Certainly not today there was not.There was a 3 hour gap this afternoon between the 1255 Plymouth to Paddington and the next HST departure to Paddington at 1600.There is no 1400 departure anyway,you have to get the 1341 150 unit to Newton Abbot to connect into the 1415 Paignton/Paddington.To make matters worse the 1106 Paddington/Plymouth was terminated short at Newton Abbot due to late running so there was no 1500 Paddington service either from Plymouth today,passenger were again wedged(and I mean wedged) onto a 2 car 150 from Plymouth to Newton Abbot.As has been mentioned already things are pretty grim on Great Western these days in Devon and Cornwall west of Exeter being so far away as we are from FGWs and indeed the Dafts beloved M4 corridor. Acccording to the latest "rail" magazine FGW high speed(HSS) services are now almost at the bottom of the performance table according to latest Office of Rail Regulation figures just 0.1 points between FGW and East coast(83.0% punctually)Both EC and FGW HSS have been consistently declining since late 2009 although better performance on FGWs Thames Valley and regional services has masked the effects of HSS delays to give the operator better overall figures than EC.Many people in this forgotten corner of the Great Western Franchise will be glad to see a new broom take over in 2013.
And things are going to get better under the likes of Arriva? Or Stagecoach? Or NX?
Don't forget, how much of a pinch point the Thames Valley is...First can hardly be blammed for such problems as the signalling wires going missing in various places along the route - like the slough incident for example...and delays and problems such as last nights Incidents at Reading West! (Not that im saying you are)
And...Just be glad that you could at least get to Newton Abbot! Last saturday, down here...Buses were laid on for the reading branch passengers to get up to Reading, But those people travelling north on XC?...Apart from the diverted services...Fancy being stuck in Basingstoke?...Last week, 142001 & A 150 Even worked a HST Replacement service as far as Swindon - Sorry, would you rather have that with deccent connections being publicised en route (Paington service affected, Change for the Plymouth service behind, Change at Bristol Temple Meads for a faster service or Service up to Parkway, Change at Swindon)....Or having your service cancelled altogether?
The problem is, is that with a service like that, The train crew are likely to be the same staff working it back...So if it continues onto Plymouth, then the it eates back into the traincrews hours - Ie...Could work to Plymouth, But on the way back, may have to terminate at reading due to traincrew out of hours...As well as affecting its path back into london - It's better to terminate short and run back ontime, than running all the way through but buggering up the paths on the way back...delaying thurther services.
first should not even be allowed to re-bid for franchise. you hear mcnulty saying there is too much money wasted in the railway, well how is it right that first can hand in franchise notice, when they are supposed to start paying money back to the government, and then win the franchise and get given about 2 billion pound to run it again. surely that is the biggest waste of money ever
And it's not as if anyone else does it do they...Oh Wait, They Do!
http://www.guardian.co.uk/business/2009/apr/19/stagecoach-losses
http://www.guardian.co.uk/business/2009/jul/03/rail-franchises-contracts-subsidies
So let me see, who else recieves money under Cap & Collar?
East Midland Trains,
Arriva's CrossCountry;
Northern Rail;
Southeastern...
Read and Remember what has been said numerous times before by ainsworth74, And considering how much change the Great Western Mainline is due to take on from this year onwards, Is it any wonder why First took the break point clause...Becuase you can either run a ending franchise through a building site designed not to take as much of the works into account, or restart the franchise with the works taken into account! Afterall, the Franchise was always a 7 Year franchise anyway - 2006 to 2013 anyway!