass is built near it.

I wonder if this was originally part of the HS2 project?
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Still doesn't solve "The MML mystery".

NR appear to be ploughing ahead with further electrification by pegging out mast locations, removing lineside vegetation and most significantly performing bridge works and track lowering.

Meanwhile there has been no confirmation of further funding from the government beyond the current limit of electrification, and the MML gets no mentions at all in any infrastructure announcement.

This announcement leaves us none the wiser.

So we wait and scratch our heads.
Look East says it covers the wiring of the section south of Leicester (South Jn) only towards Kettering

I notice there is no mention of the Ely Area Capacity Enhancement (EACE) project on the list, so do we assume that's been kicked into the long grass?
Look East says that has been paused again.

Most of the funding has been allocated to roads by the look of it. This is disappointing as tolls on schemes such as Lower Thames Crossing could pay for some of the road schemes.
 

Adrian1980uk

Member
Joined
24 May 2016
Messages
841
I notice there is no mention of the Ely Area Capacity Enhancement (EACE) project on the list, so do we assume that's been kicked into the long grass?
Feels to me this has all hallmarks of another I turn that will cost more as they can't descope existing announced projects, I feel this and the mml electrification pause will become uncomfortable for the government in the next few years as rail traffic grows.
 

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,661
Do any of the road schemes assist with reducing traffic over/closing level crossings and under rail bridges with height restrictions?

I note the Middlewich project. Does that impact the proposed rail scheme?
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,014
Location
Surrey
I notice there is no mention of the Ely Area Capacity Enhancement (EACE) project on the list, so do we assume that's been kicked into the long grass?
Well given Felixstowe has shed of load of traffic to London Gateway with those extra trains running via London that driver has disappeared for the time being.
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,911
Location
Cambridge, UK

thejuggler

Established Member
Joined
8 Jan 2016
Messages
1,648
Great to see the A66 covered by this announcement. Long overdue.
I hope it includes new interchanges with slip roads rather than roundabouts at Penrith and Scotch Corner, as that's where the main hold ups are.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,283
I hope it includes new interchanges with slip roads rather than roundabouts at Penrith and Scotch Corner, as that's where the main hold ups are.
There’s nothing in any of the scheme consultation stuff about the M6 and A1(M) interchanges, it’s all about how to dual 8 various separate single carriageway sections, however there seems to be major changes at the A6 junction to build an underpass.
 

Western Lord

Member
Joined
17 Mar 2014
Messages
1,064
Anyone know what the service provision plans for Wellington and Cullompton will be? I expect the Exeter-Cardiff Central trains will provide the backbone 1tph service, but could any extras call there, particularly in the peaks? Also, would trains that call at these stations also serve Tiverton Parkway or skip it? Calling at all three could block the line if not well pathed, and may not be 100% necessary given Cullompton and Tiverton Pkwy are not too far apart, especially if the former draws in some of the passengers who already use the latter.
As ever, one person's new station is another person's extended journey time.
 

Sealink

Member
Joined
16 Aug 2006
Messages
882
Location
Bridport
I do enjoy that Wivelsfield is claimed to get a "feasibility study" for accessibility improvements, whilst the access for all contruction plans and drawings were already created by early 2024...

How many more times can Access for All be reannounced?

Same announcement for Dorchester South.

It took ten years for Dorchester West to become accessible from the first announcement so I am not holding out much hope for a quick resultm.

Dorchester West has a train in each direction roughly every two hours.
Axminster (fully accessible) has an hourly service.

Dorchester South. Two trains an hour in each direction.... still waiting.
 